<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Transport Research International Documentation (TRID)</title>
    <link>https://trid.trb.org/</link>
    <atom:link href="https://trid.trb.org/common/TRIS Suite/feeds/RSS.aspx?s=PHNlYXJjaD48cGFyYW1zPjxwYXJhbSBuYW1lPSJkYXRlaW4iIHZhbHVlPSJhbGwiIC8%2BPHBhcmFtIG5hbWU9InN1YmplY3Rsb2dpYyIgdmFsdWU9Im9yIiAvPjxwYXJhbSBuYW1lPSJ0ZXJtc2xvZ2ljIiB2YWx1ZT0ib3IiIC8%2BPHBhcmFtIG5hbWU9ImxvY2F0aW9uIiB2YWx1ZT0iMCIgLz48L3BhcmFtcz48ZmlsdGVycz48ZmlsdGVyIGZpZWxkPSJpbmRleHRlcm1zIiB2YWx1ZT0iJnF1b3Q7Tm9yZm9sayBTb3V0aGVybiBDb3Jwb3JhdGlvbiZxdW90OyIgb3JpZ2luYWxfdmFsdWU9IiZxdW90O05vcmZvbGsgU291dGhlcm4gQ29ycG9yYXRpb24mcXVvdDsiIC8%2BPC9maWx0ZXJzPjxyYW5nZXMgLz48c29ydHM%2BPHNvcnQgZmllbGQ9InB1Ymxpc2hlZCIgb3JkZXI9ImRlc2MiIC8%2BPC9zb3J0cz48cGVyc2lzdHM%2BPHBlcnNpc3QgbmFtZT0icmFuZ2V0eXBlIiB2YWx1ZT0icHVibGlzaGVkZGF0ZSIgLz48L3BlcnNpc3RzPjwvc2VhcmNoPg%3D%3D" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Transport Research International Documentation (TRID)</title>
      <url>https://trid.trb.org/Images/PageHeader-wTitle.jpg</url>
      <link>https://trid.trb.org/</link>
    </image>
    <item>
      <title>Hybrid Locomotive for Energy Savings and Reduced Emissions</title>
      <link>https://trid.trb.org/View/1481455</link>
      <description><![CDATA[Norfolk Southern Corporation (NS) and Pennsylvania State University tested several different battery systems in hybrid locomotives. Advanced lithium-ion battery technology was the only kind that displayed the capacity to perform in heavy switching or local service. Testing proved hybrid locomotives could reduce emissions and save fuel, sometimes in significant amounts. However, even with the best assumptions taken into consideration, these locomotives would require high annual operating subsidies.]]></description>
      <pubDate>Wed, 13 Sep 2017 16:27:07 GMT</pubDate>
      <guid>https://trid.trb.org/View/1481455</guid>
    </item>
    <item>
      <title>A toll-based bi-level programming approach to managing hazardous materials shipments over an intermodal transportation network</title>
      <link>https://trid.trb.org/View/1417969</link>
      <description><![CDATA[This research proposes a bi-level bi-objective model to regulate the usage of rail intermodal terminals for hazardous materials (hazmat) shipments, where government imposes tolls to deter carriers from using certain terminals. The complexity of the resulting mathematical program motivates the development of a hybrid speed-constrained multi-objective particle swarm optimization algorithm, which is then integrated with CPLEX, to solve the model. Through a real problem instance based on the intermodal service chain of Norfolk Southern in US, the toll-setting model is examined and further compared with a regular network design approach, in which certain terminals are closed to hazmat containers. The computational results show that the toll-setting policy is more practical and efficient, and the two models can be combined as a two-stage strategy in long-term hazmat transportation regulations. Additional managerial insights are derived for different stakeholders.]]></description>
      <pubDate>Mon, 29 Aug 2016 11:12:15 GMT</pubDate>
      <guid>https://trid.trb.org/View/1417969</guid>
    </item>
    <item>
      <title>Norfolk Southern looks beyond PTC in telecoms enhancement</title>
      <link>https://trid.trb.org/View/1406442</link>
      <description><![CDATA[Norfolk Southern, a US Class I railroad, is gradually migrating its communications network to an all-Internet Protocol (IP) infrastructure. In addition to supporting the mandatory deployment of Positive Train Control (PCT), this will also provide the business with wider benefits, as presented in this article.]]></description>
      <pubDate>Fri, 20 May 2016 15:54:39 GMT</pubDate>
      <guid>https://trid.trb.org/View/1406442</guid>
    </item>
    <item>
      <title>Track to the Future</title>
      <link>https://trid.trb.org/View/1280220</link>
      <description><![CDATA[In 2007, Norfolk Southern Corp. developed a five-year plan to improve the company's safety and service, with a rigorous process for how the company would achieve those goals. Unfortunately, the economy took a downturn which undermined their plan. The team at Norfolk Southern realized that they would not be able to meet their goals under their previous timeframe, so they rebranded their strategy. The strategic process, which they called Future Track, was developed to be sustainable and aligned with the company's one- and three-year goals. Future Track helps prioritize projects for infrastructure, equipment, and technology. Under the Future Track initiatives, a number of new projects are underway.]]></description>
      <pubDate>Tue, 24 Dec 2013 07:47:46 GMT</pubDate>
      <guid>https://trid.trb.org/View/1280220</guid>
    </item>
    <item>
      <title>Stepping It Up on the Sustainability Front</title>
      <link>https://trid.trb.org/View/1136874</link>
