AN ASSESSMENT OF BENEFITS OF THE DENHAM ROUNDABOUT CONVERSION
Progressive deterioration in the operational performance of the large conventional roundabout at the A40/A4020/A412/M40 intersection in Denham resulted in the design by Buckinghamshire County Council of a new two-way circulatory (or ring) system. The system came into operation in December 1982 and was intended to eliminate the previously heavy peak-hour queueing and to improve safety by reducing speeds within the junction. This article describes the results of surveys carried out to assess the traffic performance of the Denham Junction before and after the conversion. The surveys were designed to provide measures of traffic flow patterns, total queueing delay, delay per arriving vehicle and geometric delay for use in the calculation of system benefits. Overall at least 27000 vehicle-minutes of queueing delay were estimated to be saved on an average weekday as a result of the conversion, representing an annual cost saving of 36700 pounds sterling at 1983 prices. There was some indication that accidents after the conversion have been less severe but it was too early to draw firm conclusions since the scheme had been in operation for only just over a year. (TRRL)
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/00410683
-
Corporate Authors:
Printerhall Limited
29 Newmart Street
London W1P 3PE, England -
Authors:
- Wright, P T
- SEMMENS, M C
- Publication Date: 1984-9
Media Info
- Features: Figures; References; Tables;
- Pagination: p. 422-426
-
Serial:
- Traffic Engineering & Control
- Volume: 25
- Issue Number: 9
- Publisher: Hemming Group, Limited
- ISSN: 0041-0683
- Serial URL: http://www.tecmagazine.com/
Subject/Index Terms
- TRT Terms: Before and after studies; Benefit cost analysis; Benefits; Crash rates; Geometric design; Improvements; Intersections; Peak hour traffic; Peak periods; Queuing; Roundabouts; Savings; Traffic circles; Traffic congestion; Traffic crashes; Traffic delays; Traffic flow; Traffic safety; Waiting time
- Uncontrolled Terms: Modifications
- Geographic Terms: United Kingdom
- ITRD Terms: 1612: Accident rate; 9148: Before and after study; 226: Cost benefit analysis; 455: Junction; 2885: Layout; 9048: Modification; 612: Peak hour; 6594: Queue; 438: Roundabout; 671: Traffic flow; 8119: United Kingdom; 9100: Waiting time
- Subject Areas: Highways; Operations and Traffic Management; I73: Traffic Control;
Filing Info
- Accession Number: 00392965
- Record Type: Publication
- Source Agency: Transport Research Laboratory
- Files: ITRD, TRIS
- Created Date: May 31 1985 12:00AM