<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Transport Research International Documentation (TRID)</title>
    <link>https://trid.trb.org/</link>
    <atom:link href="https://trid.trb.org/common/TRIS Suite/feeds/RSS.aspx?s=PHNlYXJjaD48cGFyYW1zPjxwYXJhbSBuYW1lPSJkYXRlaW4iIHZhbHVlPSJhbGwiIC8%2BPHBhcmFtIG5hbWU9InN1YmplY3Rsb2dpYyIgdmFsdWU9Im9yIiAvPjxwYXJhbSBuYW1lPSJ0ZXJtc2xvZ2ljIiB2YWx1ZT0ib3IiIC8%2BPHBhcmFtIG5hbWU9ImxvY2F0aW9uIiB2YWx1ZT0iMCIgLz48L3BhcmFtcz48ZmlsdGVycz48ZmlsdGVyIGZpZWxkPSJpbmRleHRlcm1zIiB2YWx1ZT0iJnF1b3Q7TWFpbnRlbmFuY2UgcGxhbm5pbmcmcXVvdDsiIG9yaWdpbmFsX3ZhbHVlPSImcXVvdDtNYWludGVuYW5jZSBwbGFubmluZyZxdW90OyIgLz48L2ZpbHRlcnM%2BPHJhbmdlcyAvPjxzb3J0cz48c29ydCBmaWVsZD0icHVibGlzaGVkIiBvcmRlcj0iZGVzYyIgLz48L3NvcnRzPjxwZXJzaXN0cz48cGVyc2lzdCBuYW1lPSJyYW5nZXR5cGUiIHZhbHVlPSJwdWJsaXNoZWRkYXRlIiAvPjwvcGVyc2lzdHM%2BPC9zZWFyY2g%2B" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Transport Research International Documentation (TRID)</title>
      <url>https://trid.trb.org/Images/PageHeader-wTitle.jpg</url>
      <link>https://trid.trb.org/</link>
    </image>
    <item>
      <title>Understanding the Planning Process for Nonroutine Railway Interventions in Switzerland</title>
      <link>https://trid.trb.org/View/2724608</link>
      <description><![CDATA[Railway infrastructure requires the execution of various nonroutine interventions over time, such as major track renewals, infrastructure upgrades, and technological improvements, to ensure continued safety and meet evolving transportation demands. The full planning process for these interventions spans multiple departments and planning phases, yet no single unit or individual typically holds a complete ownership or visibility over the full process. This fragmented understanding hampers efforts to improve planning efficiency and effectiveness, as innovation efforts targeting isolated planning phases or tasks often overlook their temporal and functional interdependencies. Tasks may rely on inputs from upstream tasks, must deliver outputs to downstream tasks, and are often initiated years in advance of intervention execution. This work provides a detailed description and discussion of the nonroutine intervention planning process within a Swiss railway organization. Using Business Process Model and Notation (BPMN) 2.0, the process is modeled across several key phases, including (1) network development; (2) development intervention planning; (3) maintenance intervention planning; (4) network coordination; (5) production planning; (6) project planning; and (7) capacity planning. The findings highlight the challenges in improving the planning process in railway organizations and point out several ways that research could be focused to improve the process that are best identified when understanding the full process. The areas of research identified are efforts to improve (1) integrated planning and process alignment; (2) process transparency and ownership; (3) interdisciplinary coordination and communication; and (4) decision support through operations research, machine learning, and digital tools such as building information modeling and geographic information systems. Beyond these identified areas of research, the described planning process is unique in its level of detail and, to the best of our knowledge, the first of its kind in the published literature, and it offers a foundational reference for academic research and practical improvement initiatives in similar contexts.]]></description>
      <pubDate>Thu, 22 Oct 2026 15:52:14 GMT</pubDate>
      <guid>https://trid.trb.org/View/2724608</guid>
    </item>
    <item>
      <title>Evolution of groundwater control in Sydney tunnels</title>
      <link>https://trid.trb.org/View/2563067</link>
      <description><![CDATA[The geological and hydrogeological conditions within the Sydney Basin are both unique and challenging. On the one hand, the Hawkesbury sandstone and Ashfield shale are ideal mediums for constructing tunnels, as it is possible to carve out large and complex underground shapes with minimal permanent support. On the other, groundwater flow is predominantly along open defects with water connectivity over tens to hundreds of metres, posing a challenge to control it despite the relatively low permeability of the sandstone rock mass. In addition, it is well known that the aggressive, iron-rich groundwater poses significant challenges for designers, constructors and asset owners alike. The drainage systems can be readily blocked by the sludge formed from bacteria growth when the groundwater comes into contact with the atmosphere. This process is a significant maintenance challenge for operators and asset owners. Furthermore, the service life of the sensitive equipment required to operate a tunnel safely can be compromised if the aggressive groundwater is not adequately managed and controlled, thus allowing it to drip or flow over the installations. This issue requires additional maintenance by the operator during the facility's service life.]]></description>
