Monitoring and displacements at Heathrow express terminal 4 station tunnels

A wide variety of instrumentation was deployed during the construction of the sprayed-concrete lined tunnels at Heathrow Express Terminal 4 station. This paper presents data from the in-tunnel displacement monitoring system and for settlements above the tunnels providing data on instrument survival and performance, and an overall summary of the displacements arising from tunnel excavation.(A)

  • Availability:
  • Authors:
    • CLAYTON, C R
    • VAN DER BERG, J P
    • THOMAS, A H
  • Publication Date: 2006-6

Language

  • English

Media Info

  • Pagination: 323-334
  • Serial:
    • Geotechnique
    • Volume: 56
    • Issue Number: 5
    • Publisher: Thomas Telford Limited
    • ISSN: 00168505

Subject/Index Terms

Filing Info

  • Accession Number: 01030334
  • Record Type: Publication
  • Source Agency: Transport Research Laboratory
  • Files: ITRD
  • Created Date: Aug 7 2006 1:32PM