<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Transport Research International Documentation (TRID)</title>
    <link>https://trid.trb.org/</link>
    <atom:link href="https://trid.trb.org/common/TRIS Suite/feeds/RSS.aspx?s=PHNlYXJjaD48cGFyYW1zPjxwYXJhbSBuYW1lPSJkYXRlaW4iIHZhbHVlPSJhbGwiIC8%2BPHBhcmFtIG5hbWU9InN1YmplY3Rsb2dpYyIgdmFsdWU9Im9yIiAvPjxwYXJhbSBuYW1lPSJ0ZXJtc2xvZ2ljIiB2YWx1ZT0ib3IiIC8%2BPHBhcmFtIG5hbWU9ImxvY2F0aW9uIiB2YWx1ZT0iMCIgLz48L3BhcmFtcz48ZmlsdGVycz48ZmlsdGVyIGZpZWxkPSJpbmRleHRlcm1zIiB2YWx1ZT0iJnF1b3Q7V2FzdGUgaGVhdCBib2lsZXJzJnF1b3Q7IiBvcmlnaW5hbF92YWx1ZT0iJnF1b3Q7V2FzdGUgaGVhdCBib2lsZXJzJnF1b3Q7IiAvPjwvZmlsdGVycz48cmFuZ2VzIC8%2BPHNvcnRzPjxzb3J0IGZpZWxkPSJwdWJsaXNoZWQiIG9yZGVyPSJkZXNjIiAvPjwvc29ydHM%2BPHBlcnNpc3RzPjxwZXJzaXN0IG5hbWU9InJhbmdldHlwZSIgdmFsdWU9InB1Ymxpc2hlZGRhdGUiIC8%2BPC9wZXJzaXN0cz48L3NlYXJjaD4%3D" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Transport Research International Documentation (TRID)</title>
      <url>https://trid.trb.org/Images/PageHeader-wTitle.jpg</url>
      <link>https://trid.trb.org/</link>
    </image>
    <item>
      <title>INCREASING THE MOBILITY OF GAS TURBINE POWERED U.S. NAVY SURFACE SHIPS</title>
      <link>https://trid.trb.org/View/391183</link>
      <description><![CDATA[Fuel consumption, weight, and size factors have a major effect on final ship design.  In efforts to improve fuel consumption, three major thrusts are now in process: fuel consumption improvement by basic gas turbine engine component enhancements; addition of a RACER/COGAS system; and more recently, by the possible addition of recuperator to improve fuel efficiency. This paper describes current programs in these three categories.  The major features of each system are described.  Performance comparisons, as appropriate, are presented.  (COGAS: Combined Gas and Steam).]]></description>
      <pubDate>Thu, 21 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/391183</guid>
    </item>
    <item>
      <title>A STRAIGHT-THROUGH WASTE-HEAT BOILER FOR A COGAS PLANT</title>
      <link>https://trid.trb.org/View/391275</link>
      <description><![CDATA[ not available]]></description>
      <pubDate>Thu, 21 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/391275</guid>
    </item>
    <item>
      <title>A STUDY OF THE HEAT CONDUCTIVITY OF BUILDUP ON THE LOW TEMPERATURE SURFACES OF RECOVERY BOILERS</title>
      <link>https://trid.trb.org/View/397550</link>
      <description><![CDATA[A study is presented of the impact upon the heat conductivity of buildup on low-temperature waste-heat boiler surfaces of such parameters as porosity, temperature, and moistening components (namely, water and sulfuric acid) in varying concentrations. The results can serve as a reference for determining the thermal resistance of buildup in evaluating heating surface efficiency.]]></description>
      <pubDate>Thu, 21 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/397550</guid>
    </item>
    <item>
      <title>SAFETY AND CLEANING CONSIDERATIONS FOR EXHAUST HEAT RECOVERY BOILERS</title>
      <link>https://trid.trb.org/View/400551</link>
      <description><![CDATA[Exhaust heat recovery boilers are frequently used in ship power plants in conjunction with diesel engines. The use of heavy fuel makes it important that such a boiler have a heat exchange surface that can be cleaned easily and effectively and that will efficiently convert exhaust heat to steam or hot water. A bare tube spiral design heat exchange surface produced by Clayton Industries is described as meeting these requirements. The bare tube design is a feature that a survey of shipowners and builders showed was preferred to offset the possibility of fires and to facilitate cleaning. Since one-eighth inch of accumulated soot reduces heat transfer to the same extent that five-eighths inch of asbestos would, this ease of cleaning is important.]]></description>
      <pubDate>Thu, 21 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/400551</guid>
    </item>
    <item>
      <title>LOW-TEMPERATURE CORROSION OF THE WASTE RECOVERY HEATING SURFACES OF A MARINE AUXILIARY BOILER</title>
      <link>https://trid.trb.org/View/400596</link>