      <pubDate>Tue, 10 Jun 2025 14:50:31 GMT</pubDate>
      <guid>https://trid.trb.org/View/2563067</guid>
    </item>
    <item>
      <title>Road tunnel fan replacement project: transverse ventilation</title>
      <link>https://trid.trb.org/View/2563058</link>
      <description><![CDATA[The design life of tunnel ventilation fans is typically in the order of 30 to 50 years. Maintenance programs can help prolong the useful life of equipment but eventually the equipment needs to be replaced. Replacement of aged equipment affords an opportunity to upgrade the system and bring the tunnel into closer compliance with present day standards.]]></description>
      <pubDate>Tue, 10 Jun 2025 14:50:25 GMT</pubDate>
      <guid>https://trid.trb.org/View/2563058</guid>
    </item>
    <item>
      <title>Evaluating road serviceability using SERVQUAL: a user-centered approach</title>
      <link>https://trid.trb.org/View/2563038</link>
      <description><![CDATA[]]></description>
      <pubDate>Tue, 10 Jun 2025 14:46:56 GMT</pubDate>
      <guid>https://trid.trb.org/View/2563038</guid>
    </item>
    <item>
      <title>Reliability improvement of rolling stock planning with maintenance requirements for high-speed railway</title>
      <link>https://trid.trb.org/View/2517436</link>
      <description><![CDATA[The rolling stock planning problem is a key step in the high-speed railway transit planning process. When trip delays, railway departments may need to incur considerable additional costs for plan adjustments to quickly resume operations. Therefore, the authors consider the impact of trip delay probabilities during rolling stock planning, aiming to minimise the total travel cost and maximise plan robustness to enhance the reliability of plan execution. A space–time–state network is established to describe the operation of rolling stocks considering accumulated mileage and running time constraints for maintenance, representing the rolling stock planning problem as a mixed-integer nonlinear programming model. Then, an alternating direction method of multipliers (ADMM)-based decomposition mechanism that decomposes the model into a set of rolling stock route selection subproblems is introduced, where each subproblem is efficiently solved by a maintenance-constrained shortest path algorithm related to reliability. A set of different scale real-life cases based on trips managed by a depot in China are used to verify the effectiveness of the proposed model and algorithm. The results show that the ADMM considerably outperforms the traditional Lagrangian relaxation (LR) method. On a set of larger-scale cases, the proposed ADMM with enhancements obtains an optimality gap of 2.42 % on average. This result is substantially better than LR, which provides optimality gaps of 32.55 % on average. Finally, the model in this paper effectively enhances the probability of successful rolling stock route execution in trip delay scenarios, resulting in a rolling stock plan with improved reliability.]]></description>
      <pubDate>Fri, 23 May 2025 15:34:41 GMT</pubDate>
      <guid>https://trid.trb.org/View/2517436</guid>
    </item>
    <item>
      <title>Real-time railway perception and change detection</title>
      <link>https://trid.trb.org/View/2550868</link>
      <description><![CDATA[Track work inside the rail corridor is inherently high risk. Current practice often requires personnel to enter the danger zone to install safety and isolation equipment before works commence. This, coupled with the projected long-term increase in network utilisation, creates a scenario of foreseeable increased worker risk that should be addressed. This project, which was jointly funded by ACRI/NTRO and iMOVE and undertaken by the University of Newcastle, sought to develop enabling smart technologies that minimise human exposure to risk within the rail environment. It involved development of a general purpose sensing platform that can accurately determine its position within the rail corridor, detect changes and track dynamic objects, including people, as they operate within the space. The