<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Transport Research International Documentation (TRID)</title>
    <link>https://trid.trb.org/</link>
    <atom:link href="https://trid.trb.org/common/TRIS Suite/feeds/RSS.aspx?s=PHNlYXJjaD48cGFyYW1zPjxwYXJhbSBuYW1lPSJkYXRlaW4iIHZhbHVlPSJhbGwiIC8%2BPHBhcmFtIG5hbWU9InN1YmplY3Rsb2dpYyIgdmFsdWU9Im9yIiAvPjxwYXJhbSBuYW1lPSJ0ZXJtc2xvZ2ljIiB2YWx1ZT0ib3IiIC8%2BPHBhcmFtIG5hbWU9ImxvY2F0aW9uIiB2YWx1ZT0iMCIgLz48L3BhcmFtcz48ZmlsdGVycz48ZmlsdGVyIGZpZWxkPSJpbmRleHRlcm1zIiB2YWx1ZT0iJnF1b3Q7T3ZlcmZpbGxzJnF1b3Q7IiBvcmlnaW5hbF92YWx1ZT0iJnF1b3Q7T3ZlcmZpbGxzJnF1b3Q7IiAvPjwvZmlsdGVycz48cmFuZ2VzIC8%2BPHNvcnRzPjxzb3J0IGZpZWxkPSJwdWJsaXNoZWQiIG9yZGVyPSJkZXNjIiAvPjwvc29ydHM%2BPHBlcnNpc3RzPjxwZXJzaXN0IG5hbWU9InJhbmdldHlwZSIgdmFsdWU9InB1Ymxpc2hlZGRhdGUiIC8%2BPC9wZXJzaXN0cz48L3NlYXJjaD4%3D" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Transport Research International Documentation (TRID)</title>
      <url>https://trid.trb.org/Images/PageHeader-wTitle.jpg</url>
      <link>https://trid.trb.org/</link>
    </image>
    <item>
      <title>NEW REGS FOR UNDERGROUND STORAGE TANKS</title>
      <link>https://trid.trb.org/View/300796</link>
      <description><![CDATA[Final regulations for underground storage tanks recently went into effect.  A complete summary of requirements for installing new underground petroleum storage tanks along with compliance dates for affected transit agencies, tank filling procedures which would prevent spills and overfills, regulations for existing piping as well as financial responsibility for cleaning up leaks are listed.]]></description>
      <pubDate>Thu, 31 Aug 1989 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/300796</guid>
    </item>
    <item>
      <title>VARIATION OF STRESSES AND DEFORMATIONS IN A WEAK SOIL. PROCEEDINGS OF THE ELEVENTH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND FOUNDATION ENGINEERING, SAN FRANCISCO, 12-16 AUGUST 1985</title>
      <link>https://trid.trb.org/View/284589</link>
      <description><![CDATA[The paper presents results of instrumented in-situ tests of the behaviour of a weak sandy-clay soil under load. Sand layers of different thicknesses were placed above the weak soil to improve existing subsoil conditions.  The effect of the sand overfill on the behaviour of the weak subsoil was tested by using a load plate having the same size with the planned foundation bodies.  During the in-situ tests total and neutral stresses were measured with load cells and pore water pressure meters, respectively. For the measurement of settlements and soil layer displacements at different depth under the rigid load plate, an electro-inductive measuring instrument was used.  For the covering abstract of the conference see IRRD 287689.  (TRRL)]]></description>
      <pubDate>Thu, 31 Mar 1988 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/284589</guid>
    </item>
    <item>
      <title>RIGID PIPE PROOF TESTING UNDER EXCESS OVERFILLS WITH VARYING BACKFILL PARAMETERS SECTION VII VOLUME 2: FINITE ELEMENT ANALYSIS</title>
      <link>https://trid.trb.org/View/208452</link>
      <description><![CDATA[A finite element analysis of an 84-inch (2134-mm), reinforced concrete culvert, under approximately 190 ft (58 m) of embankment, made with full consideration for asymmetric canyon boundaries (see Section VII, Volume 1), is repeated, for the five zones previously analyzed, using a greatly simplified, symmetric, rectangular mesh.  The objective of this additional work, which was requested by the FHWA, is to establish comparisons between parameters significantly affecting culvert behavior, as predicted by the complex and simplified analyses.  Consideration of full boundary conditions requires pre-survey potential culvert sites, which may make such analyses prohibitively expensive and time-consuming.  The simplified analysis and comparative predictions are discussed in this volume. (Author)]]></description>
      <pubDate>Wed, 31 Jul 1985 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/208452</guid>
