UN CINQUIEME PONT POUR ROUEN
LES AUTEURS PRESENTENT LA CONSTRUCTION DU PONT MATHILDE, CINQUIEME PONT DE ROUEN, LONG DE 600M, ENJAMBANT L'ILE LACROIX ET FRANCHISSANT LES DEUX BRAS DE LA SEINE. IL EST CONSTITUE PAR UN OUVRAGE CENTRAL EN BETON PRECONTRAINT AU-DESSUS DE L'ILE, D'UNE LONGUEUR DE 251M, DEUX TRAVEES METALLIQUES AU-DESSUS DES BRAS DE LA SEINE (115M DE LONGUEUR POUR CELLE DE LA RIVE GAUCHE, ET 114M POUR CELLE DE LA RIVE DROITE), UN OUVRAGE D'ACCES RIVE GAUCHE EN BETON PRECONTRAINT A TROIS TRAVEES, ET UN OUVRAGE D'ACCES SUR LA RIVE DROITE CONSTITUE PAR UNE DALLE BIAISE EN BETON ARME DE 24,50M DE PORTEE. L'OUVRAGE CENTRAL COMPORTE TROIS TRAVEES INTERMEDIAIRES (66,50M, 58M ET 66,50M) ET DEUX TRAVEES EN ENCORBELLEMENT FORMANT CANTILEVER SUR LA SEINE ET AUX EXTREMITES DESQUELLES S'APPUIENT LES TRAVEES METALLIQUES EN ALIGNEMENT DROIT ET EN PROLONGEMENT DES CANTILEVERS. LES PRINCIPALES CARACTERISTIQUES DE L'OUVRAGE SONT INDIQUEES : FONDATIONS SUR PIEUX, PILES, TABLIER DE L'OUVRAGE CENTRAL EN BETON PRECONTRAINT CONSTITUE PAR DEUX CAISSONS D'INERTIE VARIABLE A AMES VERTICALES (PROCEDES DE PRECONTRAINTE V.S.L.), TABLIERS METALLIQUES CONSTITUES PAR UNE DALLE BIAISE ORTHOTROPE ASSOCIEE A DEUX POUTRES ISOSTATIQUES, JONCTION TABLIERS METALLIQUES-CONSOLES BETON, APPUIS ET JOINTS, CHAPE D'ETANCHEITE, GLISSIERES ET GARDE-CORPS. L'ARTICLE SE TERMINE SUR LE PLANNING DE REALISATION, LES PRINCIPALES DIFFICULTES RENCONTREES, LES INCIDENTS ET LES COUTS DES TRAVAUX.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/00269700
-
Authors:
- Neron, P
- AMIOT, V
- Publication Date: 1979-12-17
Language
- French
Media Info
- Pagination: 12-6
-
Serial:
- MONIT TRAV PUBLICS BATIM
- Issue Number: 51
- ISSN: 0026-9700
Subject/Index Terms
- TRT Terms: Box girders; Bridge decks; Bridge members; Bridges; Cantilevers; Construction; Costs; Length; Metal bridges; Orthotropic plates; Prestressed concrete; Reinforced concrete; Skew bridges
- Uncontrolled Terms: Bridge spans
- Geographic Terms: France; Rouen (France)
- ITRD Terms: 4794: Beton arme; 4796: Beton precontraint; 3450: Cantilever; 3655: Construction (execution); 224: Cout; 3490: Dalle orthotrope; 8036: France; MODE DE CONSTRUCTION; 3455: Pont; 3448: Pont biais; 3465: Pont metallique; 3474: Poutre caisson; 3482: Tablier de pont; 3452: Travee
- Subject Areas: Bridges and other structures; Construction; I21: Planning of Transport Infrastructure; I24: Design of Bridges and Retaining Walls; I53: Construction of Bridges and Retaining Walls;
Filing Info
- Accession Number: 01285830
- Record Type: Publication
- Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
- Files: ITRD
- Created Date: Nov 20 2010 11:41PM