      <description><![CDATA[This article discusses how, from equipment purchases to productivity enhancements, Class Is’ are taking bigger steps towards shrinking rail’s environmental footprint. The article shows how Norfolk Southern Corporation (NS) and GreenTrees® entered into a conservation agreement that committed NS to planting 6 million trees across 10,000 Mississippi Delta acres. Trees were planted on 1,400 acres by the end of last year, and NS officials anticipate planting another 1,400 acres this year. Reforestation is now a key component in NS approach to reducing the railroad’s impact on the environment. NS and the other Class Is have been walking the environmental sustainability path for decades. That path started with their reactions to federally mandated environmental regulations. But over time, the railroads have evolved from simply complying with environmental laws to proactively pursuing sustainable business practices that make economic sense and reduce railroading’s impact on the environment.]]></description>
      <pubDate>Wed, 25 Apr 2012 07:58:15 GMT</pubDate>
      <guid>https://trid.trb.org/View/1136874</guid>
    </item>
    <item>
      <title>Partnering</title>
      <link>https://trid.trb.org/View/887628</link>
      <description><![CDATA[This article describes various joint ventures and public private partnerships (PPPs) engaged in by Norfolk Southern Corp. (NS) in order to develop networks and services in response to demand five, 10, and even 20 or more years into the future. U.S. freight-rail demand is expected to double in the next 30 years, so network planning is taking on new urgency. Some of the goals include shortening routes and establishing regional corridors and more far-reaching long-distance gateways. By creating partnerships with governments, the Class I railroad can shorten project development times, leverage capital investment, and divert truck traffic. NS is among the most active railroads in its class in this type of project. In addition to working with governments, it is teaming up with other Class Is, regional railroads, and short line railroads. Partnerships allow the participants to fill in gaps in their networks, reduce transit times, and shift from spending resources on building or acquiring track to forming partnerships to create interline networks. In May, NS and 10 New York State short lines formed the Empire Link joint venture, for example. The network was formed to divert short-haul truck moves in the New York/New Jersey/Pennsylvania region. Since 2004, NS has been seeking support for the Heartland Corridor, a double-stack route through Virginia, West Virginia, and Ohio. Another joint venture is the Crescent Corridor, a 1,400-mile corridor that would run along Interstate 81 through New Jersey, Pennsylvania, Virginia, North and South Carolina, Georgia, Tennessee, Mississippi, and Louisiana. A number of other PPPs and joint ventures are also described.]]></description>
      <pubDate>Thu, 30 Apr 2009 08:28:01 GMT</pubDate>
      <guid>https://trid.trb.org/View/887628</guid>
    </item>
    <item>
      <title>ECP brakes go live</title>
      <link>https://trid.trb.org/View/845200</link>
      <description><![CDATA[Subtitle: Norfolk Southern coal train uses new technology that could improve safety, increase rail capacity.]]></description>
      <pubDate>Mon, 28 Jan 2008 09:44:29 GMT</pubDate>
      <guid>https://trid.trb.org/View/845200</guid>
    </item>
    <item>
      <title>Setting up camp</title>
      <link>https://trid.trb.org/View/844868</link>
      <description><![CDATA[Subtitle: Union, railroad battle before Congress to eliminate use of 'camp cars' for rail crews.]]></description>
      <pubDate>Mon, 28 Jan 2008 09:07:53 GMT</pubDate>
      <guid>https://trid.trb.org/View/844868</guid>
    </item>
    <item>
      <title>Fueling the bottom line</title>
      <link>https://trid.trb.org/View/838075</link>
      <description><![CDATA[Subtitle: Investment in coal-based synthetic fuel operations promises millions of dollars in benefits for NS.]]></description>
      <pubDate>Mon, 15 Oct 2007 12:30:55 GMT</pubDate>
      <guid>https://trid.trb.org/View/838075</guid>
    </item>
    <item>
      <title>Norfolk Southern seeks public funding for $2 billion rail freight corridor</title>
      <link>https://trid.trb.org/View/837291</link>
      <description><![CDATA[]]></description>
      <pubDate>Mon, 15 Oct 2007 09:59:39 GMT</pubDate>
      <guid>https://trid.trb.org/View/837291</guid>
    </item>
    <item>
      <title>Georgia Ports Authority Intermodal Planning</title>
      <link>https://trid.trb.org/View/835437</link>
      <description><![CDATA[The Georgia Ports Authority (GPA) anticipates that container throughput at the Garden City Terminal will grow significantly over the next 15 to 20 years. In fiscal year 2006 the facilities handled 2,032,000 TEUs (Twenty Foot Equivalent Units) of which approximately 20% was handled at the intermodal facilities. It is anticipated that the throughput will more than double in the planning horizon and the GPA is in the process of developing a Facilities Master Plan to meet the demand. One critical aspect of the facilities master plan is ensuring that the intermodal facilities are adequate to handle the projected growth, while maintaining the competitive environment that exists among the two serving railroads. The Garden City Terminal is currently served by Norfolk-Southern and CSX with both having on-dock facilities which eliminates drayage and marshalling costs. Currently, the