<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Transport Research International Documentation (TRID)</title>
    <link>https://trid.trb.org/</link>
    <atom:link href="https://trid.trb.org/common/TRIS Suite/feeds/RSS.aspx?s=PHNlYXJjaD48cGFyYW1zPjxwYXJhbSBuYW1lPSJkYXRlaW4iIHZhbHVlPSJhbGwiIC8%2BPHBhcmFtIG5hbWU9InN1YmplY3Rsb2dpYyIgdmFsdWU9Im9yIiAvPjxwYXJhbSBuYW1lPSJ0ZXJtc2xvZ2ljIiB2YWx1ZT0ib3IiIC8%2BPHBhcmFtIG5hbWU9ImxvY2F0aW9uIiB2YWx1ZT0iMCIgLz48L3BhcmFtcz48ZmlsdGVycz48ZmlsdGVyIGZpZWxkPSJpbmRleHRlcm1zIiB2YWx1ZT0iJnF1b3Q7VHJhaW4gbW92ZW1lbnRzJnF1b3Q7IiBvcmlnaW5hbF92YWx1ZT0iJnF1b3Q7VHJhaW4gbW92ZW1lbnRzJnF1b3Q7IiAvPjwvZmlsdGVycz48cmFuZ2VzIC8%2BPHNvcnRzPjxzb3J0IGZpZWxkPSJwdWJsaXNoZWQiIG9yZGVyPSJkZXNjIiAvPjwvc29ydHM%2BPHBlcnNpc3RzPjxwZXJzaXN0IG5hbWU9InJhbmdldHlwZSIgdmFsdWU9InB1Ymxpc2hlZGRhdGUiIC8%2BPC9wZXJzaXN0cz48L3NlYXJjaD4%3D" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Transport Research International Documentation (TRID)</title>
      <url>https://trid.trb.org/Images/PageHeader-wTitle.jpg</url>
      <link>https://trid.trb.org/</link>
    </image>
    <item>
      <title>ATLAS AUTOMATIC TRAIN CONTROL DEMONSTRATION AT TORONTO TRANSIT COMMISSION</title>
      <link>https://trid.trb.org/View/486783</link>
      <description><![CDATA[A highly successful demonstration of the SASIB RAILWAY GRS ATLAS communications based Automatic Train Control (ATC) System was provided for the Toronto transit Commission.  The time granted for the demonstration was six weeks, beginning on 1/29/96, however the demonstration went so well that the parties agreed to conclude one week early.  The demonstration area began in the pocket track south of Osgoode Street and continued northbound on Track 1, through Osgoode, St. Patrick, and Queen's Park Stations.  The end was just north of Queen's Park Station for a total run of about 4600 feet.  For train control purposes, the area was divided into two control sectors (6 and 7).  Sector 6 started in the Osgoode pocket track and extended (on both track 1 and track 2) to the south end of St. Patrick Station.  Sector 7 started at the south end of the St. Patrick platform and extended (on both track 1 and track 2) to the north end of the Queen's park station.  After each northbound run, the train proceeded under normal traffic control into the pocket track just north of St. Clair West Station.  After mainline revenue traffic was cleared, the train entered the southbound main track (Track 2) and proceeded under normal traffic control to Queen's Park Station.  The secondary demonstration run started when the train was just north of Queen's Park Station and continued southbound through Queen's Park, St. Patrick, and Osgoode Stations.  The train re-entered the Osgoode pocket track and continued until the tail end of the train cleared the exit point.  All train movement was coordinated with signal operators per existing signal system movement authority.  Depending upon the nature of the demonstration, the train sometimes followed a revenue train (as closely as the existing signal system allowed) in order to demonstrate successful operation even with RF blockage created by the revenue train.]]></description>
      <pubDate>Fri, 12 Jun 1998 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/486783</guid>
    </item>
    <item>
      <title>SEPTA'S NEW RAILROAD DIVISION CONTROL CENTER: AN OVERVIEW OF A MAJOR MODERNIZATION PROJECT</title>
      <link>https://trid.trb.org/View/485877</link>
      <description><![CDATA[Southeastern Pennsylvania Transportation Authority (SEPTA) commuter rail system forms a vital link between the City of Philadelphia and the five counties that make up the suburban Philadelphia area.  This rail service supports the daily travel plans of more than 80,000 people and serves over 160 passenger stations.  The Railroad Division operates and maintains passenger services previously provided by the old Reading and Pennsylvania passenger services which are now joined together by a mi-city tunnel.  It includes over 135 route miles of AC electrified territory and portions of Amtrak's Northeast Corridor and Harrisburg Main Line service.  Today, control of railroads remains largely decentralized with seven towers controlling train movements.  A central facility, known as the Railroad Operations Control Center, monitors train operations for the purpose of operation decision making, train movement authorization, incident management, and train sheet preparation. But this center lacks the real-time data from wayside equipment that is essential to a fully centralized operation.  In 1994, SEPTA engaged Macro Corporation to work with SEPTA's engineering staff to introduce the benefits of centralized operation of its Railroad Division.  The primary objectives of the resulting engineering design study were to:  (1) evaluate alternative sites for a new Railroad Division Control Center and prepare preliminary architectural designs for the most favorable sites; (2) develop the system configuration and functional requirements for a new Centralized Traffic Control (CTC) system; (3) investigate how best to upgrade field sites in preparation for centralized operations; and (4) design improved control center communications facilities.  To avoid premature obsolescence of systems and facilities, the study also looked forward 15-20 years to consider expansion of the rail territory.  This paper presents an overview of the design decisions that were key elements of SEPTA's modernization project.  Control center site selection, ergonomic design, current and future staffing plans, and the functionality of the CTC system are presented.]]></description>
