<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Transport Research International Documentation (TRID)</title>
    <link>https://trid.trb.org/</link>
    <atom:link href="https://trid.trb.org/common/TRIS Suite/feeds/RSS.aspx?s=PHNlYXJjaD48cGFyYW1zPjxwYXJhbSBuYW1lPSJkYXRlaW4iIHZhbHVlPSJhbGwiIC8%2BPHBhcmFtIG5hbWU9InN1YmplY3Rsb2dpYyIgdmFsdWU9Im9yIiAvPjxwYXJhbSBuYW1lPSJ0ZXJtc2xvZ2ljIiB2YWx1ZT0ib3IiIC8%2BPHBhcmFtIG5hbWU9ImxvY2F0aW9uIiB2YWx1ZT0iMCIgLz48L3BhcmFtcz48ZmlsdGVycz48ZmlsdGVyIGZpZWxkPSJpbmRleHRlcm1zIiB2YWx1ZT0iJnF1b3Q7V2luZyB3YWxscyZxdW90OyIgb3JpZ2luYWxfdmFsdWU9IiZxdW90O1dpbmcgd2FsbHMmcXVvdDsiIC8%2BPC9maWx0ZXJzPjxyYW5nZXMgLz48c29ydHM%2BPHNvcnQgZmllbGQ9InB1Ymxpc2hlZCIgb3JkZXI9ImRlc2MiIC8%2BPC9zb3J0cz48cGVyc2lzdHM%2BPHBlcnNpc3QgbmFtZT0icmFuZ2V0eXBlIiB2YWx1ZT0icHVibGlzaGVkZGF0ZSIgLz48L3BlcnNpc3RzPjwvc2VhcmNoPg%3D%3D" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Transport Research International Documentation (TRID)</title>
      <url>https://trid.trb.org/Images/PageHeader-wTitle.jpg</url>
      <link>https://trid.trb.org/</link>
    </image>
    <item>
      <title>LOCAL SCOUR AT BRIDGE ABUTMENTS</title>
      <link>https://trid.trb.org/View/269958</link>
      <description><![CDATA[This report aims to correlate the effect of flow depth on the maximum scour depth at bridge abutments.  The study was primarily experimental, the work having been carried out under clear-water conditions in steady uniform flow.  The bed sediment used was non-cohesive.  Several different shapes of abutment were investigated, including wing-wall, spill-through, semi-circular-end and triangular-shaped types. (TRRL)]]></description>
      <pubDate>Fri, 27 Aug 2004 21:57:18 GMT</pubDate>
      <guid>https://trid.trb.org/View/269958</guid>
    </item>
    <item>
      <title>EVALUATION OF WALL STRUCTURES IN KENTUCKY</title>
      <link>https://trid.trb.org/View/473307</link>
      <description><![CDATA[Approximately 209 retaining wall structures were visually evaluated under this study for long-term performance.  The inspection included concrete crib, single-barrel and double-barrel culvert wing walls, metal bin, gabion, rigid concrete, Keystone block, tiedback, mechanically stabilized earth (MSE), TechWall, and sound walls.  Significant structural distress was observed in several of the wall systems.  This report discusses the performance of each wall system and makes recommendations on the future use of these systems.]]></description>
      <pubDate>Mon, 30 Mar 1998 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/473307</guid>
    </item>
    <item>
      <title>AESTHETIC TOUCHES ADORN CITY BRIDGE SUBSTRUCTURES</title>
      <link>https://trid.trb.org/View/358803</link>
      <description><![CDATA[The article describes how engineers added architectural embellishments to bridge abutments and understructures to conform to stringent guidelines provided by an environmental impact study which determined the appearance of an expressway through an historic neighborhood in Oklahoma City.  The design approach included bridge piers, vertical abutments, wing walls and noise barriers to be clad in a cast-in-place fractured fin-ribbed finish that would minimize the massive expanse of the structures.  Abutments and wing walls appear as a series of stepped planters, with the stepped design providing a natural transition from the earth bank to a series of right-angle planters.  The planters terminate in a vertical wall which is also the bridge seat.  Details of the aesthetic treatments are briefly described.]]></description>
      <pubDate>Sat, 31 Aug 1991 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/358803</guid>
    </item>
    <item>
      <title>RENOVATION OF THE THIRD AVENUE BRIDGE IN MINNEAPOLIS</title>
      <link>https://trid.trb.org/View/210140</link>
      <description><![CDATA[The Third Avenue Bridge has the most dramatic setting and sophisticated design of all Minneapolis spans over the Mississippi.  Built in 1918 this reinforced concrete structure had deteriorated to the point where it needed major renovation or replacement.  Howard, Needles, Tammen, & Bergendoff, Architects, Engineers, and Planners, did a detailed inspection and evaluation of the bridge.  They recommended replacement of the entire deck including roadway, barriers, sidewalks, railings, and lights; the spandrel caps and the upper portions of the drel caps and the upper portions of the spandrels; the entire approach spans, including the bents; and even the abutments and wing walls.  Special challenges for the designers included estimating quantities and defining how much of the structure was to be replaced, improving sight distances, improving drainage by inducing a slight grade, protecting the top reinforcement, adding a new safety-shaped barrier between the roadway and the walkways, and developing special provisions for the use of shotcrete.  In addition, the designers worked to preserve the historic and aesthetic values of the bridge.  It became clear that a normal construction pace would not be acceptable.  The bridge was too important to the traffic system to be closed any longer than really necessary.  An incentive clause was added to the contract.  Construction brought additional problems.  The condition of the bridge was worse than expected.  Decisions about the extent of the repairs had to be made daily.  Nevertheless, the project was a success. The Third Avenue Bridge was reopened to traffic almost a year ahead of schedule and has been saved for decades to come.]]></description>
      <pubDate>Sun, 30 Dec 1984 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/210140</guid>
    </item>
    <item>
      <title>M25 FEATURE: NEW HAW VIADUCT IN MULTI-CELL BOX</title>
      <link>https://trid.trb.org/View/204552</link>
      <description><![CDATA[The structure carries the newly opened Chertsey-Wisley section of the motorway, on a curve and a height of about 12 metres, over a navigation canal and the main-line railway. The location of viaduct supports and the form of deck structure was greatly influenced by the site topography and underground services.  Large diameter bored piles because lack of space prevented the use of spread footings.  A multi-cell, in situ concrete box deck of constant depth was chosen for the 287 M long curved deck of differing span lengths varying from 27 M to 42 M. Prefabricated elements were used to span the very busy railway line and special measures were needed to keep the canal open throughout the works.  A burried abutment at the north end provides a suitable transition from the high embankment; a cantilevered wall with splayed wing walls form the end support next to the railway line. Intermediate supports comprise pairs of rectangular plate piers, one per spire, using tapered facet downstands at the deck soffit.  (TRRL)]]></description>
      <pubDate>Thu, 30 Aug 1984 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/204552</guid>
    </item>
  </channel>
</rss>