<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Transport Research International Documentation (TRID)</title>
    <link>https://trid.trb.org/</link>
    <atom:link href="https://trid.trb.org/common/TRIS Suite/feeds/RSS.aspx?s=PHNlYXJjaD48cGFyYW1zPjxwYXJhbSBuYW1lPSJkYXRlaW4iIHZhbHVlPSJhbGwiIC8%2BPHBhcmFtIG5hbWU9InN1YmplY3Rsb2dpYyIgdmFsdWU9Im9yIiAvPjxwYXJhbSBuYW1lPSJ0ZXJtc2xvZ2ljIiB2YWx1ZT0ib3IiIC8%2BPHBhcmFtIG5hbWU9ImxvY2F0aW9uIiB2YWx1ZT0iMCIgLz48L3BhcmFtcz48ZmlsdGVycz48ZmlsdGVyIGZpZWxkPSJpbmRleHRlcm1zIiB2YWx1ZT0iJnF1b3Q7U2x1cnJ5IHRyZW5jaCB3YWxsJnF1b3Q7IiBvcmlnaW5hbF92YWx1ZT0iJnF1b3Q7U2x1cnJ5IHRyZW5jaCB3YWxsJnF1b3Q7IiAvPjwvZmlsdGVycz48cmFuZ2VzIC8%2BPHNvcnRzPjxzb3J0IGZpZWxkPSJwdWJsaXNoZWQiIG9yZGVyPSJkZXNjIiAvPjwvc29ydHM%2BPHBlcnNpc3RzPjxwZXJzaXN0IG5hbWU9InJhbmdldHlwZSIgdmFsdWU9InB1Ymxpc2hlZGRhdGUiIC8%2BPC9wZXJzaXN0cz48L3NlYXJjaD4%3D" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Transport Research International Documentation (TRID)</title>
      <url>https://trid.trb.org/Images/PageHeader-wTitle.jpg</url>
      <link>https://trid.trb.org/</link>
    </image>
    <item>
      <title>AUSCULTATION OF STRUCTURES AND PILES BY MEANS OF NON- DESTRUCTIVE TESTS</title>
      <link>https://trid.trb.org/View/1081976</link>
      <description><![CDATA[THE PRINCIPLES OF DYNAMIC AUSCULTATION BY MEANS OF SOUND WAVE PROPAGATION  VELOCITY ARE OUTLINED TOGETHER WITH ITS APPLICATION TO (1) CONCRETE (CONTROL OF HOMOGENEITY, LOCALISATION OF DEFECTS, EVALUATION OF STRENGTH. IN THE CASE OF PRESTRESSED OR REINFORCED CONCRETE, MAGNETIC DEVICES ARE USED TO LOCATE THE REINFORCEMENT SO AS TO FACILITATE THE SELECTION OF WAVE TRAJECTORY TO PREVENT THE WAVES FROM BEING ACCELERATED BY THE STEEL REINFORCEMENT), (2) STONES AND ROCKS, AND (3) BITUMINOUS MATERIALS. THE CONTROL OF THE QUALITY OF PILES AND SLURRY TRENCH WALLS IS DISCUSSED. THE CEBTP HAS DEVELOPED THREE METHODS: ACOUSTIC CORE DRILLING FOR SLURRY TRENCH WALL UNITS.  THIS METHOD CAN BE USED IF PRECAUTIONS HAVE BEEN TAKEN DURING THE CASTING OF THE PILES; VIBRATORY CONTROL METHOD APPLICABLE IF THE HEAD OF THE PILE REMAINS ACCESSIBLE; AND THE ECHO CONTROL METHOD FOR PRECAST PILES TO CHECK WHETHER CRACKS OR BREAKS HAVE OCCURRED DURING DRIVING.]]></description>
      <pubDate>Sun, 21 Nov 2010 18:56:58 GMT</pubDate>
      <guid>https://trid.trb.org/View/1081976</guid>
    </item>
    <item>
      <title>EXCAVATION ON URBAN CONSTRUCTION SITES</title>
      <link>https://trid.trb.org/View/1081951</link>
