<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Transport Research International Documentation (TRID)</title>
    <link>https://trid.trb.org/</link>
    <atom:link href="https://trid.trb.org/common/TRIS Suite/feeds/RSS.aspx?s=PHNlYXJjaD48cGFyYW1zPjxwYXJhbSBuYW1lPSJkYXRlaW4iIHZhbHVlPSJhbGwiIC8%2BPHBhcmFtIG5hbWU9InN1YmplY3Rsb2dpYyIgdmFsdWU9Im9yIiAvPjxwYXJhbSBuYW1lPSJ0ZXJtc2xvZ2ljIiB2YWx1ZT0ib3IiIC8%2BPHBhcmFtIG5hbWU9ImxvY2F0aW9uIiB2YWx1ZT0iMCIgLz48L3BhcmFtcz48ZmlsdGVycz48ZmlsdGVyIGZpZWxkPSJpbmRleHRlcm1zIiB2YWx1ZT0iJnF1b3Q7UHVtcCByb29tIHNhZmV0eSZxdW90OyIgb3JpZ2luYWxfdmFsdWU9IiZxdW90O1B1bXAgcm9vbSBzYWZldHkmcXVvdDsiIC8%2BPC9maWx0ZXJzPjxyYW5nZXMgLz48c29ydHM%2BPHNvcnQgZmllbGQ9InB1Ymxpc2hlZCIgb3JkZXI9ImRlc2MiIC8%2BPC9zb3J0cz48cGVyc2lzdHM%2BPHBlcnNpc3QgbmFtZT0icmFuZ2V0eXBlIiB2YWx1ZT0icHVibGlzaGVkZGF0ZSIgLz48L3BlcnNpc3RzPjwvc2VhcmNoPg%3D%3D" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Transport Research International Documentation (TRID)</title>
      <url>https://trid.trb.org/Images/PageHeader-wTitle.jpg</url>
      <link>https://trid.trb.org/</link>
    </image>
    <item>
      <title>PERSONNEL SAFETY AS PART OF THE SHIP REPAIR YARD ORGANIZATION</title>
      <link>https://trid.trb.org/View/74478</link>
      <description><![CDATA[Some risks peculiar to ship repair are reviewed, and research into preventive solutions is summarized.  Work in tanks and pump rooms in tankers is discussed, including protection against asphyxiation and intoxication.  Working at heights, access to holds and tanks, and temporary electrical circuits are dealt with. Order from: NSFI as No. 14740.]]></description>
      <pubDate>Sun, 27 Aug 1978 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/74478</guid>
    </item>
    <item>
      <title>PUMP PERMITS SEPARATE CARGO TANKS</title>
      <link>https://trid.trb.org/View/72398</link>
      <description><![CDATA[Handling chemical cargoes in specialized tankers requires taking measures to preserve both cargo purity and stability. It is necessary to maintain complete bulkhead separation between cargoes, and desirable to eliminate cargo pump rooms on board the vessels.  Submerged pumps enable the vessel operator to load and receive cargo into each tank separately, to wash one cargo tank while others are discharging, and to exercise precise control over the pump's performance with the hydraulic motor.  The hydraulic motor for the submerged pump is connected to the impeller via a short shaft, thereby eliminating the vertical long spindle drive from a deck-positioned motor, and avoiding complex bearing and alignment arrangements.]]></description>
      <pubDate>Wed, 26 Apr 1978 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/72398</guid>
    </item>
    <item>
      <title>PUMP ROOMS ARE DEADLY</title>
      <link>https://trid.trb.org/View/61204</link>
      <description><![CDATA[Petroleum tanker pump room requirements and proposed chemical tanker pump room requirements are reviewed.  A number of grave cargo-related hazards are outlined and protection against these hazards is described.]]></description>
      <pubDate>Tue, 14 Mar 1978 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/61204</guid>
    </item>
    <item>
      <title>TANKSHIP TEXACO NORTH DAKOTA, PUMPROOM EXPLOSION, GULF OF MEXICO, OCTOBER 3, 1973, MARINE CASUALTY REPORT</title>
      <link>https://trid.trb.org/View/30092</link>
      <description><![CDATA[On October 3, 1973, the tankship TEXACO NORTH DAKOTA, en route from Tampa, Florida, to Port Arthur, Texas, experienced a violent explosion in the after pumproom. The force of the explosion caused the forward bulkhead, the after bulkhead, and the overhead to rupture. In the engineroom, abaft the pumproom, three persons died as a result of the explosion. The National Transportation Safety Board determines that the probable cause of the accident was the ignition of fuel-air vapors in the pumproom by hot gases, or other products of combustion, which were being ejected from a steam-driven air compressor.]]></description>
      <pubDate>Sat, 14 Jan 1978 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/30092</guid>
    </item>
    <item>
      <title>DEVELOPMENT OF EXPLOSION SUPPRESSION SYSTEM REQUIREMENTS FOR SHIPBOARD PUMP ROOMS</title>
      <link>https://trid.trb.org/View/63625</link>
      <description><![CDATA[The results of the explosion suppression test series conducted in the forward pump room of the tanker RHODE ISLAND (internal volume of 18,120 cu ft) are reported. Propane/air and n-Hexane/air mixtures near stoichiometric were used in 10 percent of the pump room volume. The n-Hexane was explosively dispersed and ignited by a propane flame. The unsuppressed tests produced maximum pressures of 12 psig. The suppression attempt was unsuccessful because the pressure detectors, set to trigger the suppression system at 1/2 psig, were too slow. The propane was injected through two 1/2 inch pipes and a delay time was provided between injection and ignition to permit the fuel to become quiescent. Upon ignition, the pressure developed very similarly to the n-Hexane explosions and more rapidly than expected. This was finally attributed to obstructions creating turbulence which increased the flame speed and thus the rate of pressure rise. Ultraviolet detectors detected the incipient explosion from 110 to 400+ milli-seconds before a pressure detector set for 1/2 psig. Two explosion suppression systems were tested. They each were based on the following principles: (1) a UV detector sees the incipient explosion, (2) the control circuitry fires initiators, (3) the initiators rupture a diaphragm releasing a suppressing agent, (4) the agent is thrown at the flame front, and (5) the explosion is suppressed. In analyzing the tests, the size of the fireball at agent contact, agent breakdown, afterburning and the maximum pressure were considered.]]></description>
      <pubDate>Wed, 16 Feb 1977 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/63625</guid>
    </item>
  </channel>
</rss>