<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Transport Research International Documentation (TRID)</title>
    <link>https://trid.trb.org/</link>
    <atom:link href="https://trid.trb.org/common/TRIS Suite/feeds/RSS.aspx?s=PHNlYXJjaD48cGFyYW1zPjxwYXJhbSBuYW1lPSJkYXRlaW4iIHZhbHVlPSJhbGwiIC8%2BPHBhcmFtIG5hbWU9InN1YmplY3Rsb2dpYyIgdmFsdWU9Im9yIiAvPjxwYXJhbSBuYW1lPSJ0ZXJtc2xvZ2ljIiB2YWx1ZT0ib3IiIC8%2BPHBhcmFtIG5hbWU9ImxvY2F0aW9uIiB2YWx1ZT0iMCIgLz48L3BhcmFtcz48ZmlsdGVycz48ZmlsdGVyIGZpZWxkPSJpbmRleHRlcm1zIiB2YWx1ZT0iJnF1b3Q7V2VsZGluZyBlcXVpcG1lbnQmcXVvdDsiIG9yaWdpbmFsX3ZhbHVlPSImcXVvdDtXZWxkaW5nIGVxdWlwbWVudCZxdW90OyIgLz48L2ZpbHRlcnM%2BPHJhbmdlcyAvPjxzb3J0cz48c29ydCBmaWVsZD0icHVibGlzaGVkIiBvcmRlcj0iZGVzYyIgLz48L3NvcnRzPjxwZXJzaXN0cz48cGVyc2lzdCBuYW1lPSJyYW5nZXR5cGUiIHZhbHVlPSJwdWJsaXNoZWRkYXRlIiAvPjwvcGVyc2lzdHM%2BPC9zZWFyY2g%2B" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Transport Research International Documentation (TRID)</title>
      <url>https://trid.trb.org/Images/PageHeader-wTitle.jpg</url>
      <link>https://trid.trb.org/</link>
    </image>
    <item>
      <title>Tennessee time machine : taking care of business, one flight at a time</title>
      <link>https://trid.trb.org/View/1108143</link>
      <description><![CDATA[]]></description>
      <pubDate>Wed, 03 Aug 2011 13:29:57 GMT</pubDate>
      <guid>https://trid.trb.org/View/1108143</guid>
    </item>
    <item>
      <title>ELECTROMAGNETIC EMISSION FROM DC AND AC TIG WELDING SYSTEMS</title>
      <link>https://trid.trb.org/View/455724</link>
      <description><![CDATA[The author details the legislation inherent in the new EMC Directive due to become law on 1 January 1996.  In addition, the emissions generated by welding systems, particularly ac and dc TIG welding equipment are discussed and the results of tests analyzed.]]></description>
      <pubDate>Mon, 04 Mar 1996 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/455724</guid>
    </item>
    <item>
      <title>ROBOTICS ALLOWS ON-SITE WELDING OF RAIL</title>
      <link>https://trid.trb.org/View/378156</link>
      <description><![CDATA[Robotic arc welding using gas-shielded twin wires offers better quality than alumino-thermic welding at a lower cost than flash-butt techniques.]]></description>
      <pubDate>Wed, 07 Jul 1993 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/378156</guid>
    </item>
    <item>
      <title>PROCEEDINGS OF THE 100TH ANNUAL CONFERENCE OF THE ROADMASTERS' AND MAINTENANCE OF WAY ASSOCIATION OF AMERICA, CHICAGO, ILLINOIS, SEPTEMBER 19-21, 1988</title>
      <link>https://trid.trb.org/View/297466</link>
      <description><![CDATA[These proceedings contain the following addresses and committee reports:  Address, H.J. Bruce; Development of High Speed Mitre Rails for Amtrak's Moveable Spans, A.E. Shaw; Clearance Measurements, L. Lundberg; Tunnel Enlargements on UP, J.R. Beran; Are Changes in the Rail Labor/Management Relations Keeping Pace with Changes in the Rail/Truck Competitive Environment?, B.J. Allen; Committee Report - Tie Disposal, R.D. Campbell; Panel Discussion - Track Buckling; Committee Report - Organization and Support for Undercutting, Plow and Switch Undercutting Operations, V.C. Stensrud; Address, J.A. Zito; Panel Discussion - Spent Cross Ties Disposition; Maintenance and Safe Use of Gas Welding Equipment, B.F. Jezek; Panel Discussion - CWR Rehabilitation; Committee Report - Frog Casting, N.H. Clark; Railway Track Geotextiles, G.P. Raymond; Committee Report - Rail Wear Inspection Procedures, J.W. Boyd; Committee Report - Effective Use of Maintenance Gangs, R.G. Bacon; Panel Discussion - Rail Lubrication; Film - Construction of TGV Atlantique by SNCF; Proviso Diesel Shop Addition, P.H. Saletnik; Roller Compacted Concrete, B.T. Bock; Vegetation Management, T.F. Sheahan; and Peacekeeper Rail Garrison Project, K. Creighton.]]></description>
