Sensitivity Analysis of and Strategic Plan Development for the Implementation of the M-E Design Guide in TXDOT Operations - Volume 1 and Volume 2

In this project, researchers conducted an extensive sensitivity analysis of the new Mechanistic-Empirical Pavement Design Guide, the development of default input files, and a review of current procedures to develop an implementation strategy and justification of the new pavement design guide. The sensitivity analysis was conducted for the primary design modules, for each level of input data (e.g., Level 1, 2, and 3). The objective of the sensitivity analysis was to determine to what degree the input parameters affect the performance of the initial design. In addition to the sensitivity analysis, the Texas Department of Transportation's (TxDOT's) current pavement design approach was reviewed and contrasted to the design guide to determine what additional tests or other changes will be needed for the implementation of the new design guide. Initial input materials parameters and regional calibration values were developed using available materials information and pavement performance data in TxDOT and research projects.

  • Supplemental Notes:
    • Project Title: Development of a Strategic Plan for the Implementation of the AASHTO 2002 Design Guide for TxDOT Operations. Report Date: August 2005; Resubmitted: January 2006; Published: October 2006.
  • Corporate Authors:

    Texas Transportation Institute

    Texas A&M University System, 3135 TAMU
    College Station, TX  United States  77843-3135

    Texas Department of Transportation

    Research and Technology Implementation Office, P.O. Box 5080
    Austin, TX  United States  78763-5080

    Federal Highway Administration

    1200 New Jersey Avenue, SE
    Washington, DC  United States  20590
  • Authors:
    • Freeman, Thomas J
    • Uzan, Jacob
    • Zollinger, Dan G
    • Park, Eun Sug
  • Publication Date: 2006-10

Language

  • English

Media Info

  • Media Type: Print
  • Edition: Technical Report
  • Features: Appendices; Figures; References; Tables;
  • Pagination: 636p

Subject/Index Terms

Filing Info

  • Accession Number: 01036482
  • Record Type: Publication
  • Report/Paper Numbers: FHWA/TX-05/0-4714-1, Report 0-4714-1
  • Contract Numbers: Project 0-4714
  • Files: TRIS, USDOT, STATEDOT
  • Created Date: Oct 31 2006 4:20PM