LE PONT SUR LA VOIE 3 DE CERGY PONTOISE (VAL D'OISE)
SITUE SUR LA VOIE 3 DE LA VILLE NOUVELLE DE CERGY-PONTOISE, L'OUVRAGE D'UNE LONGUEUR TOTALE DE 141,60 M FRANCHIT L'OISE SUIVANT UN BIAIS DE 70 GRADES. APRES AVOIR RAPPELE LES DIFFERENTES ETAPES DE L'ELABORATION DU PROJET DE BASE ET DE L'APPEL D'OFFRES, LES AUTEURS DECRIVENT LE PROJET RETENU, CONSISTANT A REALISER UN PONT POUSSE A 3 TRAVEES EN BETON PRECONTRAINT SUIVANT LA TECHNIQUE DITE DU "POUSSAGE BILATERAL" AVEC UN CABLAGE PARTIELLEMENT EXTERIEUR AU BETON: DESCRIPTION DE L'OUVRAGE - PROJET D'EXECUTION - EXECUTION DES TRAVAUX - TECHNOLOGIE ET MISE EN OEUVRE DE LA PRECONTRAINTE EXTERIEURE. L'ARTICLE CONCLUT SUR LES AVANTAGES DE LA PRECONTRAINTE EXTERIEURE POUR LES PONTS POUSSES A 3 TRAVEES TYPE CERGY-PONTOISE. (A).
-
Authors:
- FALEMPIN, M
- SIMON, J E
- GLASSON, J -
- LACROIX, A
- VILLETTE, P
- SERVANT, C
- Publication Date: 1988-10
Language
- French
Media Info
- Pagination: 56-66
-
Serial:
- Travaux
- Issue Number: 636
- Publisher: Federation Nationale des Trav Publ & des Synd Aff
Subject/Index Terms
- TRT Terms: Box girders; Bridge members; Bridges; Construction; Construction sites; Launching; Length; Prestressed concrete; Prestressing
- Uncontrolled Terms: Bridge spans; Outside; Three
- Geographic Terms: France
- ITRD Terms: 4796: Beton precontraint; CERGY-PONTOISE; 3628: Chantier; 3655: Construction (execution); 9058: Exterieur; 8036: France; 3455: Pont; 3412: Poussage (pont); 3474: Poutre caisson; 4777: Precontrainte; 3452: Travee; 9079: Trois
- Subject Areas: Bridges and other structures; Construction; I24: Design of Bridges and Retaining Walls; I53: Construction of Bridges and Retaining Walls;
Filing Info
- Accession Number: 01259526
- Record Type: Publication
- Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
- Files: ITRD
- Created Date: Nov 20 2010 9:37AM