challenge was to develop a sensor that had the following capabilities: 1. Construct maps and localise within the rail corridor; 2. Detect and track objects of interest, such as personnel, within the corridor. Furthermore, it needed to be a lightweight, standalone solution that performed these functions in real time, with the capacity to be applied to a variety of platforms for fixed location and dynamic application. This paper presents the efforts on developing a solution to this problem. In the first project a prototype of the robotic trackside device was constructed. This served as the platform for the development of the real-time perception sensing capabilities undertaken in the second project.]]></description>
      <pubDate>Wed, 07 May 2025 13:46:47 GMT</pubDate>
      <guid>https://trid.trb.org/View/2550868</guid>
    </item>
    <item>
      <title>Characterising road roughness using accelerometric- and profilometric-based methods</title>
      <link>https://trid.trb.org/View/2521614</link>
      <description><![CDATA[This thesis explores how vehicle-mounted smartphones can monitor road pavement roughness, which is critical for safe driving and effective road maintenance. It examines and mitigates the impact of practical factors, like driving speed, vehicle type and smartphone mounting configuration, on measurement accuracy and consistency. The research develops methods of characterising roughness conditions and validates the proposed method against current commercial Apps and professional survey instruments. By crowdsourcing data from public vehicles, this study offers a more scalable and accessible way to monitor road pavement conditions.]]></description>
      <pubDate>Tue, 11 Mar 2025 13:45:27 GMT</pubDate>
      <guid>https://trid.trb.org/View/2521614</guid>
    </item>
    <item>
      <title>Evaluation of the Northern Sydney Freight Corridor: final report</title>
      <link>https://trid.trb.org/View/2521611</link>
      <description><![CDATA[Between 2012 and 2016, Transport for NSW (TfNSW) undertook upgrades of the northern Sydney rail freight corridor (NSFC) with the intention to improve freight and passenger rail operations along the corridor and address future capacity needs. The NSFC program of works was stage one of a broader vision to increase freight rail services through the metropolitan network. The program consisted of 4 separate infrastructure upgrades between Strathfield in the Sydney metropolitan area, and Broadmeadow near Newcastle. It included an underpass, additional tracks and passing loops. The NSFC primary objectives were to increase the number of freight paths during off-peak times, improve reliability, time in the network, and service offering to facilitate an increase in freight on rail. In addition, it was expected that these works would accommodate the expected increase in passenger services in line with population growth. This study examines the NSFC program of works, its place in the wider north coast rail corridor and ability to meet the stated program objectives in the original NSFC business case. The NSFC is considered in the broader context of the shared rail network including impacts from the introduction of the 2017 timetable. Key metrics used to understand the service reliability and service provision include on-time running, number of freight trains in the network and maintenance schedules. Consultation with stakeholders provided additional qualitative information rounding out the overall assessment of the NSFC. In addition to the primary objectives, this report examines the program’s ability to deliver other benefits including safety, sustainability and reduction in emissions and noise.]]></description>
      <pubDate>Tue, 11 Mar 2025 13:45:26 GMT</pubDate>
      <guid>https://trid.trb.org/View/2521611</guid>
    </item>
    <item>
      <title>Evaluating the robustness of MDSS maintenance forecasts using connected vehicle data</title>
      <link>https://trid.trb.org/View/2452407</link>
      <description><![CDATA[]]></description>
      <pubDate>Mon, 11 Nov 2024 14:11:09 GMT</pubDate>
      <guid>https://trid.trb.org/View/2452407</guid>
    </item>
    <item>
      <title>Guide to road tunnels part 4: retrofitting tunnels</title>
      <link>https://trid.trb.org/View/2438002</link>
