COMMISSION 1: DOCUMENT NO 36: COST VARIATIONS IN CONTRACTED WORKS. SYSTEMS FOR THEIR DETERMINATION AND GUARANTEE. MEASURES FOR THEIR IMPROVEMENT

COMISION I: DOCUMENTO N. 36: VARIACIONES DE COSTOS EN LAS OBRAS POR CONTRATO. SISTEMA PARA SU DETERMINACION Y CERTIFICACION. MEDIDAS PARA SU MEJORA

THIS ARTICLE ESTABLISHES A SYSTEM ALLOWING COST VARIATIONS IN CONTRACTED WORKS TO BE DETERMINED. IN 1946, FOLLOWING LARGE INCREASES IN COSTS UNKNOWN IN THE PAYMENT OF PUBLIC WORKS CONTRACTS, LAW NO 12910 WAS PROMULGATED WHICH TENDED TO COMPENSATE THE GREATEST PART OF OUTGOINGS WHICH CONTRACTING PARTIES HAD TO COMPLY WITH IN ORDER TO FULFIL CONTRACTS UNDER CONSTRUCTION. THE APPLICATION OF PROGRAMMING TO THE PROCEDURE OF CERTIFICATION OF COSTS IS STUDIED, ON THE BASIS OF RECORDS OF WORKS, TRANSITORY, IN WHICH FIGURE THE CHECK LISTS INDICATING THE STRUCTURE TO BE CERTIFIED. FINALLY MEASURES ARE GIVEN ALLOWING COST VARIATIONS TO BE IMPROVED AND THE NECESSITY OF EXPLICITLY SHOWING THE BASE VALUES IN THE SPECIFICATION IS EMPHASISED. FOR THE COVERING ABSTRACT, SEE IRRD ABSTRACT NO 106370, SEE ALSO IRRD ABSTRACTS NOS 106371, 106377-97.

  • Authors:
    • DIAZ, C J
  • Publication Date: 1972-12

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01293751
  • Record Type: Publication
  • Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
  • Files: ITRD
  • Created Date: Nov 21 2010 4:18AM