      <description><![CDATA[DETAILS ARE GIVEN OF THE DEVELOPMENT IN FOUNDATION CONSTRUCTION TECHNIQUES, ESPECIALLY URBAN EXCAVATION WORKS. PROBLEMS ENCOUNTERED DURING CONSTRUCTION ARE DESCRIBED PARTICULARLY UNDERPINNING OF PARTY WALLS. THE BERLIN METHOD IS OUTLINED TOGETHER WITH THE APPLICATION OF THE SLURRY TRENCH WALL METHOD, ANCHORAGE OF SLURRY TRENCH WALLS BY MEANS OF PRESTRESSED TIE RODS, BEARING SLURRY TRENCH WALLS AND MOLE DRILLING. THE TEMPORARY AND PERMANENT  PROTECTION OF THE BOTTOM OF EXCAVATION PITS IS DISCUSSED. A PART OF THE ARTICLE IS DEVOTED TO SPECIAL FOUNDATIONS: PRECAST PROPS AND PREFABRICATED  WALLS.]]></description>
      <pubDate>Sun, 21 Nov 2010 18:56:22 GMT</pubDate>
      <guid>https://trid.trb.org/View/1081951</guid>
    </item>
    <item>
      <title>EXPERIMENTAL DETERMINATION OF PRESSURES INSIDE A SOIL MASS AND AGAINST A CAST IN-PLACE WALL</title>
      <link>https://trid.trb.org/View/1081683</link>
      <description><![CDATA[DURING THE CONSTRUCTION OF A LOCK IN ZENST ON THE BRUSSELS CANAL, A PROGRAMME OF CONTROL MEASUREMENTS WAS ESTABLISHED FOR THE EXPERIMENTAL DETERMINATION OF STRESSES INSIDE A SOIL MASS AND AGAINST A SLURRY TRENCH WALL. THE  WALL, A TEMPORARY STRUCTURE, WAS USED AS A RETAINING STRUCTURE BEHIND WHICH EXCAVATION FOR THE NEW LOCK WAS TAKING PLACE. A SLOPE STARTING AT THE TOP OF THE WALL JOINED THE NATURAL TERRAIN IN THE VICINITY OF THE EXISTING  CANAL. THE PRESSURE WAS MEASURED BY MEANS OF STRAIN GAUGES SUNK IN THE GROUND AT VARIOUS LOCATIONS AND DIFFERENT DEPTHS, IN THE CENTRE OF THE SOIL  MASS AND AGAINST THE WALL. MEASUREMENTS WERE USED TO OBTAIN THE VALUE OF  EARTH PRESSURE AT REST. THE VALUES OF EARTH PRESSURE AGAINST THE WALL WERE FOUND TO BE HIGHER THAN EXPECTED FROM STANDARD THEORIES. SEE ALSO IRRD ABSTRACT NO 100334.]]></description>
      <pubDate>Sun, 21 Nov 2010 18:45:37 GMT</pubDate>
      <guid>https://trid.trb.org/View/1081683</guid>
    </item>
    <item>
      <title>FLEXIBLE DIAPHRAGM WALLS CAST-IN-SITU WITH A BENTONITE- CEMENT DRILLING MUD</title>
      <link>https://trid.trb.org/View/1081681</link>
      <description><![CDATA[IN THE FIELD OF SLURRY TRENCH WALL CONSTRUCTION, RECENT RESEARCH AND PRACTICAL APPLICATIONS HAVE LED TO THE DEVELOPMENT OF A TECHNIQUE COMBINING DRILLING AND FILLING IN ONE OPERATION. THIS TECHNIQUE CONSISTS IN USING A GROUT WHICH CAN BE UTILIZED AS A DRILLING FLUID AND WHICH CAN, LATER, REACH THE REQUIRED DEFORMABILITY AND STRENGTH PROPERTIES, EVEN UNDER VERY HIGH HYDRAULIC LOADS. THIS REPORT PRESENTS PRELIMINARY RESULTS OF SOME TESTS ON BENTONITE-CEMENT MIXTURES AND OF A SERIES OF STATIC ANALYSES WITH A VIEW TO INVESTIGATING THE MAJOR FACTORS INFLUENCING THE SUCCESS OF THE TECHNIQUE. SEE IRRD ABSTRACT NO.100334.]]></description>
