L'ESSAI DU TUNNELIER BOUYGES A COGEMA CROUZILLE

L'AUTEUR PRESENTE UN ESSAI D'UTILISATION PAR LA DIVISION MINIERE DE LA CROUZILLE, DU TUNNELIER BOUYGUES, COMMENCE EN FEVRIER 1978 ET NON ACHEVE. CET ESSAI PERMETTAIT D'OBTENIR APRES 3 MOIS LES RESULTATS SUIVANTS AVEC LA MARCHE EN UN POSTE : 1) AVANCEMENT MOYEN PAR POSTE : 2,80 M ; 2) CONSOMMATION D'ENERGIE : 700 KWH PAR METRE, L'ENSEMBLE ETANT CONDUIT PAR 5 HOMMES ; 3) REALISATION DE COURBES DE 40 M DE RAYON. ON ESPERE QU'AVEC DES OUTILS MOINS SENSIBLES A L'ABRASION, LA VITESSE D'AVANCEMENT POURRAIT ETRE PORTEE A 5 M/POSTE ET LE PRIX DE REVIENT REDUIT DE 30 A 50 % DE CELUI DE LA METHODE CONVENTIONNELLE, CE QUI PERMETTRAIT D'UTILISER LE MATERIEL BOUYGUES POUR L'INFRASTRUCTURE D'UN NOUVEAU SIEGE (A).

Language

  • French

Media Info

  • Pagination: 1-6
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 01290536
  • Record Type: Publication
  • Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
  • Files: ITRD
  • Created Date: Nov 21 2010 2:15AM