      <description><![CDATA[An investigation into the composition of fuel combustion products, low-temperature corrosion and deposit formation in marine auxiliary boilers is described. It is shown that the boilers can make more complete use of the heat from escaping gases if wall temperature is reduced.]]></description>
      <pubDate>Thu, 21 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/400596</guid>
    </item>
    <item>
      <title>RESULTS OF THERMOCHEMICAL INVESTIGATION OF THE WASTE-HEAT RECOVERY LOOP IN THE MOTORSHIP KHARITON GREKU</title>
      <link>https://trid.trb.org/View/400768</link>
      <description><![CDATA[Thermochemical investigations of the waste heat recovery loop in a 52,700 dwt ore carrier were performed in running modes during a 100-day round-trip voyage. The plan for service trials called for a study of the patterns of oxygen distribution through the recovery plant water, steam and condensate channel, as well as in main engine cooling spaces. The purpose was to investigate and control corrosion processes. The thermochemical investigations presumed daily measurement of the parameters of main engine, diesel generator, turbogenerator, auxiliary boiler and recovery boiler working processes, and of oxygen concentration in working fluids. Procedures are described and the measurements gathered are summarized in a table. Conclusions concerning what steps might be effective in controlling corrosion are drawn.]]></description>
      <pubDate>Thu, 21 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/400768</guid>
    </item>
    <item>
      <title>THE NATURE OF DEPOSITS ON THE HEATING SURFACES OF MARINE RECOVERY BOILERS</title>
      <link>https://trid.trb.org/View/402705</link>
      <description><![CDATA[The low temperature corrosion of heating surfaces and their rapid fouling with deposits is a problem that requires solution if the degree of heat recovery in shipboard power plants is to be significantly increased. This article therefore examines the mechanism by which deposits form on the heat-recovery suraces of marine boilers so that deposit formation can be predicted at the design stage as a function of the power plant's operating and structural parameters.]]></description>
      <pubDate>Thu, 21 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/402705</guid>
    </item>
    <item>
      <title>BASIC DIRECTIONS IN THE DEVELOPMENT OF MARINE BOILERS</title>
      <link>https://trid.trb.org/View/407631</link>
      <description><![CDATA[In the near future, merchant ships will use a new generation of auxiliary and recovery boilers. The developments that have led to the design of this new generation of boilers with superior technical specifications are reviewed. The directions taken include: improving the economy and expanding the variety of auxiliary mechanisms; raising the level of automation; assuring the capability to operate on inferior quality fuel; and optimizing weight and size.]]></description>
      <pubDate>Thu, 21 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/407631</guid>
    </item>
    <item>
      <title>AUXILIARY BOILERS AND WASTE HEAT SYSTEMS</title>
      <link>https://trid.trb.org/View/160809</link>
      <description><![CDATA[With the deteriorating quality of fuels, the sizes of waste-heat units will have to be increased.  This means higher costs and increased maintenance unless more attention to initial planning and design.  There are two classes of auxiliary boiler, those that supply steam on motor ships for cargo heating, pumping, and other services, and those that can power main propulsion units as "get you home" facility.  Among the types of boiler discussed are the Monomall and the Aalborg water-tube boilers.  The main dimensions of the Monomall can be altered to suit the particular ship and designers are now being asked for units of higher efficiency.  Fitting an economiser can raise efficiency from 80 to 85%.  The Aalborg is a less conventional type of water-tube boiler, more in the style of a smoke-tube or fire-tube boiler.  The water is inside the tube and the gas circulates round the outside and leaves tangentially after giving up its heat.  This boiler is available supplying steam from 10 to 35 t/h, and it can also work in conjunction with exhaust-gas heat exchangers.]]></description>