      <pubDate>Sun, 21 Nov 2010 18:45:35 GMT</pubDate>
      <guid>https://trid.trb.org/View/1081681</guid>
    </item>
    <item>
      <title>IN-SITU EXPERIMENTS ON A DIAPHRAGM WALL WITH HEAD ANCHORAGE</title>
      <link>https://trid.trb.org/View/1081665</link>
      <description><![CDATA[AS PART OF THE CONSTRUCTION WORK FOR THE CANAL FROM THE RHINE TO THE RHONE THROUGH THE TOWN OF MULHOUSE, AN EXPERIMENTAL SLURRY TRENCH WALL 16M DEEP AND 0,80M THICK ANCHORAGE AT THE HEAD BY MEANS OF RODS WAS BUILT. A LENGTH OF 10M WAS INSTRUMENTED IN ORDER TO MEASURE; THE EARTH PRESSURE ON THE WALL, THE STRESSES IN THE WALL, THE EFFORTS IN THE RODS AND THE DISPLACEMENTS AT THE HEAD OF THE WALL. THIS REPORT DESCRIBES THE BEHAVIOUR OF THE WALL AND THE THE TERRAIN DURING THE VARIOUS STAGES OF CONSTRUCTION (APPLICATION OF TENSION TO THE RODS, DREDGING DOWN TO 9,30M, LOWERING OF THE LEVEL OF THE WATER IN THE CANAL), AND COMPARES RESULTS OBTAINED WITH A NUMBER OF  CALCULATION METHODS REGARDING THE DISTRIBUTION OF THE BENDING MOMENT AND  ITS MAXIMUM VALUE. SEE ALSO IRRD ABSTRACT NO.100334.]]></description>
      <pubDate>Sun, 21 Nov 2010 18:45:08 GMT</pubDate>
      <guid>https://trid.trb.org/View/1081665</guid>
    </item>
    <item>
      <title>ACTIVE AND PASSIVE EARTH PRESSURE MEASUREMENTS MADE WITH 42 PAIRS OF STRUTS SUBJECTED TO LOAD</title>
      <link>https://trid.trb.org/View/1081663</link>
      <description><![CDATA[DURING THE CONSTRUCTION OF THE LYON UNDERGROUND, AN EXPERIMENTAL RECTANGULAR ENCLOSURE, 56M X 3,3M, WAS BUILT UNDER THE GROUNDWATER LEVEL IN SAND AND ALLUVIAL GRAVEL BY MEANS OF SLURRY TRENCH WALLS 11M DEEP. FOLLOWING THE  INJECTION AT THE BOTTOM OF THE PIT, EARTHWORKS AND INSERTION OF THE STRUTS IN 7 HORIZONTAL LAYERS AND TWO ROWS PER 5M- PANEL WERE CARRIED OUT OVER  A DEPTH OF 7M. THE WALLS WERE BROUGHT CLOSER THEN MOVED APART BY MODIFYING THE LENGTH OF THE STRUTS. A LATERAL BEAM WAS SUBJECTED TO LOAD, AND THE  INFLUENCE OF THE ACTIVE EARTH PRESSURE MEASURED WITHOUT MOVING THE WALLS. STRESSES IN THE CONCRETE WALLS WERE MEASURED BY ACOUSTIC METHODS. THE STRUCTURE WILL BE RETAINED AS PART OF THE FUTURE UNDERGROUND. SEE ALSO IRRD ABSTRACT NO 100334.]]></description>
      <pubDate>Sun, 21 Nov 2010 18:45:03 GMT</pubDate>
      <guid>https://trid.trb.org/View/1081663</guid>
    </item>
    <item>
      <title>PROCEEDINGS OF THE 5TH EUROPEAN CONFERENCE ON SOIL MECHANICS AND FOUNDATION ENGINEERING, MADRID, 10-13TH APRIL 1972</title>
