<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Transport Research International Documentation (TRID)</title>
    <link>https://trid.trb.org/</link>
    <atom:link href="https://trid.trb.org/common/TRIS Suite/feeds/RSS.aspx?s=PHNlYXJjaD48cGFyYW1zPjxwYXJhbSBuYW1lPSJkYXRlaW4iIHZhbHVlPSJhbGwiIC8%2BPHBhcmFtIG5hbWU9InN1YmplY3Rsb2dpYyIgdmFsdWU9Im9yIiAvPjxwYXJhbSBuYW1lPSJ0ZXJtc2xvZ2ljIiB2YWx1ZT0ib3IiIC8%2BPHBhcmFtIG5hbWU9ImxvY2F0aW9uIiB2YWx1ZT0iMCIgLz48L3BhcmFtcz48ZmlsdGVycz48ZmlsdGVyIGZpZWxkPSJpbmRleHRlcm1zIiB2YWx1ZT0iJnF1b3Q7QmFpbGV5IGJyaWRnZXMmcXVvdDsiIG9yaWdpbmFsX3ZhbHVlPSImcXVvdDtCYWlsZXkgYnJpZGdlcyZxdW90OyIgLz48L2ZpbHRlcnM%2BPHJhbmdlcyAvPjxzb3J0cz48c29ydCBmaWVsZD0icHVibGlzaGVkIiBvcmRlcj0iZGVzYyIgLz48L3NvcnRzPjxwZXJzaXN0cz48cGVyc2lzdCBuYW1lPSJyYW5nZXR5cGUiIHZhbHVlPSJwdWJsaXNoZWRkYXRlIiAvPjwvcGVyc2lzdHM%2BPC9zZWFyY2g%2B" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Transport Research International Documentation (TRID)</title>
      <url>https://trid.trb.org/Images/PageHeader-wTitle.jpg</url>
      <link>https://trid.trb.org/</link>
    </image>
    <item>
      <title>Structural behaviour and failure modes of reinforced modular double truss bridge from full scale tests and 3D nonlinear numerical models</title>
      <link>https://trid.trb.org/View/2507769</link>
      <description><![CDATA[This paper presents an investigation into the structural behavior and failure modes of a reinforced full-scale double truss modular bridge subjected to full load moving truck and concentrated loads to failure. The field-testing program comprised operational loads of a specified truck positioned at ten different locations along the bridge span, followed concentrated loading to failure employing hydraulic jack to assess the bridge ultimate capacity and failure modes. Midspan deflections and axial strains of critical members were recorded and analyzed to deduce the bridge response characteristics under both service and ultimate load conditions. The measured responses were also used to validate the accuracy of three-dimensional finite element models and establish proper modeling techniques for the modular bridge. The finite element model is then used to conduct eigenvalue analyses of the bridge to evaluate its buckling behavior, and to perform both linear and nonlinear analyses to assess the bridge's response under service loads and its ultimate capacity under extreme loading. The numerical results closely aligned with the experimental results, validating the accuracy of the validated finite element model is employed to further explored the impact of reinforcing different parts of the bridge on its overall response and ultimate capacity. It is revealed that reinforcing 3/5 of the bridge's span significantly enhances both its stiffness and load capacity. Additionally, the calculated axial capacity of the top chord members is compared with the nominal axial compression capacity stipulated by the AASHTO standards.]]></description>
      <pubDate>Thu, 20 Mar 2025 09:49:12 GMT</pubDate>
      <guid>https://trid.trb.org/View/2507769</guid>
    </item>
    <item>
      <title>Experimental and analytical investigation for modular double truss bridge</title>
      <link>https://trid.trb.org/View/2440931</link>
      <description><![CDATA[This study presents a comprehensive investigation of a full-scale double-truss modular bridge spanning 45.7 m, with the primary objective of determining its load-carrying capacity. The research integrates both experimental and numerical analyses to examine the structural response of the bridge. In the experimental phase, the bridge was instrumented to monitor load, deflection, and strain responses throughout the loading process until failure. The numerical investigation involved the development of three different finite element models using beam-column elements, each considering different end conditions. Eigenvalue (buckling) and nonlinear analyses, accounting for material and geometrical nonlinearities, were conducted to explore the characteristic behavior of the bridge. The analyses revealed that modeling the truss girder with pinned-end conditions tends to be conservative, while rigid end conditions more accurately predict the inelastic limit load. Further investigation was conducted to enhance the buckling behavior of the top chord members. Additionally, the contribution of the deck as a load-resisting element and its effect on the truss behavior was explored. Furthermore, the study compares the axial capacities of the top chord members with the calculated AASHTO nominal axial compression capacity, providing valuable insights into the bridge's performance under load.]]></description>
