METHODE "OMO" POUR L'ORGANISATION DE LA MAIN D'OEUVRE EN CONSTRUCTION, ADAPTEE A LA ROUTE

METODO "OMO" PARA LA ORGANIZACION DE LA MANO DE OBRA EN LA CONSTRUCCION, ADAPTADA A LA CARRETERA

CETTE METHODE D'ORGANISATION DU PERSONNEL DES TRAVAUX DE CONSTRUCTION CONSISTE A FRACTIONNER LES OUVRAGES A REALISER, CE QUI PERMET D'OBTENIR UN RENDEMENT ACCRU, UN CONTROLE DE LA QUALITE ET UNE POSSIBILITE D'ETABLIR UN SYSTEME DE PRIMES SUR LES TRAVAUX EFFECTUES. LA METHODE DIVISE AU PREALABLE LA TOTALITE DE L'OUVRAGE EN FRACTIONS, DANS LESQUELLES ON DISTINGUE A LEUR TOUR LES TRAVAUX QUI RELEVENT DE DIFFERENTES SPECIALITES. ELLE A ETE UTILISEE PAR L'ADMINISTRATION DANS PLUSIEURS DE SES OUVRAGES ET EST APPLICABLE A TOUS LES TYPES DE TRAVAUX, A CONDITION QU'ILS NE SOIENT PAS TROP REDUITS. SON FONCTIONNEMENT NE REQUIERT QU'UNE PETITE EQUIPE TECHNIQUE QUI SE CHARGE DE PROCEDER AU FRACTIONNEMENT PREALABLE PUIS A LA REVISION POSTERIEURE DES TRAVAUX REALISES. ON PARVIENT AINSI A AMELIORER LA QUALITE, A REDUIRE LE COUT DE L'OUVRAGE ET A FACILITER LE RESPECT DES DELAIS D'EXECUTION. LA METHODE N'INCLUT NI L'ELABORATION DU PLAN DE L'OUVRAGE, NI LA FIXATION DES BESOINS DE MAIN D'OEUVRE, DE MACHINES ET DE MATERIAUX. VOIR FICHE GENERALE DIRR 108569 ET FICHES DETAILLEES 108570 A 108594.

  • Authors:
    • PEZZI, F
  • Publication Date: 1976-10

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01294302
  • Record Type: Publication
  • Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
  • Files: ITRD
  • Created Date: Nov 21 2010 4:31AM