      <pubDate>Wed, 18 Feb 1981 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/160809</guid>
    </item>
    <item>
      <title>FOULING EFFECTS OF TURBINE EXHAUST GASES ON HEAT EXCHANGER TUBES IS SUBJECT OF NAVY STUDY</title>
      <link>https://trid.trb.org/View/154453</link>
      <description><![CDATA[The use of heat recovery systems with shipboard gas-turbine engine exhausts has generated a need to examine operational problem areas of waste-heat boilers (WHBs).  To ensure efficient WHB operation, it is necessary to minimize gas-side fouling of boiler tubes.  This fouling phenomenon will increase boiler core gas pressure drop, which increases back pressure on the gas-turbine propulsion engine.  In turn, the increased back pressure will result in loss of power output and higher fuel consumption.  Gas-side fouling also produces films that resist heat transfer and act as media for corrosion of boiler tubes.  A study of these problem areas, conducted at the David Taylor Naval Ship Research and Development Center (DTNSRDC), has successfully measured boiler-tube fouling characteristics in a variety of operating conditions.  Through the use of cylindrical fouling probes inserted in gas-turbine exhaust systems, the DTNSRDC tests have resulted in information on fouling film buildup rates, film chemistry, film thermal resistance, and thermal conductivity.]]></description>
      <pubDate>Wed, 27 Aug 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/154453</guid>
    </item>
    <item>
      <title>MARINE FLUIDIZED BED WASTE HEAT BOILER DESIGN AND OPERATING EXPERIENCE</title>
      <link>https://trid.trb.org/View/154140</link>
      <description><![CDATA[The paper describes a project in which a fluidized bed heat exchanger is being used as a marine waste heat boiler for the first time.  The shipowner's requirement was to retrofit a waste heat evaporator unit, linked to the existing auxiliary boilers in a 32 000 dwt product tanker to generate saturated steam for carbon heating, tank cleaning, fuel heating and hotel requirements.  The waste heat was to be recovered from the exhaust of a 8800 kW (12 000 bhp) slow speed diesel.  The paper describes the considerations which led to the choice of the fluidized bed boiler and the problems which were envisaged in transplanting a shore based technology into the marine environment, including the disturbing effect of ship motions on the fluidization of the bed.]]></description>
      <pubDate>Tue, 22 Jul 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/154140</guid>
    </item>
    <item>
      <title>ECONOMICS OF EXHAUST GAS TURBOGENERATORS IN MOTOR SHIPS</title>
      <link>https://trid.trb.org/View/147982</link>
      <description><![CDATA[Utilisation of exhaust-gas energy for turbocharging and various heating purposes in a motor ship still leaves a large proportion of the total exhaust-gas energy unused. Particularly under present competitive conditions and high fuel prices, this calls for a reassessment of the economics of the turbogenerator driver by steam raised in an exhaust-gas boiler; the technical feasibility and operational reliability of such systems are not in doubt. The Author, of AEG-Telefunken, discusses the exhaust-gas turbogenerator and its operational characteristcs in detail, and provides quidance, from the technical and commercial viewpoints, on the results that can be expected from it. Using exhaust-gas energy that would other-wise be lost, the generator can produce between 5% and 13% of the engine power; the lower value applies to modern low-speed two-stroke engines with low exhaust-gas temperatures and relatively small quantities of gas, and the higher value to medium-speed four-strokes with a very high exhaust-gas temperature.  The electrical power needed, in relation to engine power, is greater in small ships than in the larger ships, and the installation of the turbo-generator can only be recommended when the engine has a service power above a certain minimum.  