<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Transport Research International Documentation (TRID)</title>
    <link>https://trid.trb.org/</link>
    <atom:link href="https://trid.trb.org/common/TRIS Suite/feeds/RSS.aspx?s=PHNlYXJjaD48cGFyYW1zPjxwYXJhbSBuYW1lPSJkYXRlaW4iIHZhbHVlPSJhbGwiIC8%2BPHBhcmFtIG5hbWU9InN1YmplY3Rsb2dpYyIgdmFsdWU9Im9yIiAvPjxwYXJhbSBuYW1lPSJ0ZXJtc2xvZ2ljIiB2YWx1ZT0ib3IiIC8%2BPHBhcmFtIG5hbWU9ImxvY2F0aW9uIiB2YWx1ZT0iMCIgLz48L3BhcmFtcz48ZmlsdGVycz48ZmlsdGVyIGZpZWxkPSJpbmRleHRlcm1zIiB2YWx1ZT0iJnF1b3Q7QXJzZW5hbCAgKCBWaWVubmEsIEF1c3RyaWEgKSAmcXVvdDsiIG9yaWdpbmFsX3ZhbHVlPSImcXVvdDtBcnNlbmFsIChWaWVubmEsIEF1c3RyaWEpJnF1b3Q7IiAvPjwvZmlsdGVycz48cmFuZ2VzIC8%2BPHNvcnRzPjxzb3J0IGZpZWxkPSJwdWJsaXNoZWQiIG9yZGVyPSJkZXNjIiAvPjwvc29ydHM%2BPHBlcnNpc3RzPjxwZXJzaXN0IG5hbWU9InJhbmdldHlwZSIgdmFsdWU9InB1Ymxpc2hlZGRhdGUiIC8%2BPC9wZXJzaXN0cz48L3NlYXJjaD4%3D" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Transport Research International Documentation (TRID)</title>
      <url>https://trid.trb.org/Images/PageHeader-wTitle.jpg</url>
      <link>https://trid.trb.org/</link>
    </image>
    <item>
      <title>INFLUENCE OF GLAZED FROST AND HOAR FROST ON THE INSTALLATIONS AND ELECTRIC MOTIVE POWER UNITS. TESTS IN THE LOW TEMPERATURE CABINET</title>
      <link>https://trid.trb.org/View/15042</link>
      <description><![CDATA[This report contains the results of tests made in low temperature cabinets which have been carried out in 1962 in the Institute for Heating, Cooling and Fluid Dynamics (generally referred to as WKS, the initials of its German title) of the Austrian Federal Institution for Research and Experiments at Vienna and in the laboratory of the NS in Utrecht.  The object of the tests was to determine those of the large number of preventive agents which brought about test pieces, having successively been coated with the most electric traction.  The report describes the test installation developed for this purpose, in which tubular test pieces, having successively coated with the most diverse protective agents, have been subjected to icing under controlled conditions, resembling operating conditions as closely as possible.  The following preventive agents were thus tested: water-soluble liquids (for reducing the freezing point and relieving the surface tension), water-repellent liquids (for example oils with or without additives), greases and pastes, solid materials, paints and sheathing materials.  Subsequent to the icing of the test pieces, the quantity of the ice, the time necessary for the build-up of the ice and the shear forces required for removing the ice cover were measured. The results did not permit determination of one protective agent which either prevented the formation of ice or appreciably delayed it.  Significant differences were, however, established regarding the values of the adhesion of the ice to the tube.  Based on these results, which are of operational value, four preventive agents have been selected which should be used during the subsequent tests with complete pantographs in the dynamic test chamber of the WKS.  Furthermore, tests were made with tubes fitted with an adjustable heating device, by means of which icing was prevented.  Variation of some parameters made it possible to determine that heating output which just prevented icing of the tube.  This showed the need for repeating these tests at various wind velocities in the dynamic test chamber.  The tests and their results, collated in this report, form the basis of the tests which have meanwhile been carried out in the dynamic test chamber of the WKS and also that of future service tests and trials to be conducted on the systems of the Administrations.]]></description>
      <pubDate>Fri, 08 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15042</guid>
    </item>
    <item>
      <title>INFLUENCE OF GLAZED FROST AND HOAR FROST ON THE INSTALLATIONS AND ELECTRIC MOTIVE POWER UNITS. ICING PHENOMENA ON PANTOGRAPHS</title>
      <link>https://trid.trb.org/View/15043</link>
      <description><![CDATA[The tests made in low temperature cabinets, described in Interim Report No. 1, permitted to determine five protective agents which made it possible to reduce the adhesion of ice to a remarkable extent, although they were incapable of either preventing or appreciably delaying the formation of ice, with these protective agents, and an additional one, were conducted icing tests on fully assembled pantographs of three different types in the chamber for dynamic tests of the ORE test installation in the WKS at Vienna.  For this purpose, simple structures were erected in the dynamic test chamber for decreasing the airflow cross-section and for mounting the pantographs. As icing tests of such a nature were not previously carried out, the tests also represented a trial of the installation regarding its suitability for conducting experiments and its measuring technique.  