Monitoring and displacements at Heathrow express terminal 4 station tunnels
A wide variety of instrumentation was deployed during the construction of the sprayed-concrete lined tunnels at Heathrow Express Terminal 4 station. This paper presents data from the in-tunnel displacement monitoring system and for settlements above the tunnels providing data on instrument survival and performance, and an overall summary of the displacements arising from tunnel excavation.(A)
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/00168505
-
Authors:
- CLAYTON, C R
- VAN DER BERG, J P
- THOMAS, A H
- Publication Date: 2006-6
Language
- English
Media Info
- Pagination: 323-334
-
Serial:
- Geotechnique
- Volume: 56
- Issue Number: 5
- Publisher: Thomas Telford Limited
- ISSN: 00168505
Subject/Index Terms
- TRT Terms: Continuous structures; Excavation; Ground settlement; Measuring instruments; Motion; Surveillance; Tunnels
- ITRD Terms: 6155: Apparatus (measuring); 9006: Continuous; 5155: Excavation (process); 5483: Movement; 5792: Settlement; 9101: Surveillance; 3374: Tunnel
- Subject Areas: Bridges and other structures; Construction; I50: Construction and Supervision of Construction; I54: Construction of Tunnels;
Filing Info
- Accession Number: 01030334
- Record Type: Publication
- Source Agency: Transport Research Laboratory
- Files: ITRD
- Created Date: Aug 7 2006 1:32PM