      <pubDate>Mon, 31 Jul 1989 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/297466</guid>
    </item>
    <item>
      <title>WELDING OF JOINTLESS RAIL</title>
      <link>https://trid.trb.org/View/167097</link>
      <description><![CDATA[This article discusses the metallurgy of rails joined by arc welding and the equipment used for such welding, as well as the characteristics of and methods for making thermit welds. The tests are described for determining the quality of welded rail joints.]]></description>
      <pubDate>Fri, 12 Jun 1981 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/167097</guid>
    </item>
    <item>
      <title>BOMBARDIER MAKES TOMMORROW'S TRAIN TODAY</title>
      <link>https://trid.trb.org/View/161354</link>
      <description><![CDATA[Bombardier Limited, Montreal produces locomotives, passenger railcars, and diesel-electric power units.  The article describes manual, semiautomatic, and automatic welding to join steel and aluminum alloys.]]></description>
      <pubDate>Fri, 06 Feb 1981 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/161354</guid>
    </item>
    <item>
      <title>WORN RAIL VEHICLE WHEEL FLANGES MUST BE WELDED BY RESURFACING IF THIS IS A VIABLE PROPOSITION</title>
      <link>https://trid.trb.org/View/153914</link>
      <description><![CDATA[If flanges are resurface-welded, considerable labor otherwise required for swarf removal is saved.  A welding process is described whereby a pair of wheels is welded simultaneously under protection with CO2 gas, and a cold wire is used next to the conductor wire.  There is no dangerous maximum hardness in the heat influence area even though the sensitive area of the tires is not preheated.]]></description>
      <pubDate>Tue, 22 Jul 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/153914</guid>
    </item>
    <item>
      <title>PLASMA FUSION CUTTING AND GAS-SHIELDED ARC WELDING WITH PULSATING DIRECT CURRENT FOR REPAIR OF ALUMINUM RAIL VEHICLES</title>
      <link>https://trid.trb.org/View/147233</link>
      <description><![CDATA[No Abstract.]]></description>
      <pubDate>Mon, 11 Feb 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/147233</guid>
    </item>
    <item>
      <title>THE K 355 PT MOBILE FLASH-BUTT WELDING APPARATUS IN USE ON AUSTRIAN FEDERAL RAILWAYS</title>
      <link>https://trid.trb.org/View/85255</link>
      <description><![CDATA[Description of the K 355 PT mobile flash-butt welding equipment approved by the University of Vienna's technical testing and research laboratory.  The OBB's use of this machine has required development of new methods and other equipment.  The machine's performance shows that it can be profitably used in the future in the construction of welded track.]]></description>
      <pubDate>Wed, 25 Apr 1979 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/85255</guid>
    </item>
    <item>
      <title>WELDING ASPECTS OF THE SISHEN-SALDANHA RAILWAY LINE</title>
      <link>https://trid.trb.org/View/79494</link>
      <description><![CDATA[This paper gives a description of how the rails were welded for the track and a technical description of the reasons for certain precautionary measures which were required to ensure that adequate welding quality was achieved.  The rails for the Sishen-Saldanha Project were produced by three German Steelworks according to the UIC 60 specification and have a mass of 60 jg/m.  The UIC 60 rails of 25 m length were flash butt-welded in a stationary welding depot at the Saldanha marshalling yard to form so-called long welded rails of 300 m.  These long lengths were then loaded onto a set of flat railcars and transported to the railhead where they were off-loaded, placed in position and thermit welded to form the fully welded track.  In addition, friction welding was used in the attachment of earth return connections to the rails.]]></description>