    </item>
    <item>
      <title>RIGID PIPE PROOF TESTING UNDER EXCESS OVERFILLS WITH VARYING BACKFILL PARAMETERS: SECTION VII VOLUME 3: NEUTRAL POINT ANALYSIS USING FINITE ELEMENT AND OBSERVED TRACTIONS</title>
      <link>https://trid.trb.org/View/208860</link>
      <description><![CDATA[Normal and tangential soil tractions acting on the external periphery of an 84-in (2134-mm), reinforced concrete pipe at Cross Canyon have been measured experimentally (see Section II) and derived by finite element analyses using: 1) a full mesh considering canyon wall boundary conditions and presence of a second pipe (see Section VII, Volume 1); and, 2) a greatly simplified, symmetrical, rectangular mesh with no second pipe (see Section VII, Volume 2).  In this volume are discussed results of inputting to the neutral point analysis (see Section V, Volume 1) tractions derived from field measurements and from the two levels of finite element analysis.  Various output parameters and maximum pipe stresses are compared among the three outputs for relative validity.  (Author)]]></description>
      <pubDate>Wed, 31 Jul 1985 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/208860</guid>
    </item>
    <item>
      <title>PROOFTESTING OF A STRUCTURAL PLATE PIPE WITH VARYING BEDDING AND BACKFILL PARAMETERS: SECTION II: ANALYSIS OF EXTERNAL LOADS</title>
      <link>https://trid.trb.org/View/208737</link>
      <description><![CDATA[Kyowa, Ormond and Cambridge Contact Soil Stressmeters were placed in an embankment and around the periphery of the 120-in.- (3.05-m-) diameter, 12-gauge, steel, structural plate, DB Culvert under a 188-ft (57-m) overfill. Transducers were scanned periodically as the embankment was constructed.  Normal tractions acting at the soil-culvert interface of eight zones of the pipe and tangential tractions at three of those zones have been plotted as functions of overfill.  Digitized stresses from these functions have been plotted as profiles at significant overfilles and time intervals after fill completion, and interpolated stresses have been established by cubic spline functions.  Plots of embankment stresses as functions of overfill are also included.  (FHWA)]]></description>
      <pubDate>Fri, 28 Sep 1984 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/208737</guid>
    </item>
    <item>
      <title>RIGID PIPE PROOFTESTING UNDER EXCESS OVERFILLS WITH VARYING BACKFILL PARAMETERS: SECTION I (VOLUME 6)-IMPLEMENTATION AS RECOMMENDED BY THE RESEARCH UNIT</title>
      <link>https://trid.trb.org/View/194125</link>
      <description><![CDATA[An 84-in. (2134-mm), reinforced concrete pipe culvert at Cross Canyon was heavily instrumented and tested at varying overfills ultimately reaching 180 ft (55 m). Quasitheoretical internal stresses derived from measured soil stresses and a computerized neutral point analysis were compared with measured values.  In this volume, four modes of failure described by Heger (28) are discussed and correlated with Cross Canyon results.  Effective density coefficients are suggested for possible use in concrete pipe design.  The paper recommends the use of Heger's design approach in conjunction with these coefficients and Caltrans' neutral point program (to be modified) for future pipe designs.  The profiles of effective density coefficients vary with construction mode, overfill and pipe stiffness.  Considerations used in establishing the profiles are provided.  A design procedure is described in Section I(6).3.  The Introduction, Historical Background and Description of Instrumentation for the Cross Canyon project will be found in Section I, Volume 1.  (FHWA)]]></description>
      <pubDate>Fri, 30 Mar 1984 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/194125</guid>
    </item>
    <item>
      <title>RIGID PIPE PROOF TESTING UNDER EXCESS OVERFILLS WITH VARYING BACKFILL PARAMETERS--SECTION VII (VOLUME 1): FINITE ELEMENT ANALYSIS</title>
