Secondary compression of silty clay adjacent to the Swan River
The Narrows Interchange is constructed on land reclaimed from the Swan River Estuary in Perth, Western Australia. Preconsolidation techniques were used to eliminate primary consolidation and some secondary compression with subsequent settlement resulting from secondary compression. For projects of this nature, post construction settlement can be estimated from the laboratory determined value of C(sub)alpha, the coefficient of secondary compression. Post construction settlements of the pavements within the interchange have been monitored since the opening in 1973. An analysis of this settlement data has provided field values of C(sub)alpha for comparison with the laboratory determined values.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/08189110
-
Authors:
- Wagner, S
- Cray, A
- Publication Date: 1989-6
Language
- English
Media Info
- Pagination: 17-9
-
Serial:
- AUSTRALIAN GEOMECHANICS
- Issue Number: 17
- Publisher: Institution of Engineers
- ISSN: 0818-9110
Subject/Index Terms
- TRT Terms: Clay; Compression; Embankments; Materials tests; Silts; Soil mechanics
- ATRI Terms: Clay; Compression; Embankment; Material testing; Silt; Soil mechanics
- Subject Areas: Geotechnology;
Filing Info
- Accession Number: 01430308
- Record Type: Publication
- Source Agency: ARRB
- Files: ATRI
- Created Date: Aug 24 2012 3:53PM