This minimum lies, according to exhaust-gas conditions, between 6 and 12 MW (equivalent to between 9,600 and 19,200 rated horse-power); the corresponding generator outputs would be 420 and 600 kW.  A servicing time (the Author differentiates between this and amortisation time) of up to five years for the capital investment could be justified, in which case, assuming a fuel price of 30 DM per 100 kgh and 7,500 operational hours a year, a 420-kW exhaust-gas turbo-generator could be of economic as well as of technical interest.  At the same fuel price, but with 5,000 operating hr/yr, generator output would need to be about 1,000 kW before becoming economical. The figures given are conservative.  For any installation of an exhaust-gas turbo-generator, the economics should be studied with accurate basic data.  In particular, large increases in fuel prices might result in capital servicing-times of only two to three years.  Order from BSRA as No. 51,230.]]></description>
      <pubDate>Wed, 27 Feb 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/147982</guid>
    </item>
    <item>
      <title>COMPUTER SIMULATION OF A PROPOSED MARINE COGAS PROPULSION SYSTEM</title>
      <link>https://trid.trb.org/View/146931</link>
      <description><![CDATA[The equilibrium at various power levels of a conceptual COGAS (combined gas turbine and steam turbine) system have been modeled on a digital computer.  The steam turbine contributes a higher fraction of total power at part power loads than it does at full power loads.  In the waste heat recovery unit (WHRU) boiling moves away from the economizer as the power level is raised.]]></description>
      <pubDate>Mon, 11 Feb 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/146931</guid>
    </item>
    <item>
      <title>STEAM AND DIESEL: AN ANALYSIS OF FUEL CONSUMPTION</title>
      <link>https://trid.trb.org/View/147513</link>
      <description><![CDATA[The rapid increase in fuel costs has caused shipowners to re-evaluate operations, reassess the economics of alternative propulsion systems, and seek overall economies in ship operations.  The General Electric Company's (U.S.A.) Industrial and Marine Steam Turbine Division recently concluded a comprehensive analysis and comparison of fuel consumption rates for both steam and diesel ship propulsion systems.  The findings are discussed in this abbreviated report of that study.  In preparing their analysis, the authors developed a base for accurately measuring propulsion fuel "efficiency" through the use of a novel "equivalent fuel rate" that equitably compares the low speed diesel to the steam plant.  The study is claimed to provide fuel use rate comparisons that shipowners and operators, naval architects, and shipyards should consider in the selection of ship propulsion machinery.]]></description>
      <pubDate>Mon, 11 Feb 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/147513</guid>
    </item>
    <item>
      <title>APPLICABILITY OF COGAS MARINE POWER PLANTS FOR MERCHANT SHIPS</title>
      <link>https://trid.trb.org/View/83036</link>
      <description><![CDATA[The report presents the results of a project investigating the commercial availability of equipment and the applicability of COGAS marine power plants for U.S. flag merchant ships. The report is subdivided into four parts and two appendices. Part I includes system optimization studies and a literature search. Various alternatives of steam cycles, heat recovery boiler pressures and efficiencies, steam turbine efficiencies and types of fuel are analyzed. Part II includes the work performed to develop the selected optimum steam cycle into a marine COGAS power plant. Part III is a technical bulletin including the design and performance of the COGAS power plant equipment. Part IV includes economic analyses comparing two U.S. flag ships, a containership and a tanker, fitted with steam and COGAS power plants. Appendix 'A' contains the arrangement of machinery drawings of COGAS installations on a containership and a tanker; and Appendix 'B' the equipment drawings of COGAS power plant components.]]></description>
      <pubDate>Wed, 11 Jul 1979 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/83036</guid>
    </item>
  </channel>
</rss>