<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Transport Research International Documentation (TRID)</title>
    <link>https://trid.trb.org/</link>
    <atom:link href="https://trid.trb.org/common/TRIS Suite/feeds/RSS.aspx?s=PHNlYXJjaD48cGFyYW1zPjxwYXJhbSBuYW1lPSJkYXRlaW4iIHZhbHVlPSJhbGwiIC8%2BPHBhcmFtIG5hbWU9InN1YmplY3Rsb2dpYyIgdmFsdWU9Im9yIiAvPjxwYXJhbSBuYW1lPSJ0ZXJtc2xvZ2ljIiB2YWx1ZT0ib3IiIC8%2BPHBhcmFtIG5hbWU9ImxvY2F0aW9uIiB2YWx1ZT0iMCIgLz48L3BhcmFtcz48ZmlsdGVycz48ZmlsdGVyIGZpZWxkPSJpbmRleHRlcm1zIiB2YWx1ZT0iJnF1b3Q7RGllc2VsIGNvbnRyb2wgc3lzdGVtcyZxdW90OyIgb3JpZ2luYWxfdmFsdWU9IiZxdW90O0RpZXNlbCBjb250cm9sIHN5c3RlbXMmcXVvdDsiIC8%2BPC9maWx0ZXJzPjxyYW5nZXMgLz48c29ydHM%2BPHNvcnQgZmllbGQ9InB1Ymxpc2hlZCIgb3JkZXI9ImRlc2MiIC8%2BPC9zb3J0cz48cGVyc2lzdHM%2BPHBlcnNpc3QgbmFtZT0icmFuZ2V0eXBlIiB2YWx1ZT0icHVibGlzaGVkZGF0ZSIgLz48L3BlcnNpc3RzPjwvc2VhcmNoPg%3D%3D" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Transport Research International Documentation (TRID)</title>
      <url>https://trid.trb.org/Images/PageHeader-wTitle.jpg</url>
      <link>https://trid.trb.org/</link>
    </image>
    <item>
      <title>DESIGN AND CONSTRUCTION OF 2000 TON CARGO VESSELS FOR A.M.I.</title>
      <link>https://trid.trb.org/View/155985</link>
      <description><![CDATA[These three 2000 DWT AMERICA-Class vessels operating in the Caribbean trade incorporate the most sophisticated technology available for their size - LOA 295.5 feet, beam 45 feet, draft 14.9 feet, bale cubic 128,000 with a service speed of 13.75 knots.  The main propulsion plant is Fairbanks Morse model 38TD 8-1/8, 12 cylinder opposed piston, two cycle, solid injection, non-reversing, air starting diesel.  The engine develops 3000 SHP at 750 RPM and burns marine gas oil.  The main engine can be controlled from both the wheelhouse and the engine room.  The vessel's engineers work "day work" from 0800 to 1700 hours.  The engine room is secured and considered to be unmanned during the "off daywork" hours.  The ship operates with a total of 10 men.  The paper provides a complete description of the main and auxiliary machinery, cargo handling equipment, power generation, ballast system, sewage disposal, air condition and refrigeration and automation as well as the trials and operational experience.  Five plans covering the general arrangement and machinery are included.]]></description>
      <pubDate>Wed, 08 Oct 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/155985</guid>
    </item>
    <item>
      <title>THE CONTROLS AND INSTRUMENTATION OF A SLOW SPEED DIESEL PROPULSION PLANT</title>
      <link>https://trid.trb.org/View/151851</link>
      <description><![CDATA[This paper introduces the ship to the reader and proceeds with a description of the machinery plant.  The control room and the console arrangement are then discussed, together with a brief approach to some of the aspects concerning zero-man-watch control.  In the chapter about controls, only those control functions and system philosophies not regularly seen aboard US flag vessels and which are imperative to the proper operation of a slow speed diesel propulsion unit are then described in this paper in further detail.]]></description>
      <pubDate>Tue, 16 Sep 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/151851</guid>
    </item>
    <item>
      <title>SULZER RLA90-AN IMMEDIATE SUCCESS</title>
      <link>https://trid.trb.org/View/148306</link>
      <description><![CDATA[The new Sulzer 6RLA90 prototype Diesel engine was recently demonstrated by Winterthur to an international gathering, together with a typical Sulzer bridge control system and a number of other engines.  Use of the new BBC Series 4 high-pressure ratio turbocharger and relief under-piston scavenge air pumping at above two-thirds load have made a significant reduction in the fuel consumption, which is now 142 g/bhp referred to ISO 3046/1 conditions.  The new engine is the largest of the long-stroke series and to enable it to be installed within limited headroom, the turbocharger module can be mounted off the engine to either end or above, in the casing.  The piston-rod seats on the top flat of the crosshead pin and is attached by means of a set bolt instead of by a threaded tail passing through the pin.  The 6RLA90 engine will be offered with from four to 12 cylinders.]]></description>
      <pubDate>Mon, 31 Mar 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/148306</guid>
    </item>
    <item>
      <title>AN ADVANCED DIESEL PLANT SIMULATOR FROM NORCONTROL</title>
      <link>https://trid.trb.org/View/147983</link>