      <link>https://trid.trb.org/View/186287</link>
      <description><![CDATA[Time-independent analyses of five of ten zones of a dummy reinforced concrete pipe at Cross Canyon are presented. All ten zones are characterized by "positive projection," seven in a narrow, vertical-sided trench with a projection ratio of about 0.4, two almost fully projecting and one in a close-fitting, U-shaped trench.  Two almost fully projecting zones (1 and 2) and four of the entrenched zones (4, 5, 6 and 7) were surmounted by ordinary embankment material.  Pipe segments in the U-shaped trench (Zone 3) were backfilled with a cement-treated slurry.  Three entrenched zones (8, 9 and 10) were surmounted with low modulus embankment inclusions (polystyrene plank, uncompacted soil and baled straw.) Eight zones (excluding 2 and 7) were heavily instrumented with peripheral soil stressmeters and internal strain-measuring transducers supplemented with external devices for measurement of shape and camber changes.  The embankment was instrumented with additional stressmeters and fluid settlement platforms at five zones (1, 4, 8, 9 and 10).  Instruments were monitored at frequent increments of overfill.  Two finite element computer codes (acronyms REA (for Reinforced Earth Analysis) and CANDE (for Culvert ANalysis and DEsign)) are adapted to special needs of pipe and asymmetrical boundary geometry and nonlinear, incremental, embankment construction.  Correlations are established between output results from the finite element codes and certain parameters obtained from the extensive instrumentation at five zones (1, 4, 8, 9 and 10). A second, instrumented, prestressed concrete, functional prototype in the same embankment has not been considered in the finite element analyses.  (FHWA)]]></description>
      <pubDate>Thu, 30 Jun 1983 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/186287</guid>
    </item>
    <item>
      <title>RIGID PIPE PROOFTESTING UNDER EXCESS OVERFILLS WITH VARYING BACKFILL PARAMETERS</title>
      <link>https://trid.trb.org/View/188760</link>
      <description><![CDATA[Field testing and analyses of two culverts at Cross Canyon are described: a 96-in. prestressed-concrete functioning culvert under 200 ft of overfill and an 84-in. reinforced-concrete dummy culvert under a maximum 183-ft overfill in the same embankment.  Eight instrumented and two noninstrumented zones in the dummy pipe and functional and unstressed control instrumented zones of the prestressed pipe were monitored during and after embankment construction to determine peripheral soil stresses, internal forces, and displacements.  Correlations were established between quasi-theoretical and measured parameters (moments, thrusts, displacements, distress, etc.) with a programmed analysis. Some standard analytical tools (settlement ratio, finite element) were checked against observations, and relative costs of different construction modes were considered. Heger's recently developed criteria were checked against actual appearances of two of four distress modes.  The programmed analysis was modified to predict these distress modes.  Profiles of effective-density coefficients were established for various construction modes.  The importance of designing for density distributions representative of contemplated construction models is emphasized.  (Author)]]></description>
      <pubDate>Tue, 31 May 1983 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/188760</guid>
    </item>
    <item>
      <title>REINFORCED-CONCRETE PIPE CULVERTS: DESIGN SUMMARY AND IMPLEMENTATION (DISCUSSION)</title>
      <link>https://trid.trb.org/View/188761</link>