      <pubDate>Wed, 30 Oct 2024 11:08:29 GMT</pubDate>
      <guid>https://trid.trb.org/View/2440931</guid>
    </item>
    <item>
      <title>Rebuilding Bailey Bridge to Bridge with Bascule Span – a Case Study</title>
      <link>https://trid.trb.org/View/2362015</link>
      <description><![CDATA[The structural analysis of a road foldable prefabricated steel Bailey- type bridge located over the Tuga River in Zelichowo, Poland is performed in this paper. Interesting and untypical bridge redevelopment performed made it possible to lift the middle foldable bridge span by approximately 4.0 m concerning the existing state. The paper begins with a survey of literature carried out on the investigations of foldable Bailey-type bridge subject matter. A description of the numerical modelling of foldable prefabricated bridges is performed. The comparison of the proof load test results with the FEM numerical model results has shown very good compatibility. This paper can provide scientists, engineers, and designers the basis for structural analysis in the field of foldable Bailey-type bridge constructions and numerical simulations.]]></description>
      <pubDate>Wed, 24 Apr 2024 09:34:19 GMT</pubDate>
      <guid>https://trid.trb.org/View/2362015</guid>
    </item>
    <item>
      <title>On the effectiveness of sparse regularization for structural damage diagnosis using dynamic strain measurements</title>
      <link>https://trid.trb.org/View/2341533</link>
      <description><![CDATA[Strain measurement is considered inherently suitable for structural health monitoring due to the ease of extracting damage-sensitive features. However, the need for pre- and post-damage feature extraction, especially in the absence of baseline data for aging infrastructures in service, has engendered skepticism concerning the practical efficacy of strain-based damage diagnosis. To address this, this study incorporates limited prior information on structures and sparse regularization to ascertain the locations and severities of structural damages based on dynamic strain response data. A model-assisted approach is presented, including the typical three-step process of damage feature extraction, finite element modeling, and analytical sensitivity-based model updating. In particular, sparse regularization technique aids in robustly identifying structural damage by tackling the hindrance encountered during model updating, involving ill-posedness and the impact of measurement and modeling uncertainties. The approach’s effectiveness is substantiated through a numerical investigation of a Bailey truss bridge model exposed to operating loads and an experiment with a steel beam equipped with an array of fiber Bragg grating sensors. The results demonstrate that using the proposed damage diagnosis approach enables accurately locating and quantifying element-level damages, even when significant modeling errors or a lack of baseline features exist.]]></description>
      <pubDate>Tue, 27 Feb 2024 16:03:14 GMT</pubDate>
      <guid>https://trid.trb.org/View/2341533</guid>
    </item>
    <item>
      <title>Laboratory Load Tests and Analysis of Bailey Bridge Segments</title>
      <link>https://trid.trb.org/View/1262852</link>
      <description><![CDATA[This paper presents the experimental work of two full-scale Bailey bridge segment load tests. The Bailey bridge segments were tested using a 130-t Universal Tester. The midspan deflections of panel assemblies were observed during the loading. Axial strains of several critical members were also measured. The axial capacities of the top chord members are compared with the calculated AASHTO nominal axial compression resistances. Experimental results are also compared with elastic and inelastic analyses using unsymmetrical sections. Test results show that (1) the inelastic lateral buckling occurred in compression chord members; (2) AASHTO-LRFD Article 6.9.4 generally predicts conservative results; (3) the effect of partial fixity of connections on the response of the structural model is insignificant and may be neglected in the analysis; and (4) a two-dimensional nonlinear