Five of the protective agents referred to were applied to the parts of the pantographs which were to be protected against icing by the method tested in the low-temperature cabinet.  Icing tests were conducted at various wind velocities, during some of which the pantographs were set in motion.  The results of these tests fully confirmed the results obtained from the low-temperature cabinet tests.  It was, moreover, shown that pantographs were put out of action less by the icing of the joints than by an excessive increase in weight. Successful application of a protective agent for reducing the adhesion of the ice to such an extent that lowering of the pantograph and knocking it against its rests will make the ice fall off, serves to avoid this disturbance. Another protective agent, which was sprayed on the pantograph during the icing test, made it possible to prevent the formation of ice.  Heating of the pantograph tubes also served to prevent the formation of ice.  The results obtained so far justify the continuation of the tests and the improvements of the test methods.]]></description>
      <pubDate>Fri, 08 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15043</guid>
    </item>
    <item>
      <title>VIENNA ARSENAL TESTING STATION. TESTS CARRIED OUT ON PASSENGER COACHES IN THE VIENNA-ARSENAL TESTING STATION DURING 1963</title>
      <link>https://trid.trb.org/View/15080</link>
      <description><![CDATA[The present report sums up the results of the tests carried out in the Vienna Testing Station in 1963 on 15 passenger coaches belonging to various Administrations.  Vehicles of the following types were tested: Open central-gangway saloon and compartment coaches, couchette coaches, diesel rail cars and driving trailer coaches respectively, and also air-conditioned coaches of luxury trains.  Although the heating systems differed, it tried to carry out the same tests on all vehicles.  The tests covered first the determination of the pre-heating and pre-cooling periods and that of the energy required for these processes at various outside temperatures.  Subsequently, the quality of the regulation of the heating or air-conditioning equipment was tested and the energy consumption of the heating or air-conditioning equipment ascertained at various outside temperatures and speeds; comfort tests were also carried out.  The latter chiefly covered the temperature distribution and the air circulation velocities in the compartments.  Furthermore, cooling tests were made and also tests for ascertaining the resistance of the equipment to overheating and freezing.  A series of k value tests were made with the vehicles at different operating conditions and at various wind velocities.  These tests were supplemented by air leakage measurements using radio-active isotopes.  Finally, special tests were made to meet specific requests of various Administrations; these tests included noise measurements, pre-heating tests both with voltages which were either lower or higher than the nominal voltage and with low steam pressures.  The most important results obtained from these series of tests are given in tables and are graphically illustrated.  The extreme values of the results of the tests made in 1961 and 1962 are also plotted, for the sake of comparison, in the same figures.  Unfortunately, one series of regulating tests in particular could not be carried out under the same conditions as those applied during other tests, since the general programme of tests which was prepared by Committee B 30 was revised during the summer of 1963.  Tables and figures precede a summary of the different series of tests and a critical examination of the test results.]]></description>
      <pubDate>Fri, 08 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15080</guid>
    </item>
    <item>
      <title>VIENNA ARSENAL TESTING STATION. TESTS CARRIED OUT IN THE VIENNA ARSENAL TESTING STATION DURING 1964</title>
      <link>https://trid.trb.org/View/15081</link>
      <description><![CDATA[This report gives an account of the results of the tests to which 14 railway coaches were submitted in the Vienna Arsenal testing station in 1964.  The tests were conducted according to the principle laid down by Specialists Committee B 30 of the ORE.  Some of the railway coaches were subjected to special tests which differed slightly from those included in the usual programme of measurements. These tests are briefly described in Chapter 10 of this report.  Rolling stock of the following types were tested: Open central-gangway saloon and compartment coaches, couchette coaches, sleeping cars, diesel railcars, driving trailer coaches, air-conditioned coaches of a luxury train and dining cars.  