      <description><![CDATA[Guide to Road Tunnels Part 4 provides guidance on the retrofitting of existing tunnels, including the need for refurbishment, the types of refurbishment and processes for developing project requirements. Guidance is provided on geometric considerations relating to cross-sections, traffic management functions including signs and lighting, fire and life safety including fire protection and evacuation, mechanical systems including pumps and lifts, electronic systems including power supply, energy efficiency and sustainability.]]></description>
      <pubDate>Wed, 09 Oct 2024 14:27:20 GMT</pubDate>
      <guid>https://trid.trb.org/View/2438002</guid>
    </item>
    <item>
      <title>Developing a road safety ratings tool for Local Governments</title>
      <link>https://trid.trb.org/View/2431370</link>
      <description><![CDATA[Over recent decades, diverse tools have been developed to support rating the safety of roads using different approaches. However, very few Local Governments in Western Australia use safety rating tools for their road networks. With funding from the Commonwealth Office of Road Safety, WALGA proposed to either adapt or develop a safety ratings tool specific to the Local Government sector. The project involved a literature review of existing tools, consultation with stakeholders, and pilot project and ultimately resulted in the adaptation of the International Road Assessment Program’s Star Rating methodology (iRAP, 2014), using a checklist and cross-section-based approach. WALGA developed both a paper-based and electronic tool. This tool will support Local Governments in Western Australia to be proactive in addressing safety on their networks, prioritize their works programs to address roads with significant safety deficiencies, provide a benchmark for safety, and generate clear and concise information on road safety to decision-makers.]]></description>
      <pubDate>Tue, 17 Sep 2024 14:46:39 GMT</pubDate>
      <guid>https://trid.trb.org/View/2431370</guid>
    </item>
    <item>
      <title>Adopting deep learning/computer vision in road asset management</title>
      <link>https://trid.trb.org/View/2404151</link>
      <description><![CDATA[Utilising Deep Learning (DL) and Computer Vision (CV) has been a hot topic in the road asset management industry in recent years. Building on prior Council work, Logan City Council (LCC) partnered with the University of Queensland (UQ) in 2019 to develop a scalable DL/CV process catered to the road asset management needs of Council. This collaboration has recently yielded a successful platform which allows LCC and other users to upload images of pavements, footpaths, road line-marking, and/or kerbs. The platform then identifies the relevant defects within those images. This allows Council to measure the condition performance of its assets and plan rehabilitation programs more rapidly and easily than was previously allowable. In addition, Council has also developed and tested a range of survey devices to allow for consistent data collection and processing. However, there is a lack of clear guidance on how to assess the success or the failure of DL/CV models especially in relation to the road asset management domain. This paper documents the development of the project including conception, data collection, image processing, data analysis, storage, and implementation. The paper also attempts to demonstrate a possible means of determining the success of these types of models. We will also highlight a case study demonstrating the holistic process Council has utilised with existing ArcGIS software to process, analyse, and scale the methodology across an entire asset network to produce a works program for footpath assets.]]></description>
      <pubDate>Thu, 18 Jul 2024 10:48:31 GMT</pubDate>
      <guid>https://trid.trb.org/View/2404151</guid>
    </item>
    <item>
      <title>Determining the carbon footprint of land transport infrastructure in New Zealand</title>
      <link>https://trid.trb.org/View/2404138</link>
      <description><![CDATA[This research aimed to improve the understanding of the embodied carbon impact of New Zealand’s land transport infrastructure. The need to reduce transport emissions is well documented in policy and research. However, focus has predominantly been on emissions generated by using infrastructure (enabled vehicle emissions) or project-specific quantification. This research project has sought to fill this gap by quantifying the estimated whole-of-life embodied emissions for land transport infrastructure. By developing profiles that represent a typical asset, this research was able to calculate the construction, maintenance, operation and end-of-life emissions associated with New Zealand’s transport infrastructure. It estimates that the upfront impact of the road network (including state highways, local roads and associated assets) is 37,250 ktCO2e (±10%) and continues to produce 890 ktCO2e (+10%, -14%) per year due to maintenance and operational emissions. The upfront impact of the rail network is 15,380 ktCO2e (±15%), and maintenance emissions for the rail network are estimated at 220 ktCO2e per year. Although these are significant quantities, upfront emissions represent a sunk cost that cannot be changed. Focus on emissions reduction in our land transport should be placed on how we maintain and optimise our current transport network and how we consider the embodied and enabled vehicle emissions in tandem in our investment decision making.]]