      <description><![CDATA[Trondheim Maritime College now has in operation (in addition to a Norcontrol navigation/radar simulator) a Norcontrol Diesel-plant simulator of advanced design for training ships' engineers.  The simulator, which incorporates AutoChief II and DataChief III control and monitoring systems, embraces the main engine, auxiliary sets, pumps, compressor, boiler, turbogenerator, and fuel and lubricating-oil systems.  Its main purpose is to provide the student with a better understanding of modern plant and train him to take the correct action under normal, abnormal, and emergency conditions, and it can also assist in studies of a number of associated matters. The simulator's "engine control room" has a complete system for unmanned engine-room operation; the system is controlled by a digital which is also used for process modelling.  The essential element in the simulator is a set of dynamic process-and the behaviour of these can be altered by the instructor; over 400 individual faults can be inserted for the student to find and correct, and combinations of these can also be set.  The instructor can "freeze" the program and l console, which acts as the "bridge", to advise a student who may be in difficulty; the student is normally in "engine control room", but can visit the "engine room" when necessary. Among the features of the installation ability to simulate and mix the sounds of various items of engine-room machinery. The article gives a fairly detailed description of the installation at Trondheim Maritime College, and mentions that a Norcontrol simulator of the same type has been ordered by China.]]></description>
      <pubDate>Wed, 27 Feb 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/147983</guid>
    </item>
    <item>
      <title>VV-CCP ENGINE PLANT WITH SHAFT GENERATOR AND THE RESULTS OF TWO YEAR'S SERVICE</title>
      <link>https://trid.trb.org/View/143006</link>
      <description><![CDATA[An outline is given of the design of the Mitsubishi M.A.N. V52/55 ship propulsion plant developed as part of the energy-saving programme following the oil crisis of 1973. This plant comprises one set of Mitsubishi M.A.N. 12V52/55 and 14V52/55 medium-speed Diesel engines driving a controllable-pitch propeller and a shaft generator.  The control and maintenance systems are briefly described and the results of two years' service in LPG carriers are discussed.  Order from BSRA as No. 51,768.]]></description>
      <pubDate>Wed, 27 Feb 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/143006</guid>
    </item>
    <item>
      <title>THE KALDNES PROJECT-NEW PHILOSOPHY FOR REMOTE CONTROL OF MAIN PROPULSION MACHINERY</title>
      <link>https://trid.trb.org/View/144746</link>
      <description><![CDATA[The Kaldnes project is a bridge control system designed by Noratom-Norcontrol A/S for interfacing with slow/medium speed reversible Diesel engines as represented by the B & WK series.  This design of engine as delivered includes a comprehensive pneumatic manoeuvring system, a Woodward PG governor with additonal hydraulic amplifiers and hydraulic pump aggregate.  All this equipment was removed from the engine after delivery and replaced by a simplified mechanical manoeuvring system adapted to electronic control from the bridge, from the remote-control panel in the engine room or from an emergency manoeuvring stand.  Order from BSRA as No. 51,247.]]></description>
      <pubDate>Mon, 11 Feb 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/144746</guid>
    </item>
    <item>
      <title>DIESEL ENGINEERING TRAINING</title>
      <link>https://trid.trb.org/View/81415</link>
      <description><![CDATA[This paper describes the facilities and curriculum in marine diesel engineering at the United States Merchant Marine Academy.  The diesel laboratories have recently been modernized to include current training facilities for the medium and slow speed diesel engines used on ocean going merchant marine vessels.  The formal curriculum  for midshipmen presently includes two required courses for engineering majors on modern practices in the field of marine diesel engineering.  These two courses are followed by a recently expanded elective course in diesel engineering maintenance, operation, repair and control.  The Academy also offers a four and one-half week continuing education course in diesel engineering for marine engineers.  This course covers the latest state-of-the-art methodologies using the new diesel engineering training facilities.  The elective and the continuing education course include considerable practice (hands-on) experience with engine systems, maintenance, operation and trouble-shooting.  These courses are specifically designed to utilize the recently modernized facilities for medium and slow speed engines. Details regarding the marine diesel training facilities and curriculum are included in this paper.]]></description>