      <link>https://trid.trb.org/View/1081652</link>
      <description><![CDATA[THE 5TH EUROPEAN CONGRESS ORGANISED BY THE SPANISH SOCIETY FOR SOIL MECHANICS AND FOUNDATION ENGINEERING WAS ESPECIALLY CONCERNED WITH STRUCTURES SUBJECTED TO LATERAL STRESSES. THE 4 SESSIONS HAD THE FOLLOWING TITLES: (1)  GENERAL THEORIES OF ACTIVE AND PASSIVE EARTH PRESSURE, (2) STABILITY OF RIGID STRUCTURES, (3) STABILITY OF FLEXIBLE STRUCTURES - A) ANCHORED SHEET  PILE WALLS, BRACED EXCAVATIONS, SLURRY TRENCH WALLS, D) PILES AND GROUPS  OF PILES, AND (4) PROBLEMS OF CONSTRUCTION AND PRACTICAL EXAMPLES. FOR ABSTRACTS OF PAPERS PRESENTED AT THE CONFERENCE SEE IRRD ABSTRACTS NOS 100335 TO 50, AND 201338 TO 93.]]></description>
      <pubDate>Sun, 21 Nov 2010 18:44:45 GMT</pubDate>
      <guid>https://trid.trb.org/View/1081652</guid>
    </item>
    <item>
      <title>COLLOQUIUM ON METAL SHEET PILES. CONSEQUENCES FOR THE CALCULATION OF CONCRETE SLURRY TRENCH WALLS</title>
      <link>https://trid.trb.org/View/1081222</link>
      <description><![CDATA[THE AUTHORS RECALL THE DIFFICULTIES OF USING THE STANDARD CALCULATION METHOD FOR SHEET PILES BASED ON THE RANKINE THEORY. THE METHOD OF CALCULATION  OF "EARTH PRESSURE AT REST" IS OUTLINED AND ITS APPLICATION TO DIFFERENT  TYPES OF SHEET PILE WALLS WITH OR WITHOUT ANCHORAGE IS DISCUSSED. A COMPARATIVE STUDY IS MADE OF THE "AT REST" METHOD AND THE STANDARD METHOD, ALLOCATING A SAFETY FACTOR OF 2 TO THE RANKINE COEFFICIENT OF PASSIVE EARTH PRESSURE. THE SAVINGS RESULTING FROM THE USE OF THE "AT REST" METHOD AMOUNT  TO 5.2% IN THE CASE OF AN EMBANKMENT WITHOUT ANY SURCHARGE, AND TO 9% IN  THE CASE OF AN EMBANKMENT UNDER SURCHARGE. THIS METHOD PRODUCES A SINGLE  SOLUTION WHICH IS CHEAPER AND GIVES A WELL-DEFINED SAFETY FACTOR WHILE WITH THE STANDARD METHOD NUMEROUS COSTLY SOLUTIONS ARE OBTAINED ACCORDING TO THE SAFETY FACTOR CHOSEN. THE APPLICATION OF THE METHOD TO THE DESIGN OF  CONCRETE SLURRY TRENCH WALL IS EXAMINED.]]></description>
      <pubDate>Sun, 21 Nov 2010 18:30:46 GMT</pubDate>
      <guid>https://trid.trb.org/View/1081222</guid>
    </item>
    <item>
      <title>SOIL MECHANICS APPLICATIONS. VOLUME 2</title>
      <link>https://trid.trb.org/View/1081007</link>