      <description><![CDATA[Research at Mountainhouse Creek and Cross Canyon on reinforced concrete pipe culverts has confirmed the following: (a) loadings 140V:140H and 140V:42H are acceptable for Method A; (b) there is no effective-density increase after fill completion; (c) Method B (baled straw, polystyrene, or uncompacted material) performed well; (d) fill height versus soil pressure is approximately linear for Method A and nonlinear for Method B; (e) there is good correlation between theoretical (soil pressure) and experimental (strain) moments and excellent correlation of the three instrumentation planes placed 3 ft apart; (f) there is asymmetry of loading and moderate success by using Cambridge meters, which measured normal and shear forces on the culvert periphery; (g) adjusted peripheral pressures based on normal and shear forces did not change essential validity of use of normal forces only; and (h) D-loads based on three-edge bearing tests provide valid allowable design overfills.  Implementation of this research and future research considerations are discussed.  Projected cost savings are $400,000 annually.  (Author)]]></description>
      <pubDate>Tue, 31 May 1983 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/188761</guid>
    </item>
    <item>
      <title>RIGID PIPE PROOF TESTING UNDER EXCESS OVERFILLS WITH VARYING BACKFILL PARAMETERS: SECTION I (VOLUME 3): CONCLUSIONS AND RECOMMENDATIONS FOR IMPLEMENTATION-P/S PIPE</title>
      <link>https://trid.trb.org/View/179355</link>
      <description><![CDATA[A 96-in.-(2,438-mm-) diameter, prestressed concrete pipe with 23.5-in. (596-mm-) thick walls embedded under a 200-ft (61-m) highway embankment, was instrumented and tested under the load of the overburden.  An essentially unloaded control segment was also instrumented and subjected to a similar environment.  Equations were developed and a computerized neutral point program was written to assess prestressed pipe behavior, and quasi-theoretical and observed parameters were compared after prototype strains had been corrected for creep and shrinkage strains indicated by the control zone. Excellent correlations were obtained, especially at the higher overfills.  Recommendations are furnished for implementation.  (FHWA)]]></description>
      <pubDate>Tue, 30 Nov 1982 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/179355</guid>
    </item>
    <item>
      <title>PROOFTESTING OF A STRUCTURAL PLATE PIPE WITH VARYING BEDDING AND BACKFILL PARAMETERS: SECTION VI: ANALYSIS OF SETTLEMENTS</title>
      <link>https://trid.trb.org/View/179297</link>
      <description><![CDATA[Settlement data obtained from 64 fluid settlement platforms, plate and rod platforms, and leveling at four zones of the BD Culvert, 120-in. (3048-mm), structural plate pipe, under 188 ft. (57m) of overfill are employed in calculation of quasi-theoretical crown loads, using methods developed by Marston and Spangler. Soil stresses measured by stressmeters near the soil-pipe interface and in the embankment are compared with quasi-theoretical stresses assessed with calculated settlement ratios. Some very encourageing correlations were observed between quasi-theoretical and measured soil stresses; however, on the average, the quasi-theoretical stresses tended to be significantly larger than measured ones. This approach is probably more valuable for structural plate than for rigid pipes, when used in conjunction with Ring Compression Theory. (FHWA)]]></description>
      <pubDate>Mon, 30 Aug 1982 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/179297</guid>
    </item>
    <item>
      <title>RIGID PIPE PROOF TESTING UNDER EXCESS OVERFILLS WITH VARYING BACKFILL PARAMETERS: SECTION V (VOLUME 12): NEUTRAL POINT ANALYSIS, P/S PIPE, EXPERIMENTAL VERIFICATION</title>
      <link>https://trid.trb.org/View/179299</link>
      <description><![CDATA[The neutral point program described in Section V, Volume II, was used in conjuction with field data from a heavily instrumented, 96-in. (2438-mm), prestressed concrete pipe at Cross Canyon. Correlations between quasi-theoretical and measured moments and displacements were better than observed previously when the soil stresses from the Cambridge stressmeters were used, but were not as good for the Carlson meter stresses. (FHWA)]]></description>
