COMMISSION III. DOCUMENT NO 22: CONSTRUCTION OF THE BITUMINOUS TRIANGLE: TRELEW-COMODORO-RIVADAVIA-SARMIENTO- ESQUEL-TRELEW. GEOLOGICAL STUDY FOR HIGHWAY APPLICATION

COMISION III. DOCUMENTO N.22: CONSTRUCCION DEL TRIANGULO ASFALTICO TRELEW-COMODORO-RIVADAVIA-SARMIENTO-ESQUEL-TRELEW. ESTUDIOS GEOLOGICOS DE APLICACION VIAL

WITH THE AIM OF GIVING AN IMPETUS TO THE AGRICULTURAL AND INDUSTRIAL DEVELOPMENT AND PARTICULARLY TO INCREASE TOURISM IN THE AREA OF THE CORDIELLERE SUD, THE PROVINCIAL DIRECTORATE OF HIGHWAYS OF THE CHUBUT REGION PROPOSED TO SURFACE WITH BITUMINOUS MIXTURE, NATIONAL HIGHWAYS 3, 25, 26 AND 40 AND PROVINCIAL HIGHWAYS 19 AND 20, WITH THE AID OF THE FOUNDATION FOR TERRITORIAL INTEGRATION AND THE NATIONAL HIGHWAYS DIRECTORATE. THE PAPER OUTLINES THE GEOLOGICAL STUDY ON WHICH TO BASE THE HIGHWAY PROJECT. FOR THE COVERING ABSTRACT, SEE IRRD ABSTRACT NO 106370, SEE ALSO IRRD ABSTRACTS NOS 106372, 106398-417.

  • Authors:
    • FONSECA, A
  • Publication Date: 1972-12

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01293768
  • Record Type: Publication
  • Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
  • Files: ITRD
  • Created Date: Nov 21 2010 4:18AM