Although the heating systems and air-conditioning systems differed appreciably, attempts were made to carry out comparable tests on all vehicles. Generally, tests were first carried out to determine the pre-heating and pre-cooling periods and the energy required for these processes at various outside temperatures.  The quality of the regulating devices, the distribution of the temperatures, and the energy consumption at various outside temperatures and speeds were subsequently measured. Comfort measurements provided information on the effects of temperature, air velocity and humidity on the passengers. Tests for ascertaining the resistance of freezing and excessive heating were conducted to investigate the strength of the material and the equipment of rolling stock exposed to various climates.  Time constants were determined and k values measured during cooling tests carried out to assess the insulation of coach bodies.  A special procedure, using a radioactive mixture of gas and air, was employed in some cases to ascertain the lack of tightness of coach bodies due to their construction and the proportion of intentional ventilation.  Various special tests were carried out at the request of some Administrations, such as measurements of the air quantities, the noise and the distribution of static pressure inside the vehicles, tests for ascertaining the rise in temperature of the main power cable at high loads and various outside temperatures, pre-heating and regulating tests at rather low or high voltages and at very low steam pressures. The most significant results are tabulated numerically and also shown diagrammatically.  Extreme values of specific tests conducted in 1961, 1962 and 1963 have, if necessary, been plotted to facilitate comparison.  Interpretations of the results obtained, in addition to remarks on the special tests carried out, conclude the report.]]></description>
      <pubDate>Fri, 08 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15081</guid>
    </item>
    <item>
      <title>CARRIAGE AND RAILCAR HEATING. REPORT ON THE TESTS CARRIED OUT IN THE VIENNA ARSENAL TESTING STATION DURING 1961</title>
      <link>https://trid.trb.org/View/15267</link>
      <description><![CDATA[This report sums up the results of the tests carried out in the Vienna Testing Station during 1961 on 9 railway coaches belonging to various Administrations.  Vehicles of the following types were tested: open central-gangway saloon coach, compartment coach, couchette coach, diesel railcar and air-conditioned TEE trailer coach.  Although the heating systems differed from each other the tests carried out were in many ways similar for all vehicles.  These tests were firstly concerned with the determination of the time required and the corresponding energy consumption for preheating from various outside temperatures.  Subsequently, the quality of the heat regulation was tested, the energy consumption necessary for heating at various speeds determined and comfort tests carried out which chiefly covered temperature distribution in the compartments and air circulation velocities.  In addition were carried out: cooling tests and tests appertaining to the resistance of the equipment to freezing and overheating; k-value tests supplemented by tests for measuring air leakage by means of radio-active isotopes introduced into a vehicle and Geiger-Muller counters; special tests to meet specific requests of various Administrations.  The most important results obtained in these series of tests are summarised and graphically illustrated.  It is regretted that it has not so far been possible to present in this first report an analysis and a comparison of the results of the different tests.  It is, however, intended to supplement accordingly the annual report for 1962.]]></description>
      <pubDate>Fri, 08 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15267</guid>
    </item>
    <item>
      <title>CARRIAGE AND RAILCAR HEATING. LIABILITY OF THE WATER SUPPLY SYSTEM OF RIC-COACHES TO FREEZING</title>
      <link>https://trid.trb.org/View/15268</link>
      <description><![CDATA[The prescriptions contained in RIC par. 43 and those in UIC- leaflet 563, both issued on 1st January 1962, deal with the conditions to be met by water supply systems for RIC-coaches in respect of their liability to freezing.  These prescriptions are not in accordance with each other and, in the opinion of the ORE B 30 Specialists Committee, they do not entirely allow either for the demands of the passengers nor for those pertaining to operation.  Therefore, a new text of the above prescriptions is suggested. The conditions to be fulfilled for the technical realisation of these proposals have been investigated.  