      <pubDate>Tue, 31 Oct 1978 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/79494</guid>
    </item>
    <item>
      <title>CWR FROM LONG RAILS AT NEWEST BUTT-WELDING PLANT</title>
      <link>https://trid.trb.org/View/79245</link>
      <description><![CDATA[Burlington Northern has built a rail-welding facility adjacent to the steel plant at Pueblo, Colo., which can produce rails in lengths up to 82 ft (25 meters).  The BN facility assembles these long rails into strings up to 1540 ft in length.  Provision is also made for handling and welding rails in widely varying lengths (from 25 to 82 ft); there are five production stations centered around the electric flash welding machine.]]></description>
      <pubDate>Wed, 27 Sep 1978 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/79245</guid>
    </item>
    <item>
      <title>ECONOMICS OF PRODUCING WELDED RAIL BY IN-TRACK WELDING</title>
      <link>https://trid.trb.org/View/73424</link>
      <description><![CDATA[The experience with in-track welding of rail by the flash-butt welding process; by gas welding and by Thermit process are discussed.  Almost no experience in the U.S. was reported for gas welding but the other two methods have been used extensively and operational and economic analyses have been possible.]]></description>
      <pubDate>Wed, 14 Jun 1978 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/73424</guid>
    </item>
    <item>
      <title>INTENSIFICATION OF HEATING THE RAILS IN PULSED FLASH BUTT RESISTANCE WELDING</title>
      <link>https://trid.trb.org/View/60539</link>
      <description><![CDATA[It is shown that application of a pulse controller permits one to shorten the time welding, to intensify heating, and stabilize the quality of welded joints.]]></description>
      <pubDate>Fri, 13 Jan 1978 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/60539</guid>
    </item>
    <item>
      <title>FLASH-BUTT WELDING USING MOBILE ON-TRACK MACHINES</title>
      <link>https://trid.trb.org/View/60265</link>
      <description><![CDATA[Flash-butt welding of rails in the field is somewhat different from welding in a plant where there is no restriction on weight or longitudinal movement of one rail. Using a machine developed in the Soviet Union, a mobile welding has made up to ten welds per hour in Italy and Austria.  Careful control of the process is necessary.]]></description>
      <pubDate>Tue, 27 Dec 1977 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/60265</guid>
    </item>
    <item>
      <title>TEST BENCH FOR CONTACTLESS ULTRANSONIC QUALITY CONTROL OF RAILS</title>
      <link>https://trid.trb.org/View/36707</link>
      <description><![CDATA[Practical achievement of a contactless means of rail inspection is possible only with the mechanized or automatic process of control.  For this purpose a test bench has been worked out in the scientific Research Institute of Bridges of the Leningrad Lenin Order Institute of Railroad Transportation Engineers named after Academician V.N. Obraztsov.  The bench contains two fundamental functional assemblies: a mechanical portion (mechanism for extension and fixation of the rail, and a magnetic biasing system with a mechanism for fixing the electromagnetic- acoustic inspection system) and an assembly stand with electronic apparatus. The location of the entire equipment complex is envisaged to be in the same place where operations are carried out.  This allows control before the beginning of the welding, and rejection of rails with defects in their basic metal, and secondly, utilization of the mechanism for extension and firm fixation of the rails on the table of a planing machine.  The figures include a block plan of the electronic portion of the bench, and a kinematic plan of the bench.]]></description>
      <pubDate>Thu, 01 Dec 1977 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/36707</guid>
    </item>
  </channel>
</rss>