      <pubDate>Wed, 14 Mar 1979 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/81415</guid>
    </item>
    <item>
      <title>NEW SHIP TECHNICAL CONTROL SYSTEMS FOR THE ROYAL NORWEGIAN NAVY</title>
      <link>https://trid.trb.org/View/78164</link>
      <description><![CDATA[In 1975, the Royal Norwegian Navy entered an extensive new construction program.  In this connection it was necessary to decide the future policy of machinery control techniques. Working groups consisting of members from the Naval Material Command, Norway, and the Ship Research Institute of Norway have developed a new operational management system including Condition Monitoring concepts and Data Techniques.  The system consists of two basic parts, the shipborne system (SHIPCON) and the shorebased system (SHORCON).  The principles have up to now been applied to various projects, of which details of two are given.  The system is based upon micro-computer techniques and data storage on magnetic tape for Condition Monitoring--and Pattern Recognition processing ashore.  Efficient man-machine communication has been accomplished by means of alpha numeric displays and graphic color monitors.  For the first project it was necessary to keep weight and volume of the control equipment at an absolute minimum.  Due to high speed, light weight, 4-stroke engines, condition monitoring data cannot always be accomplished by direct measurements.  Methods for indirect establishment of parameter values are therefore introduced.  Additional data processing onboard is provided for special monitoring of certain short trend condition developments.  For the second project, graphic color screen monitoring methods are utilized for supervision of remote controlled systems.]]></description>
      <pubDate>Sat, 03 Feb 1979 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/78164</guid>
    </item>
    <item>
      <title>PROBLEMS IN THE EMERGENCY MANOEUVRING OF SUPERCHARGED DIESEL ENGINES DRIVING A FIXED-PITCH PROPELLER</title>
      <link>https://trid.trb.org/View/79067</link>
      <description><![CDATA[It is expected that, for economic reasons, large cargo ships will continue to be fitted with fixed-pitch propellers.  The problem of rapid reversing of a Diesel engine driving a fixed-pitch propeller is still unsolved, however, and the emergency, stopping of such ships is an associated problem. The Author, of MaK Maschinenbau GmbH, discusses methods of reducing head-reach in the emergency stopping of these ships.  A brief consideration of automatic remote engine-control, and of hull resistance (including the potential value of flaps and other external braking devices), is followed by a more detailed discussion on the influence of wake on stopping distance and on the effectiveness of the propeller as a brake.  The contribution that can be made by engine and shaft brakes is then examined (MaK have had good results, mainly from flywheel brakes, over the past ten years), and the behaviour of the turbocharged Diesel engine during emergency stopping and reversing is discussed in some detail.  Experience has shown that, at up to about 80% of the ship's service speed (i.e., up to about 12 to 13 knots), a flywheel or other brake can contribute to good manoeuvrability and is therefore useful in confined waters.  For speeds above this, another solution must be found.  Order from: BSRA as No. 48,860.]]></description>
      <pubDate>Wed, 27 Sep 1978 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/79067</guid>
    </item>
    <item>
      <title>DYNA--A NEW FAMILY OF CONTROLS</title>
      <link>https://trid.trb.org/View/68055</link>
      <description><![CDATA[The demand for precise prime mover controls has caused a re-evaluation of power control system design.  This has resulted in the identification of a number of critical requirements, which in turn has led to the development, design, and production of a family of power controls and associated systems known as DYNA.  A Proportional, Integral and Derivative (PID) control with fast speed of response has been developed and applied to a wide variety of engines.  It yields up to 30% improvement in transient performance over conventional PI isochronous governor systems.  The principal phases of design and development of the DYNA systems are presented, with comments on field experience and the resulting design experience.  Order from: BSRA as No. 47,542.]]></description>
      <pubDate>Tue, 14 Mar 1978 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/68055</guid>
    </item>
