DEVELOPMENT OF A DESIGN GUIDELINE FOR PHASE CONSTRUCTION OF STEEL GIRDER BRIDGES

Although phased construction offers the benefit of maintained traffic flow during construction several problems have been observed. Problems such as differential elevation of the phases and premature deterioration of the closure region were examined in this project. The Dodge Street Bridge over I-480 in Omaha, Nebraska, was replaced utilizing phased construction. The bridge was instrumented and then monitored during and after its construction. The results obtained from this extensive monitoring along with other case studies and numerical modeling provided insight into the causes and potential remedies of the observed problems. A number of recommendations and design aids were developed to assist in the design and construction of a steel girder bridge using phased construction.

  • Record URL:
  • Record URL:
  • Corporate Authors:

    University of Nebraska, Lincoln

    College of Engineering and Technology
    Lincoln, NE  United States  68503

    Nebraska Department of Roads

    1500 Highway 2, P.O. Box 94759
    Lincoln, NE  United States  68509
  • Authors:
    • Azizinamini, Atorod
    • Yakel, A J
    • Swendroski, J P
  • Publication Date: 2003-10

Language

  • English

Media Info

  • Media Type: Digital/other
  • Features: Appendices; Figures; Photos; References; Tables;
  • Pagination: 363 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00970566
  • Record Type: Publication
  • Report/Paper Numbers: SPR-PL-1(038)P530,, Final Report
  • Files: NTL, TRIS, STATEDOT
  • Created Date: Mar 25 2004 12:00AM