      <pubDate>Mon, 30 Aug 1982 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/179299</guid>
    </item>
    <item>
      <title>RIGID PIPE PROOF TESTING UNDER EXCESS OVERFILLS WITH VARYING BACKFILL PARAMETERS: SECTION III (VOLUME 2): ANALYSIS OF INTERNAL STRAINS, P/S PIPE</title>
      <link>https://trid.trb.org/View/172374</link>
      <description><![CDATA[Strains measured by SR-4 gauges and mini-Carlson strainmeters are plotted on cross-sections of the wall of a 96-in. (2438-mm), prestressed concrete pipe at Cross Canyon for incremental overfills up to 200 ft (61m).  The strain cross-sections are fitted with regression parabolae (because of the large radius-to-wall thickness ratio, 2:1), ignoring an unrepresentative brush coat strain.  Equations are developed for experimental moments and thrusts in the pipe wall.  The Introduction, Historical Background, Project Description and Instrumentation will be found in Section I, Volume 1 of this report.  (FHWA)]]></description>
      <pubDate>Wed, 28 Apr 1982 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/172374</guid>
    </item>
    <item>
      <title>RIGID PIPE PROOF TESTING UNDER EXCESS OVERFILLS WITH VARYING BACKFILL PARAMETERS: SECTION V, (VOLUME 11): NEUTRAL POINT ANALYSIS, P/S PIPE, (THEORY AND COMPUTER CODE)</title>
      <link>https://trid.trb.org/View/172375</link>
      <description><![CDATA[Equations are developed to describe quantitatively the structural behavior of a prestressed concrete pipe with up to four wraps of prestressing steel and mortar brush coats.  These equations are incorporated in a computer code used to analyze such pipes for a variety of loading conditions, either as specified by a designer or resulting from field experiments.  In particular, the code will be used (in a subsequent volume, Section V, Volume 12) in the analysis of data for a prestressed concrete pipe at Cross Canyon.  This volume includes development of the theory, a sample problem check, a flow diagram and listing for the computer code, the input format and sample input and output.  (FHWA)]]></description>
      <pubDate>Wed, 28 Apr 1982 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/172375</guid>
    </item>
    <item>
      <title>RIGID PIPE PROOF TESTING UNDER EXCESS OVERFILLS WITH VARYING BACKFILL PARAMETERS: SECTION VI; ANALYSIS OF EMBANKMENT SETTLEMENTS</title>
      <link>https://trid.trb.org/View/165526</link>
      <description><![CDATA[Settlement data obtained from fluid settlement platforms, plate and rod settlement platforms and leveling at five zones of the Cross Canyon, 84-in. (2.13-m), reinforced concrete pipe, under 183 ft (55.8-m) of overfill, are employed in calculations of quasi-theoretical crown loads, using methods developed by Marston and Spangler. Soil stresses measured by stressmeters at the soil-pipe interface are compared with quasi-theoretical stresses assessed with settlement ratios obtained: 1) from the aforementioned data; and 2) using values published by Spangler based on statistical analyses of many past installations.  Zones 1 (horizontal, steel, tension struts), 4 (entrenched), and 8 (entrenched, with polystyrene plank overlayment) are treated as positive projecting; Zones 9 (uncompacted soil overlayment) and 10 (baled straw overlayment) are treated as negative projecting with induced trench construction.  Pipe in the five zones was Class II, with a 1,000D load rating.  The analysis failed completely to predict the non-linearity of the soil stress-overfill functions where recommended, handbook values of the settlement ratio were used, and predicted soil stresses were much higher than the measured ones.  Use of variable, measured ratios resulted in some improvement in crown soil stress predictions, providing some indications of non-linearity but, except in one (Zone 9) of the five cases, the quasi-theoretical soil stresses still greatly exceeded measured one.]]></description>
      <pubDate>Sat, 15 Aug 1981 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/165526</guid>
    </item>