    <item>
      <title>TEMPERATURE CONTROL OF THE SUPERCHARGER AIR IN FERRY BOATS</title>
      <link>https://trid.trb.org/View/59714</link>
      <description><![CDATA[Three control circuits for supercharger air temperature control are considered: 1)single-loop control circuit with p-regulator, 2)single-loop control circuit with pi-regulator, and 3)control circuit which automatically corrects for "noise" parameters.]]></description>
      <pubDate>Wed, 09 Nov 1977 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/59714</guid>
    </item>
    <item>
      <title>EMERGENCY STOPPING DEVICE</title>
      <link>https://trid.trb.org/View/54703</link>
      <description><![CDATA[The device concerns an internal combustion engine, for example a diesel engine.  In case of sudden release of the load on the engine, an external cylinder will action the fuel pumps and cause the engine to shut down.]]></description>
      <pubDate>Sat, 29 Oct 1977 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/54703</guid>
    </item>
    <item>
      <title>CHARGE-AIR TEMPERATURE CONTROL IN FERRY SHIPS</title>
      <link>https://trid.trb.org/View/59032</link>
      <description><![CDATA[Ferries, which dispense with tugs at the terminal ports, must be able to vary their propulsion power between 10 and 100% very quickly, a requirement that introduces problems in the regulation of the charge-air temperature of the main Diesel engines.  Thermal overloading of the engine is possible, and, in particular, there is a danger of damage to the air cooler.  The Authors briefly describe a theoretical and experimental study for the selection of control arrangements for obviating these difficulties.  The study was made for the Rugen, A twin-screw ferry with four medium-speed engines.  The control requirements, and different methods of meeting them, are dicussed and compared under the headings:-- 1.  Determination of Characteristics for the Charge-Air Cooling Control System (i-- Detemination of static transfer behaviour; ii--Determination of transient response functions).  2. Charge-Air Temperature Regulation (i--Single-loop control system with proportional action controller; ii--Single-loop control system with proportional/integral action controller; iii--Control system with disturbance-variable feed-forward action).  3. Use of Electronic Controllers.  Test results showed that a disturbance-variable feed-forward control system fulfilled all the requirements for controlling the charge-air temperature in ferries, an advantageous practical solution being the non-steady electronic controller with steady feedback, in conjunction with an integrally operating final-control element.]]></description>
      <pubDate>Sat, 29 Oct 1977 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/59032</guid>
    </item>
    <item>
      <title>CONSIDERATIONS OF CONTROL OF GAS TURBINE AND DIESEL ENGINES WITH CONTROLLABLE PITCH PROPELLERS</title>
      <link>https://trid.trb.org/View/48129</link>
      <description><![CDATA[Consideration is given to the control of gas turbine and Diesel engine propulsion machinery when used in conjunction with controllable pitch propellers.  A sequencer technique is presented for achieving smooth operational mode changes in arrangements from a single propeller and two engines up to any number of propellers and engines.  A thrust computation concept for one engine driving two propellers is also described.  In this system, the control setting on one handle establishes the amount of thrust delivered by that propeller totally independently of the setting on the opposite control handle.]]></description>
      <pubDate>Wed, 27 Apr 1977 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/48129</guid>
    </item>
    <item>
      <title>SULZER INTRODUCE NEW AND UPRATED DIESEL ENGINES</title>
      <link>https://trid.trb.org/View/51978</link>
      <description><![CDATA[The article gives brief information on Sulzer RND and RND-M engines and on the SBC-7 electro-pneumatic remote control system, the STS telegraph system, and the SEDS (Sulzer Engine Diagnostic System), all three of which can be used with RND and RND-M engines.  Information is also given on increased power ratings for the company's A-type engines, and on the new RLA 56 engine.  Some RND-M engine orders and deliveries (they include the Clark/Sulzer RND 68M for the Austin & Pickersgill Mk. IV SD14 ships, and a 40,200-bhp IHI/Sulzer RND 90M for a container ship), and some deliveries of French- and Polish-built Z40/48 engines, are mentioned.]]></description>
      <pubDate>Wed, 27 Apr 1977 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/51978</guid>
    </item>
  </channel>
</rss>