      <description><![CDATA[VOLUMES 1 AND 2 SUMMARISE THE APPLICATIONS OF THE THEORY DESCRIBED IN A BOOK PUBLISHED IN 1968 BY THE SAME AUTHORS AND ENTITLED "SOIL MECHANICS". THE TOPICS TREATED IN VOLUME 2 ARE THE STABILITY OF RETAINING WALLS, REINFORCED CONCRETE SLURRY TRENCH WALLS AND USE OF THIXOTROPIC MUD. UTILIZATION OF SHEET PILES FOR RETAINING STRUCTURES (TECHNOLOGY AND STABILITY OF CORRUGATED SHEET PILE WALLS, CELLULAR CONSTRUCTION SYSTEMS USING FLAT SHEET PILES, DEEP TRENCH SHEETING, SLOPE STABILITY, AND THE LOWERING OF WATER TABLES. SEE IRRD ABSTRACT NO 100356.]]></description>
      <pubDate>Sun, 21 Nov 2010 18:24:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/1081007</guid>
    </item>
    <item>
      <title>THE TUNNEL BORDER ROAD WHICH FORMS PART OF THE COLOGNE URBAN MOTORWAY</title>
      <link>https://trid.trb.org/View/1078863</link>
      <description><![CDATA[THE AUTHOR DESCRIBES THE WORK ON THE TUNNEL ON THE RIGHT BANK OF THE RHINE WHICH FORMS PART OF THE URBAN MOTORWAY IN COLOGNE. DETAILS ARE GIVEN OF THE SECURING OF THE ARCHES, THE CONSTRUCTION OF THE SLURRY TRENCH WALLS, THE INCORPORATION OF THE CONCRETE, THE FINAL SOIL EXCAVATION AND THE INCORPORATION OF THE ROOF OF THE TUNNEL.]]></description>
      <pubDate>Sun, 21 Nov 2010 17:26:13 GMT</pubDate>
      <guid>https://trid.trb.org/View/1078863</guid>
    </item>
    <item>
      <title>CONTROL OF TENSILE STRESSES IN THE PERMANENT PRESTRESSED ANCHORAGE RODS OF THE SLURRY TRENCH WALL OF THE FOURVIERE ARCHEOLOGICAL MUSEUM IN LYON</title>
      <link>https://trid.trb.org/View/1078156</link>
      <description><![CDATA[117 PRESTRESSED ANCHORAGE RODS WERE INSTALLED ON THE SITE OF THE ARCHEOLOGICAL MUSEUM IN FOURVIERE, MOST OF THEM BEING PERMANENT. THEY SECURE THE SLURRY TRENCH WALL NEEDED TO SUPPORT AN EXCAVATION APPROXIMATELY 20 M DEEP.  60 RODS WERE INSTRUMENTED WITH STRESS-MEASURING APPARATUS (SOUND CONTROL  DEVICES, DYNAMOMETERS, APPARATUS FOR MEASURING EXPANSION). TO FACILITATE  COMPARISON, A SERIES OF SEVERAL TYPES OF APPARATUS WERE INSTALLED ON THE  SAME RODS. MEASUREMENTS, TAKEN OVER A PERIOD OF 4 MONTHS, HAVE YIELDED DATA ON THE BEHAVIOUR OF THE ROD AND THE WALL, THE CHARACTERISTICS OF THE VARIOUS TYPES OF APPARATUS, AND THEIR SENSITIVITY TO CREEP PHENOMENA. IT IS  ENVISAGED TO CONTINUE TO TAKE MEASUREMENTS OVER A PERIOD OF AT LEAST 4 YEARS.]]></description>
      <pubDate>Sun, 21 Nov 2010 16:45:24 GMT</pubDate>
      <guid>https://trid.trb.org/View/1078156</guid>
    </item>
    <item>
      <title>THE RECONSTRUCTION OF THE ALMA BRIDGE</title>
      <link>https://trid.trb.org/View/1078072</link>
