ABC Deck Panel Testing
Accelerated Bridge Construction techniques have resulted in innovative options that save time and money during the construction of bridges. One such group of techniques that has generated considerable interest is the usage of individual precast concrete decks in place of cast-in-place bridge decks. Utilizing precast concrete decks allow for offsite curing, thus eliminating long delays due to formwork and concrete curing time. These precast concrete decks have inherent joints between the individual panels. These joints are locations for potential leakage, which can lead to corrosion or inadequate long-term performance. Post-tensioning the precast deck panels helps to eliminate leakage; however, conventional longitudinal post-tensioning systems require complete deck replacement in the event of a single faulty deck panel. A proposed post-tensioned, curved strand connection that allows for a single panel replacement was studied for this research. The capacity of the proposed curved strand connection was investigated in order to compare its behavior to other systems that are currently in use.
- Record URL:
-
- Summary URL:
-
Supplemental Notes:
- This document was sponsored by the U.S. Department of Transportation, University Transportation Centers Program.
-
Corporate Authors:
Utah State University, Logan
Department of Civil and Environmental Engineering, 4110 Old Main Hill
Logan, UT United States 84322-4110Center for Advanced Infrastructure and Transportation
Rutgers University
100 Brett Road
Piscataway, NJ United States 08854-8058Utah Department of Transportation
4501 South 2700 West
Salt Lake City, UT United States 84114-8410Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC United States 20590Research and Innovative Technology Administration
1200 New Jersey Avenue, SE
Washington, DC United States 20590 -
Authors:
- Barr, Paul J
- Halling, Marv W
- Wells, Zane
- Publication Date: 2013-9
Language
- English
Media Info
- Media Type: Digital/other
- Edition: Final Report
- Features: Appendices; Figures; Photos; References; Tables;
- Pagination: 82p
Subject/Index Terms
- TRT Terms: Bridge construction; Bridge decks; Bridge members; Joints; Posttensioning; Precast concrete
- Subject Areas: Bridges and other structures; Construction; Design; Highways; I24: Design of Bridges and Retaining Walls;
Filing Info
- Accession Number: 01523311
- Record Type: Publication
- Report/Paper Numbers: CAIT-UTC-003
- Contract Numbers: DTRT12-G-UTC16
- Files: UTC, TRIS, RITA, ATRI, USDOT, STATEDOT
- Created Date: Apr 25 2014 4:12PM