LEAN CONCRETE FOUNDATIONS FOR RAND CONSTRUCTION IN URBAN AREAS /IN FRENCH/

DETAILS ARE GIVEN OF A CARRIAGEWAY STRENGTHENING PROJECT FOR THE TOWN OF SAVERNE. THE PROJECT CONSISTED OF THE REMOVAL OF THE EXISTING PAVEMENT, WHICH WAS COMPLETELY DAMAGED OVER A DEPTH OF 50 CM, THE APPLICATION OF A FIRST GRAVEL-SLAG FOUNDATION LAYER 25 CM THICK, A 20 CM THICK ROAD BASE OF THE SAME MATERIAL, AND THE CONSTRUCTION OF A 5 CM ASPHALTIC CONCRETE WEARING COURSE. BECAUSE OF THE PRESENCE OF THE CLAYEY SUBGRADE AND SERVICE MAINS, IT WAS DECIDED TO REPLACE THE GRAVEL-SLAG SUBBASE BY A LEAN CONCRETE LAYER OF THE SAME THICKNESS. TWO FORMULAE WERE USED: ONE FOR CONVENTIONAL LEAN CONCRETE, THE OTHER FOR HIGH-QUALITY LEAN CONCRETE. FORTY-EIGHT HOURS AFTER THE APPLICATION OF THE CONCRETE, THE GRAVEL-SLAG ROAD BASE WAS LAID WITHOUT ANY TROUBLE. /TRRL/

  • Authors:
    • Lansoy, M G
    • Gernez, J M
  • Publication Date: 1971-5

Language

  • English

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00213154
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • Files: TRIS
  • Created Date: May 15 1973 12:00AM