inelastic analysis predicts a higher load-carrying capacity because it is not able to capture the out-of-plan stability behavior. It is recommended that Bailey-type bridges may be tested in their actual loading conditions to investigate their exact behavior, and more work is needed in the area of numerical modeling to simulate nonlinear inelastic lateral torsional behavior of the Bailey-type bridges. The CALTRANS is currently working closely with several prefabricated modular truss bridge manufacturers to develop the guidelines for temporary prefabricated modular steel truss bridges. Research findings presented in the paper are beneficial to this development.]]></description>
      <pubDate>Wed, 27 Nov 2013 13:36:53 GMT</pubDate>
      <guid>https://trid.trb.org/View/1262852</guid>
    </item>
    <item>
      <title>REPLACEMENT OF PONTESEI BRIDGE, ITALY</title>
      <link>https://trid.trb.org/View/742753</link>
      <description><![CDATA[Pontesei Dam is a major concrete dam built after World War II across the canyon of Mae Creek in the Italian Eastern Alps. Just upstream from the dam, a gully discharges water from steep mountains.  The only road serving the dam and the entire valley upstream of the dam runs along the mountainside and crosses the gully.  In 1959, an exceptionally rainy season caused a flood, which destroyed the bridge.  A temporary Bailey bridge was subsequently built by the army, but in 1990 it was decided to design a new bridge.  The main challenges posed to the designer included building the new deck and the abutments underneath the Bailey bridge without disputing traffic, hoisting the deck just to the bottom of the Bailey bridge, and finally substituting the new deck for the Bailey bridge in one day.  Other problems included the instability of the rock mass at the abutments and the gravitative convergence of the two sides of the gully.  This paper describes the design, construction, and testing of the bridge replacement and the bridge abutments.]]></description>
      <pubDate>Sat, 02 Oct 2004 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/742753</guid>
    </item>
    <item>
      <title>CZECH ARMY'S FAST BRIDGE WORK BASED ON 3D DESIGN SOFTWARE</title>
      <link>https://trid.trb.org/View/729325</link>
      <description><![CDATA[Czech Army engineers speeded replacement of bridges destroyed in this summer's floods by using 3D design software to create detailed drawings, lists of components and rehearse their construction in simulations. In all, 51 prefabricated Bailey-type bridges will have been installed. Sixteen of them required the simulation because the designs were complicated and involved numerous components. A student who was proficient in the AutoDesk 3D program happened to be part of the team and was instrumental in the simulation work.  The bridges will eventually be replaced by permanent structures.]]></description>
      <pubDate>Wed, 31 Dec 2003 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/729325</guid>
    </item>
    <item>
      <title>EXPERIMENTAL INVESTIGATIONS OF BAILEY BRIDGES</title>
      <link>https://trid.trb.org/View/663272</link>
      <description><![CDATA[This paper presents experimental investigations on Bailey bridges. Seven one-sixth scale models of the Bailey bridge trussed-steel frame were constructed in the laboratory and tested. All members of the scale models of steel frames are solid rectangular sections. Both ends of the members are fully welded. Some members of three selected specimens were removed to study their effects on degradation of limit loads. The cross-section areas of some members in two of the specimens were reduced to simulate the phenomenon of member corrosion. Two numerical methods, second-order elastic and inelastic analyses are used to predict the behavior of the steel frames. The responses determined by numerical methods are compared with test results. The scale model without lateral bracing members collapsed in the global lateral buckling mode at a very small limit load. The lateral bracing system of a planar frame is very important for preventing an early collapse and allows the ultimate strength to be reached.]]></description>
      <pubDate>Wed, 27 Aug 2003 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/663272</guid>
    </item>
    <item>
      <title>CONCRETE BRIDGES: INSPECTION, REPAIR, STRENGTHENING, TESTING AND LOAD CAPACITY EVALUATION</title>