During this it has become apparent that unheated passenger coaches may be left, without any heating of the water, in the open air for periods up to 12 hours, even at a temperature of -20 degrees C, when merely taking simple measures to ensure an adequate insulation.  As the measures to achieve this insulation can, generally speaking, be applied to coaches of older designs, it is suggested that from a certain date, still to be fixed, only such RIC-coaches should be accepted in which the water need not be drained when these coaches are left unheated in the open air for periods up to 12 hours.  The heating of the water for toilets and lavatories is then not required in order to protect the water tank against freezing.  It is however recommendable both for reasons connected with comfort and to prevent the formation of ice in the drain pipes of the water supply devices.  The methods of heating the water adopted so far are summarised.  A test procedure which can be applied in the Vienna testing installation is described; this will make it possible to determine, in future, whether passenger coaches meet the conditions for the water supply systems for toilets and lavatories as proposed in this report.  The theoretical cooling curves of the water at the various initial conditions occurring in practice were plotted by the Bundesbahn-Versuchsanstalt Minden (Westph.) by means of an analogue computer.  The original report of this research organisation has been appended to the report.  The theoretically determined cooling curves, reproduced in this report, will in due course be supplemented by results which have been obtained during practical tests made in the Vienna Test Installation.]]></description>
      <pubDate>Fri, 08 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15268</guid>
    </item>
    <item>
      <title>CARRIAGE AND RAILCAR HEATING. TESTS CARRIED OUT IN THE VIENNA ARSENAL TESTING STATION DURING 1962</title>
      <link>https://trid.trb.org/View/15269</link>
      <description><![CDATA[The present report is a summary of the results of tests carried out in the Vienna Testing Station in 1962 on 21 railway coaches belonging to various Administrations. Vehicles of the following types were tested: Open central- gangway saloon and compartment coaches, couchette coaches, diesel railcars or driving trailer coaches, and also air-conditioned coaches of luxury trains.  Although the heating systems differed, it was tried to carry out the same tests on all vehicles.  The tests covered first the determination of the pre-heating and pre-cooling periods and that of the energy required for these processes at various outside temperatures.  Subsequently, the quality of the regulation of the heating or air-conditioning equipment was tested and the energy consumption of the heating or air- conditioning equipments ascertained at various outside temperatures and speeds; comfort tests were also carried out.  The latter chiefly covered the temperature distribution and the air circulation velocities in the compartments.  Furthermore, cooling tests were made and also tests for ascertaining the resistance of the equipment to overheating and freezing.  A series of k value tests were made with the vehicles at different operating conditions and at various wind velocities.  These tests were supplemented by air leakage measurements, using radioactive isotopes. Finally, special tests, such as noise measurements, were made to meet specific requests of various Adminstrations. The most important results obtained from these series of tests are summarised by means of graphs.  For the purpose of comparison, the respective extreme values of the test results of 1961 have been added.  The tables and graphs are followed by a summary of the different series of tests and, in this connexion, the results of the different tests are reviewed.]]></description>
      <pubDate>Fri, 08 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15269</guid>
    </item>
    <item>
      <title>HEAT TRANSMISSION PHENOMENA IN REFRIGERATED VANS. VARIOUS METHODS USED FOR MEASURING THE HEAT TRANSMISSION COEFFICIENT K</title>
      <link>https://trid.trb.org/View/15328</link>
      <description><![CDATA[In 1962, the B77 Specialists Committee drew up a programme of work, visualizing three series of tests to be conducted in the Vienna-Arsenal test stations and at the Experimental Institute in Rome.  The object of these tests is to compare the methods applying internal heating and internal cooling, while determining for each of these the influence of the fundamental parameters involved in the measurement of the coefficient K.  The first Interim Report forming the subject of the following test contains a description of the procedures used by each of the test stations and the error committed during the measurement of the coefficient K according to the procedure applied.  