FIRST APPLICATION OF PRECAST CONSTRUCTION WITHOUT FALSEWORK IN GERMANY /IN GERMAN/
THE DESIGN AND CONSTRUCTION BY HOCHTIEF AG OF THE NEW BRIDGE OVER THE LECH AT EPFACH ARE DESCRIBED. BUILDING OF THE SUPERSTRUCTURE, INCLUDING MANUFACTURE OF THE PRECAST SECTIONS AND THEIR ASSEMBLY, IS OUTLINED. THIS WAS THE FIRST BRIDGE TO BE BUILT IN GERMANY USING THE METHOD OF CONSTRUCTION WITHOUT FALSEWORK. /RRL/
-
Supplemental Notes:
- Vol 45, No 10, PP 337-41, 5 FIG, 7 PHOT, 2 REF
-
Corporate Authors:
Ernst (Wilhelm) and Sohn
Hohenzollerdamm 170
1001 Berlin 31, Germany -
Authors:
- Hager, G
- Publication Date: 1968-10
Media Info
-
Serial:
- Bautechnik
- Publisher: Ernst (Wilhelm) and Sohn
Subject/Index Terms
- TRT Terms: Bridge design; Bridge superstructures; