OHIO TURNPIKE CUYAHOGA RIVER BRIDGE REHABILITATION

Opened to traffic in 1955, the twin two-lane Ohio Turnpike bridges over the Cuyahoga River valley span 2,650 ft. and reach as high as 175 ft. above the valley floor. Each bridge is comprised of four 100-ft-long girder spans and nine 250-ft-long truss spans supported by 12 reinforced concrete piers. As the use of deicing salts increased during the 1960s, so did deterioration of the concrete portions of the bridges. The original design permitted salt water to flow directly onto the surfaces of the piers. By the mid-1970s deterioration of the piers became evident. Efforts to patch the piers and divert drainage were made, but the piers had already become so saturated with chlorides that deterioration continued. In 1980, under contract to the Ohio Turnpike Commission, Howard, Needles, Tammen & Bergendoff inspected the piers and found that about 40 percent of their surface area was spalled or near spalled. Subsequently the firm recommended methods of repair to prevent recurrence of the condition, prepared plans and specifications for shotcreting (selected atlernative), and provided resident construction inspection.

Media Info

  • Media Type: Print
  • Pagination: pp 173-176
  • Monograph Title: Second bridge engineering conference. volumes 1 and 2
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00390863
  • Record Type: Publication
  • ISBN: 03090036593
  • Files: TRIS, TRB
  • Created Date: Dec 30 1984 12:00AM