The tests on the internal cooling method were conducted by the Vienna-Arsenal test stations and by the Experimental Institute in Rome according to a procedure peculiar to each of them. Including all the precautions taken, the measuring errors are 8.7 and 9.7% respectively at a limit of 10% authorized by the Agreement.  The error is 3.2% for the method applying internal heating while using comparable measuring instruments.  Though therefore the method of internal cooling has been retained by the Agreement of the Economic Commission for Europe owing to certain advantages which it affords, it nevertheless presents some difficulties: need for a more complex equipment and for a very careful measuring process enabling adequate precision to be achieved and which, in spite of this, continues to be of a practical nature.]]></description>
      <pubDate>Fri, 08 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15328</guid>
    </item>
    <item>
      <title>HEAT TRANSMISSION PHENOMENA IN REFRIGERATOR WAGONS. RECOMMENDED METHOD FOR THE MEASUREMENT OF THE K VALUE OF REFRIGERATOR WAGONS</title>
      <link>https://trid.trb.org/View/15329</link>
      <description><![CDATA[In 1962, the B77 Specialists Committee drew up a Programme of Work, visualizing three series of tests to be conducted in the Vienna-Arsenal testing station and at the Experimental Institute in Rome.  The object of these tests was to compare the methods applying internal heating and internal cooling, while determining for each of these the influence of the fundamental parameters involved in the measurement of the coefficient K.  The first Interim Report dated June 1964 described various methods used for measuring the heat transfer coefficient K of insulated and refrigerator vans and explains, on one hand, the maximum error committed in the measurement of this coefficient according to the method used and, on the other hand, the difficulties presented by the method of inner cooling, recommended by the ECE due to certain advantages which cannot yet be defined in a precise manner.  With this in mind, the second Interim Report, (this report) describes the method which is considered the most practical, for measuring with sufficient accuracy the coefficient K of insulated and refrigerator vans by the method of inner cooling.  It deals with three methods used for measuring the heat transmission coefficient K of insulated and refrigerator vans by the method of inner cooling and describes the precautions that must be taken in each case. The method of the cooling group placed inside the van is recommended as the best method because it is the most practical and the most accurate.]]></description>
      <pubDate>Fri, 08 Jul 1994 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15329</guid>
    </item>
    <item>
      <title>ELECTRONICS TEST STATION (VIENNA-ARSENAL). ACTIVITIES OF THE ELECTRONICS TEST STATION DURING 1979 (FROM 1.1.1979 UNTIL 31.12.1979)</title>
      <link>https://trid.trb.org/View/15570</link>
      <description><![CDATA[This report represents a short general view of the activities of the Electronics Test Station at Vienna Arsenal in the fields of data transmission and modem testing and in particular electronic operating safety for automatic warning systems for track gangs and finally structural studies of telephone networks.]]></description>
      <pubDate>Thu, 09 Jul 1981 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15570</guid>
    </item>
    <item>
      <title>VIENNA ARSENAL VEHICLE TESTING STATION. REPORT ON THE ACTIVITIES OF THE VIENNA ARSENAL VEHICLE TESTING STATION DURING 1979</title>
      <link>https://trid.trb.org/View/15563</link>
      <description><![CDATA[This report briefly describes the activities of the Vienna Arsenal vehicle testing station during 1979. Passenger coaches and tractive units were tested for the owner railways and for manufacturers.  Two series of tests were also carried out as a continuation of the work of the ORE B 26 Specialists Committee.  In addition to a series of ATP tests, investigations were also undertaken for third parties on an auxiliary power unit, and cold starting tests were carried out on motor car engines.]]></description>
      <pubDate>Fri, 06 Feb 1981 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15563</guid>
    </item>
    <item>
      <title>ELECTRONIC TEST INSTALLATION (VIENNA-ARSENAL). WORK CARRIED OUT AT THE ELECTRONICS TEST INSTALLATION IN 1978 (FROM 1ST JANUARY 1978 TO 31ST DECEMBER 1978)</title>
      <link>https://trid.trb.org/View/15537</link>
      <description><![CDATA[This report presents summary information concerning the activities of the ETI during 1978 in the fields of data transmission, safety analysis of electric track gang warning systems, transmission of information through train wires (public address lines) and measurements of interference caused by three-phase traction.]]></description>
