WATER, SOIL AND CONSTRUCTION. STUDY DAY 18 JANUARY 1977. THEME 4: WATERTIGHT BARRIERS, BARRIERS CREATED BY BURIED STRUCTURES

EAU, SOL ET CONSTRUCTION - JOURNEE D'ETUDES DU 18 JANVIER 1977. THEME 4 : BARRIERES D'ETANCHEITE, BARRIERES CREEES PAR LES OUVRAGES ENTERRES

THIS THEME CONTAINS 3 REPORTS DEALING WITH THE ACTION OF WATERTIGHT BARRIERS. THE FIRST IS CONCERNED WITH THE HYDRAULIC BARRIER OF THE SEAHAM WEIR JETTY IN AUSTRALIA. THE SECOND REPORT STUDIES THE USEFULNESS OF A GOOD KNOWLEDGE OF THE BEHAVIOUR OF WATER TABLES FOR CIVIL ENGINEERING WORKS. THE THIRD REPORT OUTLINES THE MEASURES TAKEN IN THE CASE OF BARRIERS CREATED BY 3 UNDERGROUND RAILWAY LINES, TO REESTABLISH THE WATER TABLE FLOW CONDITIONS AS THEY WERE BEFORE CONSTRUCTION. FOR THE COVERING ABSTRACT SEE IRRD ABSTRACT NO 107282.

  • Availability:
  • Authors:
    • BRULOIS, J
    • ROUSSELOT, D
    • HAFFEN, M
  • Publication Date: 1977-11

Language

  • French

Media Info

  • Pagination: 129-54
  • Serial:
    • ANN ITBTP
    • Issue Number: 355 (SOLS FOND-146)
    • ISSN: 0020-2568

Subject/Index Terms

Filing Info

  • Accession Number: 01288281
  • Record Type: Publication
  • Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
  • Files: ITRD
  • Created Date: Nov 21 2010 1:14AM