CALENDAR-DAY CPM

THE SPEED OF PERFORMANCE OF AN OPERATION ON A CONSTRUCTION PROJECT IS DEPENDENT UPON THE TIME OF YEAR WHEN THE OPERATION IS DONE. THE CRITICAL PATH METHOD (CPM) IS A USEFUL CONSTRUCTION PLANNING TOOL, BUT OF LIMITED VALUE IN CONSTRUCTION SCHEDULING. THE BAR CHART TECHNIQUE OF PLANNING AND SCHEDULING ALLOWS FOR THE EXPLICIT INTEGRATED TREATMENT OF THE HOW/HOW-LONG/WHEN ASPECTS OF AN OPERATION, BUT EMPLOYS A NOTATION THAT DOES NOT PERMIT PRECISE DEFINITION OF THE RELATIONSHIPS AMONG THE OPERATIONS. A PROCEDURE COMBINING THE NOTATION OF CPM AND THE SOLUTION PROCESS OF THE BAR CHART TECHNIQUE IS CALENDAR-DAY CPM. EXAMPLES ARE PRESENTED OF THE APPLICATION OF THE CALENDAR-DAY CPM NETWORK OF OPERATIONS. CALENDAR-DAY CPM IS A PLANNING AND SCHEDULING PROCEDURE WHICH PROVIDES THE PRECISION REQUIRED IN DEFINING OPERATIONS AND THE RELATIONSHIPS AMONG OPERATIONS, WHILE UTILIZING A SOLUTION PROCESS WHEREIN THE DURATION OF THE OPERATION IS CORRELATED WITH THE TIME OF YEAR IN WHICH IT IS PERFORMED. IT PROVIDES THE PERCISION AND INTEGRATION IN PLANNING AND SCHEDULING REQUIRED TO OBTAIN REALISTIC PLANS AND SCHEDULES OF CONSTRUCTION PROJECTS.

  • Availability:
  • Supplemental Notes:
    • Vol 39, No 8, PP 65-68, 4 TAB,
  • Authors:
    • Shaffer, L R
  • Publication Date: 1969-8

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00215236
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Feb 9 1970 12:00AM