CONSTRUCTION OF RUNWAY NO. 1 AT CHARLES DE GAULLE AIRPORT; (1) DESIGN; (2) EXECUTION OF THE WORKS; (3) LABORATORY STUDIES AND CONTROLS

CONSTRUCTION DE LA PISTE NUMERO 1 DE L'AEROPORT CHARLES-DE-GAULLE; 1 - CONCEPTION; 2 - EXECUTION DES TRAVAUX; 3 - ETUDES ET CONTROLES DE LABORATOIRE

RUNWAY NO. 1 WILL HAVE TO SUPPORT ALL AIRCRAFT TRAFFIC AT THE NEW CHARLES-DE-GAULLE AIRPORT UNTIL 1978. THIS SITUATION DICTATED THE DESIGN OF THE RUNWAY. DETAILS ARE GIVEN OF THE GEOMETRIC CHARACTERISTICS OF THE STRUCTURE AND SELECTION OF SURFACING TOGETHER WITH THE DRAINAGE SYSTEM SPECIALLY DESIGNED FOR THIS AIRPORT. A DESCRIPTION IS PRESENTED OF THE EXECUTION OF THE WORKS: EARTHWORKS, STABILIZATION OF SILT WITH LIME, STABILIZATION OF THE ROADBASE WITH GRAVEL, MANUFACTURE AND LAYING OF THE CONCRETE SURFACING, WATERPROOFING OF JOINTS, AND GROOVING. LABORATORY STUDIES AND CONTROL OF SOIL TESTS, STABILIZATION OF SILT WITH QUICK LIME, AND CONSTRUCTION OF THE ROADBASE AND CONCRETE SURFACING ARE DESCRIBED.

  • Availability:
  • Authors:
    • GALLOPIN, M
    • GOUDENECHE, R
    • LORIN, R
  • Publication Date: 1974-3

Language

  • French

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01310629
  • Record Type: Publication
  • Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
  • Files: ITRD
  • Created Date: Nov 21 2010 1:09PM