      <pubDate>Wed, 27 Aug 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15537</guid>
    </item>
    <item>
      <title>VIENNA ARSENAL VEHICLE TESTING STATION. REPORT ON THE ACTIVITIES OF THE VIENNA ARSENAL VEHICLE TESTING STATION IN THE YEAR 1978</title>
      <link>https://trid.trb.org/View/15528</link>
      <description><![CDATA[The present report briefly describes the activities of the Vienna Arsenal Vehicle Testing Station during the year 1978. Passenger coaches and tractive units from various countries were tested for the owning Railways and manufacturers.  Wind tunnel tests were conducted on two bridge models and also climatic tests on a motor-car and on a helicopter.  A series of ATP tests on transport means for easily perishable food products was carried out.  The development and construction of an experimental cell for studying track structures under different conditions was completed.  The work on the standard programme for testing the performance of disc brakes under Winter conditions is being continued.]]></description>
      <pubDate>Wed, 21 May 1980 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15528</guid>
    </item>
    <item>
      <title>ELECTRONIC TEST INSTALLATION (VIENNA ARSENAL). WORK DONE AT THE ELECTRONIC TEST INSTALLATION IN THE YEAR OF 1976/1977 (FROM 1ST SEPTEMBER 1976 TO 31ST DECEMBER 1977)</title>
      <link>https://trid.trb.org/View/15511</link>
      <description><![CDATA[This is the tenth annual report on the work done by the Research and Test Institute for Electronics in Railway Technology (abbreviated designation: Electronic Test Installation), which is operated in Vienna jointly by the Office for Research and Experiments (ORE) of the International Union of Railways (UIC) and the Austrian Federal Research and Test Institute Arsenal (BVFA).  In this year, the tenth year since the opening of the installation, the agreement of co-operation between the institutions referred to above was superseded by a new agreement with a life of five years.  For this reason a technical meeting of several days duration was held.  In the course of the year under review, the Electronic Test Installation was engaged in work on the following subjects:  1.  Data transmission technique.  Preparatory tests were made by the A 145 Specialists Committee for five European Railways concerning the HERMES data transmission network planned by UIC at 9600 bits/s on railway circuits.  As part of these tests three different modems were subjected to type tests.  2. Work done for the A 103 Specialists Committee.  On the basis of the report on the interference analyses made by the Electronic Test Installation, which had been prepared during the preceding financial year, the A 103 Specialists Committee produced the specifications of performance for equipment used to test the transmission of information in a train. Preliminary studies were made to measure such transmission systems and to assess their quality.  3. Safety tests of automatic warning installations for track maintenance gangs for the A 124 Specialists Committee.  After the investigations begun in the preceding year, two other automatic warning installations for track maintenance gangs were tested for their reliable operating.  4.  Other railway orders.  Interference with telecommunication circuits by various modes of traction was measured, on behalf of NS on their system.]]></description>
      <pubDate>Tue, 31 Jul 1979 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15511</guid>
    </item>
    <item>
      <title>VIENNA ARSENAL VEHICLE TESTING STATION. REPORT ON THE ACTIVITIES OF THE VIENNA ARSENAL VEHICLE TESTING STATION IN THE YEAR 1977</title>
      <link>https://trid.trb.org/View/15483</link>
      <description><![CDATA[The present report briefly describes the activities of the Vehicle Testing Station Vienna Arsenal during the year 1977. Vehicles such as coaches and tractive vehicles from different countries were tested from the owner railways and manufacturers.  Furthermore, a series of ATP tests for transport materials for easily perishable food products were carried out for the first time.  The development and construction of a track measurement cell for measuring the track in different conditions is almost completed.  The work on the standard programme for testing the behaviour of disc brakes in winter conditions is being continued.  A model test for simulating a sand-storm for testing the functioning of units and vehicles in special conditions, as they occur in different countries, proved that practical studies at a more extended scale are possible.]]></description>
      <pubDate>Tue, 27 Feb 1979 00:00:00 GMT</pubDate>
      <guid>https://trid.trb.org/View/15483</guid>
    </item>
  </channel>
</rss>