OHIO'S FIRST EXPERIENCE WITH SLIP-FORM PAVING

THE SUCCESSFUL CONSTRUCTION IS DESCRIBED OF APPROXIMATELY 8 MI OF PLAIN CONCRETE PAVEMENT ON THE SECONDARY HIGHWAY SYSTEM IN OHIO USING THE SLIP-FORM TECHNIQUE. DESIGN FEATURES, AS WELL AS CONSTRUCTION EXPERIENCES, ARE REPORTED. THE PAVEMENT WAS CONSTRUCTED ON EARTH SUBGRADE ON FILLS AND ALL CUTS EXCEPT FOR ROCK CUTS WHERE A 4-IN. SUBBASE WAS SPECIFIED. THE GRADE WAS PREPARED USING AN AUTOMATIC SUBGRADER. CONCRETE WAS PRODUCED IN A CENTRAL MIX PLANT ERECTED ON THE PROJECT AND HAULED TO THE PAVING SITE IN TRUCKS WITH DUMP BODIES. A SLIP-FORM PAVER, WITHOUT AUTOMATIC CONTROLS, WAS USED TO EXTRUDE THE CONCRETE INTO A 24-FT BY 7-IN. CONCRETE PAVEMENT. /AUTHOR/

  • Record URL:
  • Supplemental Notes:
    • Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the Transportation Research Board of the National Academy of Sciences. Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy of Sciences. All rights reserved.
  • Authors:
    • Dixon, John C
    • Marshall, H E
  • Publication Date: 1965

Media Info

  • Media Type: Digital/other
  • Features: Appendices; Photos; Tables;
  • Pagination: pp 8-17
  • Monograph Title: Symposium on Slip-Form Paving
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00214417
  • Record Type: Publication
  • Files: TRIS, TRB
  • Created Date: Sep 29 1994 12:00AM