      <pubDate>Tue, 12 May 1998 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/485877</guid>
    </item>
    <item>
      <title>"PRELOAD" ENHANCES END-OF-CAR CUSHIONING</title>
      <link>https://trid.trb.org/View/425457</link>
      <description><![CDATA[Recent advances in cushioning unit technology have resulted in end-of-car (EOC) cushioning devices with a preload feature that controls train action forces and accelerations. These new devices have the potential to reduce damage to lading, reduce peak coupler forces, and reduce wear and tear on draft system components.]]></description>
      <pubDate>Fri, 26 May 1995 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/425457</guid>
    </item>
    <item>
      <title>SIMULATING LONGITUDINAL TRAIN MOVEMENT WITH COMPUTER</title>
      <link>https://trid.trb.org/View/421834</link>
      <description><![CDATA[Track-train dynamics, train movements, train movement states, and mathematical models for simulating longitudinal train movements are described in the report.  Simulating systems are set up and programmed on a computer.  The article also presents the architecture, functions, and applications of a simulation system (LQD).  The system can be used to determine coupling forces and energy consumption, to investigate accidents, and to check track layout.  Slack action impact in a train and relevant programming problems are discussed in the paper.  With the help of LQD, we have studied the relationship between the maximum coupling forces and profile parameters, especially with the difference in gradients, and put forward a new theory about difference in gradients.]]></description>
      <pubDate>Thu, 25 May 1995 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/421834</guid>
    </item>
    <item>
      <title>A SYSTEM FOR TRAIN MOVEMENT COMMAND AND CONTROL</title>
      <link>https://trid.trb.org/View/385325</link>
      <description><![CDATA[In a move to increase line capacity and reduce operating costs, SNCF has launched Astree, a vast command, control and communications system for monitoring rail movements. It makes extensive use of the latest computer and telecommunications technology to offer a host of novel features.]]></description>
      <pubDate>Thu, 17 Feb 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/385325</guid>
    </item>
    <item>
      <title>ATCS ADVANCES IN CANADA</title>
      <link>https://trid.trb.org/View/294227</link>
      <description><![CDATA[The British Columbia line has been chosen as the first line to be installed with the second level of advanced train control systems (ATCS), Level 20.  This level consists of a two-way communications link between the dispatchers and train crew as well as the installation of computer equipment on board the locomotive and at trackside.  This will facilitate on-board display of track information and train movement authorities, and permit the on-board operation of remote controlled switches.]]></description>
      <pubDate>Fri, 31 Mar 1989 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/294227</guid>
    </item>
    <item>
      <title>MONITORING TRAIN RUNNING BY COMPUTER (RZUE)</title>
      <link>https://trid.trb.org/View/167784</link>
      <description><![CDATA[The German Federal Railway is planning to equip its main lines and certain secondary lines carrying long distance traffic with a computerised train running monitoring system. Microcomputers installed in signal boxes will monitor the trains and transmit the results automatically to a central computer situated in regional headquarters. A visual display screen will provide the traffic controller with information on the time and route of the train.]]></description>
      <pubDate>Thu, 09 Jul 1981 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/167784</guid>
    </item>
    <item>
      <title>COMPUTER-SUPPORTED TRAIN-RUNNING SUPERVISION</title>
      <link>https://trid.trb.org/View/166826</link>
      <description><![CDATA[In computer-supported train-running supervision, the supervisory function is exercised with the aid of a computer system, with decentral microcomputers at the stations following the train movements.  These microcomputers are linked with each other and with the control centre.  There a central process computer system evaluates the results of the tracking of train movements and represents these in the form of time-distance lines. These together with the automatically determined schedule deviations provide the basic information for the control-centre personnel, who then transmit their instructions by telephone or by train radio.  All operational sequences are tape-recorded.]]></description>
      <pubDate>Fri, 12 Jun 1981 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/166826</guid>
    </item>
    <item>
      <title>PARIS-EST TRAIN MOVEMENT MONITORING SYSTEM</title>
      <link>https://trid.trb.org/View/160622</link>
      <description><![CDATA[This train monitoring system covers the inner suburban area, and enables train movements to be identified and located in real time in an area with intense traffic, where any disturbance in operation causes considerable inconvenience to the public.  After describing the general arrangements of the system, its operation is studied in detail.]]></description>
