PORT TALBOT HARBOR CONSTRUCTION
The construction of the breakwaters and ore jetty and the execution of the capital dredging of the harbor and its approach channel. The more unusual aspects of construction of the breakwaters are described, including the systems developed for the accurate control of rock placing, together with the plant and methods adopted. The construction of the jetty and plant used is described. The section on the dredging works deals with the implementation of program initially by trailer suction dredgers. Protection of the dredged slopes by fascines is described, and siltation rates are referred to.
-
Corporate Authors:
Institution of Civil Engineers
One Great George Street, Westminster
London, United Kingdom SW1P 3AA -
Authors:
- Ridgway, R J
- Kier, M
- Hill, L P
- Low, D W
- Conference:
- Publication Date: 1970-4
Media Info
- Pagination: p. 593-626
-
Serial:
- Volume: 45
Subject/Index Terms
- TRT Terms: Breakwaters; Construction; Dredging; Harbors; Ore terminals; Ports
- Old TRIS Terms: Port construction
- Subject Areas: Construction; Marine Transportation; Terminals and Facilities;
Filing Info
- Accession Number: 00014871
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: May 7 1973 12:00AM