LES AVANCEES DE LA TECHNIQUE ROUTIERE - L'ANNEE 1989 EN FRANCE - RENFORCEMENT ET ALLONGEMENT DE LA PISTE DE LORIENT - LANN-BIHOUE EN BETON ARME CONTINU
Apres une presentation de l'operation consistant a renforcer et allonger la piste de Lorient - Lann-Bihoue en beton arme continu, les auteurs decrivent le choix du renforcement en BAC, la conception du renforcement et les conditions de realisation. (Titre en anglais: Strides in highway engineering. The year 1989 in France. Overlaying and extension of Lorient - Lann-Bihoue runway in continuously reinforced concrete).
-
Authors:
- NEGRE, J -
- GOUX, M T
- LEFEBVRE, J -
- Publication Date: 1989-12
Language
- French
- English
Media Info
- Pagination: 41-6
-
Serial:
- REVUE GENERALE DES ROUTES ET DES AERODROMES
- Issue Number: 669
Subject/Index Terms
- TRT Terms: Airport runways; Airports; Continuous structures; Length; Pavement design; Reinforced concrete; Rigid pavements; Slip form pavers; Structural strengthening; Thickness
- Uncontrolled Terms: Increase; Laying
- ITRD Terms: 9032: Accroissement; 1037: Aeroport; 4794: Beton arme; 2964: Chaussee rigide; 9006: Continu; 3055: Dimensionnement des chaussees; 5933: Epaisseur; 6488: Longueur; 3660: Machine a coffrage glissant; 3623: Mise en oeuvre (appl); 1038: Piste d'envol; 3096: Renforcement (chaussee)
- Subject Areas: Aviation; Highways; Pavements; I22: Design of Pavements, Railways and Guideways; I32: Concrete; I52: Construction of Pavements and Surfacings; I61: Equipment and Maintenance Methods;
Filing Info
- Accession Number: 01253827
- Record Type: Publication
- Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
- Files: ITRD
- Created Date: Nov 20 2010 6:56AM