      <link>https://trid.trb.org/View/460208</link>
      <description><![CDATA[The purpose of the guidelines and prescriptions given in this book is to assist the engineer in a simple and practical workman-like manner to:  inspect various concrete bridges in a highway network and establish their comprehensive inventory; rate the condition of each structure's elements; and provide appropriate information in order to be able to determine which structures require routine maintenance, which require major rehabilitation, and which require full or partial replacement. The book is organized in the following chapters:  (1) An Overview; (2) Maintenance Policy Principles; (3) Types of Distress Usually Observed in Various Types of Bridges; (4) Cracks in Concrete - Types, Causes and Repair; (5) Bridge Inspection; (6) Bridge Structure Repair; (7) Bridge-Structure Strengthening; (8) Strengthening of Concrete Bridges by External Prestressing; (9) Strengthening of Concrete Structures by Externally Bonded Steel Plates; (10) Rehabilitation of Bridge Foundations; (11) Structure Deficiencies, Remedies and Preventions - A Summary; (12) Bridge Monitoring; (13) Load Capacity Evaluation of Existing Bridges; (14) The Bailey Bridge - A pre-engineered ready-to-assemble standard-panel-system Bridge-Deck - particularly useful in Emergencies; (15) Diagnostic Testing; (16) Load Testing; and (17) Bridge Disasters - Some Reflections.  Appendices are:  (1) Maintenance of Timber Bridges; (2) Specifications for Certain Repair Items; (3) Metric Units and Conversion Factors; (4) Some General Data; (5) Properties of Geometric Sections and Shapes; and (6) Mathematical Data.  A list of references for additional reading is provided.]]></description>
      <pubDate>Fri, 26 Jul 1996 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/460208</guid>
    </item>
    <item>
      <title>MODULAR EVOLUTION</title>
      <link>https://trid.trb.org/View/390280</link>
      <description><![CDATA[It is described how a new generation of modular steel bridges may prove to be an effective alternative to conventional steel-and-concrete bridge construction.  To illustrate the potential of steel modular bridges, the article compares them with conventional bridges in terms of cost, performace, and speed of construction.  The largest cost savings is derived from erection; and modular bridges are effective in environmentally sensitive sites.  Also, modular bridges allow quick replacement of damaged components without paralyzing operations.  The article describes permanent bridges built for service lives of more than 30 years, alternative/temporary bridges, and emergency bridges. It is noted that a 'change in mind-set' as to how a bridge should be built is required of specifiers if modular bridges are to be used more often.  The article describes the Bailey Bridge, as well as prefabricated structures, and other unusual systems such as the novel robot crane technology to install modular bridges over beaches and wetlands, and the unusual post-tensioned tubular steel rigid-frame superstructure called a Tension Arch built in Morgantown, West Virginia.]]></description>
      <pubDate>Tue, 24 May 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/390280</guid>
    </item>
    <item>
      <title>KINETIC BRIDGES</title>
      <link>https://trid.trb.org/View/207263</link>
      <description><![CDATA[Presented in a state-of-the-art compilation of two types of kinetic bridges; relocatable and actively controlled. Relocatable bridge types range from the familiar Bailey Bridge to the new military Armored Vehicle Launch Bridge. The actively controlled bridge is an emerging type of structure whose behavior can be automatically controlled by a system of sensors, analyzers, and energizers.]]></description>
      <pubDate>Fri, 29 Mar 1985 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/207263</guid>
    </item>
    <item>
      <title>EAST MOORS VIADUCT GROWS BY SEGMENTS</title>
      <link>https://trid.trb.org/View/203262</link>
      <description><![CDATA[The article describes the progress in the construction of the 913 long concrete glued segmental bridge forming part of the 30 km Cardiff peripheral distributor road.  The 50 tonne pre-cast segments are now being erected, positioned, glued together and pre-stressed at the rate of some 10 units per week.  The viaduct, the longest of its type in the UK, is also the first to be constructed with a trapezoidal box section.  The 263 units used to form the 15-span, s-shaped in plan, are being pre-cast on site, largely for economic reasons.  Units are match-cast to ensure that they key together exactly when erected. Because of the carved geometry, no two segments are the same, and adjustments are made in the special hydraulically operated steel mould.  A railway crossing has been temporarilly spanned with a Bailey bridge allowing deck erection to continue without interfering with rail traffic.  (TRRL)]]></description>
      <pubDate>Thu, 28 Jun 1984 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/203262</guid>
    </item>
    <item>
      <title>LATERAL THINKING AT GLOUCESTER LEADS TO NEW GROUND RULES</title>
      <link>https://trid.trb.org/View/187693</link>
      <description><![CDATA[It was anticipated that severe settlement of the roughly 8M thick layer of alluvium in the River Severn flood plain would also lead to lateral forces acting on piles supporting a new crossing of the navigable section of the river carrying the A40 trunk road away from the city centre.  The embankment was formed two years early under an advanced contract.  Extensive soil tests checked the decrease in shear strength, and the lateral movement, but it was found to be well within the estimated 20mm allowed in the design. Hollow U shaped bridge abutments, formed half way up the end slope of the embankment were used. Very good agreement has been found between the reassessed rate of vertical settlement and values predicted, using data on load application, by a TRRL finite element computer program.  The viaduct structure has an in-situ prestressed cellular deck with pre-cast drop beams over the river. Because major plant and heavy falsework foundation loads could not be allowed on the flood plain, temporary work supports had to be separately piled and Bailey bridge sections have been used to support a complete span plus a 12M overlay. (Author/TRRL)]]></description>
      <pubDate>Thu, 31 Mar 1983 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/187693</guid>
    </item>
    <item>
      <title>BC BRIDGE MOVED AWAY BY LARGER REPLACEMENT</title>
      <link>https://trid.trb.org/View/173959</link>
      <description><![CDATA[When a new single-lane road bridge was quickly needed in British Columbia last summer, the old one was pushed away in a well planned operation by its bigger, stronger replacement.  Due to increasing traffic and larger logging trucks the ministry wanted a wider, tougher structure. Also, the work had to be done in the shortest possible time, but without disrupting pedestrian traffic.  The existing through-type Bailey bridge was replaced by an extra-wide, mid-deck Acrow  panel bridge, which meant that no work was needed at the abutments and piers.  The bridge was closed to traffic for only four weeks. (TRRL)]]></description>
      <pubDate>Fri, 29 Jan 1982 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/173959</guid>
    </item>
    <item>
      <title>THE BRIDGE OVER THE SEINE ALONG THE MELUN THROUGH-ROAD, THE FUTURE OF PRECAST GIRDER BRIDGES</title>
      <link>https://trid.trb.org/View/34725</link>
      <description><![CDATA[The Melun through-road, 2650m long, crosses the town from north to south.  It crosses the seine by means of a viaduct, original in its design and its appearance.  The structure has an overall length of 268m and an overall width of 24m; it comprises 7 42m or 34m spans.  The bearings are founded (1) on land and rest on cast-in-situ piles, and (2) in the river on large concrete masses which were built behind the protection of a cofferdam.  The piers consist of two shafts crowned by two precast rafters, which support the bearings of the deck girders and are positioned in a radiating way so that, in spite of the plane curvature of the structure, the girders of the same span are of the same length.  The deck, which is of the statically determinate multi-girder type, comprises light precast prestressed girders, launched by means of a small bailey bridge, and a cast-in-situ floor over a preslab.  A brief description is finally presented of the present state of the art of the construction of precast girder bridges. /TRRL/]]></description>
      <pubDate>Wed, 07 Apr 1976 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/34725</guid>
    </item>
  </channel>
</rss>