      <description><![CDATA[THE NEW ALMA BRIDGE IS 42 M WIDE; IT SUPPORTS 2 14 M-WIDE CARRIAGEWAYS, SEPARATED BY A 2M-WIDE CENTRAL RESERVE AND HAS 2 LATERAL FOOTPATHS 6 M WIDE  EACH. IT IS APPROXIMATELY 150 M LONG, INCLUDING THE ABUTMENTS. AFTER THE  OPENING OF THE NEW UPSTREAM HALF-BRIDGE TO TRAFFIC, THE PRESENT BRIDGE WILL BE DEMOLISHED AND THE CONSTRUCTION OF THE DOWNSTREAM HALF-BRIDGE WILL BE STARTED AT THE SITE OF THE PRESENT BRIDGE. THE LONGITUDINAL PROFILE OF THE NEW BRIDGE CONSISTS OF A CIRCULAR ARC WITH A RADIUS OF 1407 M CONNECTED AT ITS EXTREMITIES TO ACCESS RAMPS. BECAUSE OF THE VERY LOW QUALITY OF THE FOUNDATION LAYERS, THE FOUNDATION OF THE NEW STRUCTURE HAD TO BE ON CHALK. DUE TO NAVIGATION REQUIREMENTS AND TO THE HIGH COST OF THE RIVER BEARINGS (THE BEARINGS HAVING TO GO TO A GREAT DEPTH) THE NEW BRIDGE HAS ONLY ONE RIVER BEARING. THE DECK COMPRISES TWO SPANS (110M AND 31,50M )CONSISTING OF BOX GIRDERS UNDER A HIGH-STRENGTH STEEL CARRIAGEWAY SUPPORTING A REINFORCED CONCRETE SLAB OF THE ROBINSON TYPE. THE ABUTMENTS ARE FOUNDED ON DRILLED REINFORCED CONCRETE PILES, 1,08 M IN DIAMETER ANCHORED IN CHALK. THE  MAXIMUM STRESSES AT THE FOOT OF THE PILES ARE 30 BARS UNDER CONTINUED LOAD AND 40 BARS WITH OVERLOAD. THE PIER IS FOUNDED ON SLURRY TRENCH WALLS 6,26M WIDE AND 0.80M THICK ANCHORED IN CHALK. BRIEF DETAILS ARE GIVEN OF THE SERVICE MAINS INSIDE THE BOX GIRDER, STAGES OF ERECTION, CORNICE AND PARAPETS, AND PROTECTION OF THE BOX GIRDERS AGAINST CORROSION. THE MAIN QUANTITIES OF MATERIALS USED ARE QUOTED. THIS ARTICLE IS IN FRENCH.]]></description>
      <pubDate>Sun, 21 Nov 2010 16:41:50 GMT</pubDate>
      <guid>https://trid.trb.org/View/1078072</guid>
    </item>
    <item>
      <title>DURABILITY OF CLAY-CEMENT OR BENTONITE-CEMENT MIXTURES IN THEIR VARIOUS APPLICATIONS</title>
      <link>https://trid.trb.org/View/1078071</link>
      <description><![CDATA[THE AUTHOR RECALLS THE VARIOUS USES OF CLAY-CEMENT AND BENTOMITE-CEMENT MIXTURES IN PARTICULAR IN THE CONSTRUCTION OF SLURRY TRENCH WALLS WHERE THE  MIXTURE IS USED AS DRILLING FLUID AND FOUNDATION MATERIAL. ATTENTION IS DRAWN TO THE FACT THAT, WHATEVER TYPE OF APPLICATION, THE DURABILITY OF THE MIXTURES MUST BE ENSURED. THE CEMENT IN THE GROUT, ALTHOUGH MIXED WITH A  MINERAL COLLOID (CLAY OR BENTONITE) AND A QUANTITY OF WATER MUCH LARGER THAN THAT OF CONCRETE, CONTINUES TO HARDEN QUITE NORMALLY, THAT IS TO SAY AT A GROWTH RATE PROPORTIONAL TO THE TIME LOGARITHM. THIS OBSERVATION IS VALID FOR ANY PROPORTION OF CEMENT/WATER, THE NATURE OF THE COLLOID ADDED, AND THE TYPE OF CEMENT (EXCEPT FOR A VERY FEW CASES). THE CURING METHOD HAS VERY LITTLE INFLUENCE ON THE EVOLUTION OF STRENGTH IN TIME. THE AUTHOR ALSO INVESTIGATES THE INFLUENCE OF CORROSIVE ENVIRONMENT: VERY PURE WATER, ACID WATER, SELENITIC WATER, AND PETROLEUM PRODUCTS. IN ALL CASES, IT WAS OBSERVED THAT CLAY- CEMENT AND BENTONITE-CEMENT MIXTURES OFFERED A HIGHER STRENGTH AND RESISTANCE TO WATER THAN CONVENTIONAL CONCRETE. THIS ARTICLE IS IN FRENCH.]]></description>