></description>
      <pubDate>Thu, 18 Jul 2024 10:34:07 GMT</pubDate>
      <guid>https://trid.trb.org/View/2404138</guid>
    </item>
    <item>
      <title>Experiences from transitioning to predictive maintenance based on way side detector data</title>
      <link>https://trid.trb.org/View/2350592</link>
      <description><![CDATA[Predictive maintenance approaches have been proposed for a while, promising to optimize maintenance efforts and costs, but proving these effects in the field is tedious and time consuming and often leads to a disbelief in the technology. This presentation will therefore review 5 years of field experience in predictive decision support solutions to various railway stakeholders. Amongst others, the value creation in exemplified real-life cases show how wheel life can be extended by more than 20%, bearing failures can be reduced by more than 70% and wheel damages leading to disruption of operation can be prevented in >85% of the cases by implementing a predictive maintenance scheme. Using these proven outcomes from real-life cases, challenges and lessons learned will be used to show how value creation from predictive maintenance can be realized and how organizational and technical pit falls can be avoided. For that end, the presentation will focus on typical problem areas in heavy haul operations like wheel damages, bogie performance issues, bearing failures and wheel profile wear and how those can be effectively and accurately forecasted by fully automated predictive analytics algorithms operating on wayside data to appropriately providing decision support to different roles in an organization or automatically generating work orders. It will be clearly shown how validation and gaining trust by the users is realized. According to the experience of the authors it is possible to reach ratios beyond 90/10 of predictive to reactive maintenance actions, yielding unprecedented cost savings and benefits for reliable operation.]]></description>
      <pubDate>Fri, 08 Mar 2024 09:53:04 GMT</pubDate>
      <guid>https://trid.trb.org/View/2350592</guid>
    </item>
    <item>
      <title>Modelling of rolling stock asset performance using reliabiltiy block diagram</title>
      <link>https://trid.trb.org/View/2350520</link>
      <description><![CDATA[RAM (Reliability, Availability and Maintainability) is a term used in the Systems Engineering and Asset Management field that addresses uncertainty in engineering design and its asset performance. The word “Reliability” is a common word used in daily conversation to describe how a product, equipment or services perform and, the trustworthiness its performance over a period, in each operating environment and condition. Availability - ability of an item to be in a state to perform a required function under given conditions at a given instant of time or over a given time interval, assuming that the required external resources are provided (EN50126). Maintainability – ability to be maintained in, or restored to, a state to perform as required, under given conditions of use and maintenance. Availability is essentially a product of Reliability and Maintainability. It is found that a railway specific RAM database populated with RAM information extracted from field data is not readily available. Rail operators and project teams are required to develop their own models to understand their asset performance and to establish a baseline for forecasting and doing ‘what-if’ options analysis. This paper presents a case using Reliability Block Diagram to model and forecast the RAM performance of rolling stock and the application of such a model to decision making in maintenance strategy optimisations, design targets and provision of spares.]]></description>
      <pubDate>Fri, 08 Mar 2024 09:52:12 GMT</pubDate>
      <guid>https://trid.trb.org/View/2350520</guid>
    </item>
  </channel>
</rss>