GPA has separate distinct intermodal facilities with Norfolk-Southern servicing the James D. Mason Intermodal Container Transfer Faciility (ICTF) and CSX providing service on tracks that are oriented perpendicular to the berths in the container yard. The rails in the container yard present a significant challenge operationally and for densification. This paper provides a discussion of the overall planning process that was undertaken and the alternatives that were developed which included a combined ICTF facility in the Mason ICTF and/or independent separate facilities. The considerations that entered into the decision included connectivity to existing rails, advantages with regards to labor and equipment at a single facility, and overall costs. The final result was a decision to pursue separate independent facilities in the short-term and a combined facility in the long-term. The James D. Mason ICTF will consist of twelve working tracks (32,800 total feet) and 34,600 feet of storage track. The current facility consists of four 2,500 foot working tracks, one 2,500 foot runaround track, and two 2,500 foot storage tracks. The Chatham Yard ICTF will consist of three working tracks (6,300 total feet) and 10,000 feet of storage track. Additionally, each ICTF was planned to allow the GPA the flexibility to continue utilizing top picks to load and unload the rail cars into the near future and then to convert to rubber-tired gantries (RTG’s) or rail mounted gantries (RMG’s). A typical plan and cross-section of each ICTF are provided.]]></description>
      <pubDate>Fri, 05 Oct 2007 14:28:44 GMT</pubDate>
      <guid>https://trid.trb.org/View/835437</guid>
    </item>
    <item>
      <title>Map of the Month: The Road of the Century in 2007</title>
      <link>https://trid.trb.org/View/798926</link>
      <description><![CDATA[The Map of the Month features the New York Central System as it appeared in 1960 and in 2007. The railroad’s vast system was the largest Eastern trunk line in terms of route miles, and included the most famous passenger train, the 20th Century Limited, when it was assembled by Cornelius Vanderbilt. But by 1960, the railroad was fading, and recording far lower revenues. The map shows the railroad reaching as far west as East St. Louis, as far east as Boston, as far north as Mackinaw City, and as far south as Rainelle in West Virginia in 1960. In 1962 it encompassed 9,103 route-miles, while today it consists of 5,4209 route-miles.]]></description>
      <pubDate>Thu, 01 Mar 2007 13:18:57 GMT</pubDate>
      <guid>https://trid.trb.org/View/798926</guid>
    </item>
    <item>
      <title>Agreement Reached on 'Heartland Corridor' Tunnel Clearance Project</title>
      <link>https://trid.trb.org/View/795961</link>
      <description><![CDATA[This article focuses on an agreement to improve rail service in the Midwestern region of the U.S. Known as the “Heartland Corridor” project, it is intended to expand capacity of the rail lines serving the port of Norfolk on the East Coast to better serve the Great Lakes region. It is also a multi-modal effort, involving the use of stackable containers that can also travel by truck. A key step is to modify tracks and overcrossings to permit taller cars to pass through. That will permit twice as many containers, traveling in double-stacked configurations, to travel on the same number of trains as now. Additional projects involving rail-air connectors are also described.]]></description>
      <pubDate>Tue, 30 Jan 2007 13:27:01 GMT</pubDate>
      <guid>https://trid.trb.org/View/795961</guid>
    </item>
    <item>
      <title>It's All About Height: Tunnel and Trackwork Along NS' Heartland Corridor Will Allow a Direct Route Between Chicago and Norfolk, Va., for Auto Racks and Double-Stack Freight Cars</title>
      <link>https://trid.trb.org/View/794302</link>
      <description><![CDATA[This article discusses the opening of the Norfolk Southern (NS) railway's Heartland corridor for auto racks and double-stack freight cars, a project that will effectively shorten the trip from Hampton Roads to Chicago by 200 miles or about one day. Also, as the corridor can now be used for double stacks, the output for the line will be doubled upon its opening. This increased business will be a boon to local regions served on the journey. This is mainly due to the increasingly difficult time operators are having making single-stack trains operate cost effectively. Construction will begin for the corridor in the second quarter of 2007 and is hoped to be completed by 2009. A number of clearance-related issues will be solved for tunnels including further excavation by square notching, lowering the tracks, or raising the ceiling.]]></description>
      <pubDate>Thu, 30 Nov 2006 08:32:28 GMT</pubDate>
      <guid>https://trid.trb.org/View/794302</guid>
    </item>
    <item>
      <title>NS stacks corridor funding</title>
      <link>https://trid.trb.org/View/792294</link>
      <description><![CDATA[Subtitle: Doublestack clearance project to expand rail paths to accommodate heartland container movement.]]></description>
      <pubDate>Wed, 11 Oct 2006 11:24:38 GMT</pubDate>
      <guid>https://trid.trb.org/View/792294</guid>
    </item>
  </channel>
</rss>