      <pubDate>Sun, 21 Nov 2010 16:41:48 GMT</pubDate>
      <guid>https://trid.trb.org/View/1078071</guid>
    </item>
    <item>
      <title>THE PREFABRICATED PANOSOL WALL (PROCESS PATENTED BY SOLETANCHE)</title>
      <link>https://trid.trb.org/View/1078060</link>
      <description><![CDATA[THE PREFABRICATED WALL IS POSITIONED AND SEALED IN A TRENCH PREVIOUSLY EXCAVATED BY MEANS OF A SPECIAL GROUT; THE GROUT USED TO SEAL THE PANEL IS THE SAME GROUT AS THE ONE USED TO EXCAVATE THE TRENCH. IT CONTAINS CEMENT AND BENTONITE, AND ITS SETTING IS RETARDED BY THE ADDITION OF ADMIXTURES. THE CEMENT GENERALLY USED IS C.L.K. SO THAT THE GROUT OBTAINED IS RESISTANT  TO AGGRESSIVE ENVIRONMENT, ESPECIALLY SLIGHTLY SELENITIC WATER. THE INSTALLATION MUST BE CARRIED OUT WITH GREAT CARE AND SPECIAL ATTENTION MUST BE  PAID TO THE POSSIBILITY OF CONTAMINATION BY THE TERRAIN. DETAILS ARE GIVEN OF THE PREFABRICATED ELEMENTS (REINFORCED CONCRETE), THE TRENCH (THE CONSTRUCTION OF WHICH IS SIMILAR TO THAT OF TRENCHES FOR SLURRY TRENCH WALLS), AND OF THE POSITIONING AND SEALING OF THE PREFABRICATED ELEMENTS. THE ADVANTAGES OF THIS NEW PROCESS OVER THE SLURRY TRENCH WALL CAST-IN-SITU ARE  OUTLINED. THIS ARTICLE IS IN FRENCH.]]></description>
      <pubDate>Sun, 21 Nov 2010 16:41:24 GMT</pubDate>
      <guid>https://trid.trb.org/View/1078060</guid>
    </item>
    <item>
      <title>THE SLURRY TRENCH WALL CONSTRUCTION METHOD</title>
      <link>https://trid.trb.org/View/1075970</link>
      <description><![CDATA[THE SLURRY TRENCH WALL METHOD DATES BACK SOME TWENTY YEARS AND IS THEREFORE A RELATIVELY NEW BUILDING PROCESS. BESIDE THE WELL-KNOWN BORING AND PILING METHODS IT HAS GAINED A FIRM PLACE AND IS WIDELY USED PARTICULARLY IN MUNICIPAL BELOW-GROUND BUILDING. DESPITE ITS MORE FREQUENT USE IT IS LARGELY HIDDEN FROM THE PUBLIC AS ALL THE ACTUAL WORK IN CONNECTION WITH THE SLURRY TRENCH WALL TAKES PLACE INSIDE A MUDDY LIQUID AND OFTEN THE SURROUNDING AREA IS AFFECTED BY POLLUTION. THE ARTICLE DEALS WITH THE TECHNICAL PROBLEMS, ADVANTAGES AND DISADVANTAGES, WORKING PROCESSES AND RANGE OF APPLICATIONS OF THE METHOD.]]></description>
      <pubDate>Sun, 21 Nov 2010 15:39:35 GMT</pubDate>
      <guid>https://trid.trb.org/View/1075970</guid>
    </item>
  </channel>
</rss>