The report of the new Ugachi bridge pier and caisson constructed by pre-cast segmental method
The new Ugachi Bridge was planned and designed to recover from seismic disaster damage. The uppermost requirement for the construction was a short construction period to restore traffic as soon as possible. For this requirement a new construction method of the bridge pier and caisson was proposed, which was the Pre-cast (PCa) segmental method. In this method PCa blocks are joined by a loop joint method horizontally at first, and then these joined PCa members are assembled by a mortar joint method vertically. The PCa blocks are manufactured at the factory, and then transported to the site and joined. The PCa segmental method has many merits, such as shorter construction period, lower cost, and lower environmental influence. (a) For the covering entry of this conference, please see ITRD abstract no. E214938.
-
Authors:
- EBINA, T
- TOISHI, K
- SHIMA, H
- NAKAI, M
- ARAKAWA, K
- Publication Date: 2006-11
Language
- English
Media Info
- Pagination: 22P
-
Serial:
- ROAD ENGINEERING ASSOCIATION OF ASIA AND AUSTRALASIA (REAAA) CONFERENCE, 12TH, 2006, PHILIPPINES
- Publisher: ROAD ENGINEERING ASSOCIATION OF THE PHILIPPINES
Subject/Index Terms
- TRT Terms: Bridge piers; Bridges; Caissons; Conferences; Construction; Construction management; Design; Precast concrete
- ITRD Terms: 3455: Bridge; 3434: Bridge pier; 3389: Caisson; 8525: Conference; 3655: Construction; 3666: Construction method; 9011: Design (overall design); 4792: Precast concrete
- Subject Areas: Bridges and other structures; Construction; Design; I24: Design of Bridges and Retaining Walls;