      <pubDate>Tue, 30 Dec 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/160622</guid>
    </item>
    <item>
      <title>MONITORING TRAIN MOVEMENTS</title>
      <link>https://trid.trb.org/View/160121</link>
      <description><![CDATA[So that trains can be run in a satisfactory manner, it is necessary to have at various operating levels information that must be all the more adequate, accurate and quickly available as the number and speed of trains increase. The relatively new tool that can meet these requirements is known as the train movement monitoring system.  The systems installed in Versailles-Chantiers box and on Paris-North suburban lines have been described in previous articles.  This article synthesizes the definition, the purpose and the general principles of monitoring train movements.  It will be followed by other articles describing the systems installed on Paris-East and Paris-North suburban lines as well as on the Left Bank link between Paris-Austerlitz and Versailles-Chantiers.]]></description>
      <pubDate>Sat, 29 Nov 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/160121</guid>
    </item>
    <item>
      <title>DISPATCHING BY COMPUTER: WHY? HOW MUCH? HOW SOON?</title>
      <link>https://trid.trb.org/View/85294</link>
      <description><![CDATA[Centralization and computerization of train dispatching have reached various levels on different railroads. Minicomputers and microprocessors are adding new dimensions to dispatching.  Examples of levels of sophistication on Chessie System, Louisville & Nashville, Frisco and British Columbia Railway are described, along with general observations on automation of train movements and planning.]]></description>
      <pubDate>Fri, 11 May 1979 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/85294</guid>
    </item>
    <item>
      <title>TRAIN REGULATION AND ROUTE-SETTING WITHIN AN INTEGRATED DATA PROCESSING SYSTEM</title>
      <link>https://trid.trb.org/View/66005</link>
      <description><![CDATA[German Federal Railway's Board of Management has approved the first stage of a system-wide computer project to handle all commercial transactions, record and supervise rolling stock movements, and continuously monitor train running throughout the system.  Costing DM600 million, this Integrated Transport Control system is based on a hierarchy of computers and installation is now in full swing.  Development and design work is centered on the "cybernetic island" near Hannover which is now reaching the end of its service life.  In setting up the "cybernetic island" the objective was to develop, test and evaluate control by computers of all operating and decision-making transport processes from acceptance of a consignment to its delivery to the consignee.  This objective has been completely fulfilled.]]></description>
      <pubDate>Tue, 01 Feb 1977 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/66005</guid>
    </item>
    <item>
      <title>AUTOMATIC CALCULATION OF A TRAIN FORMING SCHEDULE FOR EACH OF THE RUSSIAN RAILWAYS' NETWORKS</title>
      <link>https://trid.trb.org/View/65679</link>
      <description><![CDATA[The article describes a method for producing this calculation, as developed by the Railway Transport Research Institute of the Ministry of Communications.  It also explains the calculation diagram for the optimum train forming schedule by network, which provides for improvement of the wagon flow programming system.]]></description>
      <pubDate>Wed, 15 Dec 1976 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/65679</guid>
    </item>
    <item>
      <title>INTEGRATED TRANSPORT CONTROL ON RAILWAYS</title>
      <link>https://trid.trb.org/View/34005</link>
      <description><![CDATA[Through transport entails: consignment with appended tariff, loading, forwarding, unloading and delivery.  However, according to the author, it was established that 93% of the data required for computing the consignment note was also required for transport control.  This discovery led to the idea of integrated transport control.  The author presents its economic advantages, and shows the organization of the "Hanover Cybernetic Island".  He describes: (1) the data capture which automates the task of the Commercial Departments; (2) the operational control of a marshalling yard, which is facilitated, anticipated and allows for forecastings on train movements; and (3) the interface between marshalling yard control and running on line traffic.  One figure presents the data processing layout of the Island.  To conclude, the author presents some ideas on future developments of the system and the DB's future prospects.]]></description>
      <pubDate>Sat, 18 Oct 1975 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/34005</guid>
    </item>
    <item>
      <title>AUTOMATED MANAGEMENT OF RAILWAY ROLLING STOCK</title>
      <link>https://trid.trb.org/View/34003</link>
      <description><![CDATA[Organizing a daily traffic of 2,500 wagons and 72 locomotives scattered over 700 tracks forming a private network of 186 kms, is the task which the Traction Department of the Cockerill works at Liege was to face every day.  The author explains how automatic management of this Traction Department has been facilitated: the accurate and rapid location of rolling economical vehicle turnaround, more rational rolling-stock and track maintenance, correct inputing of transport costs, and a significant reduction in paperwork.]]></description>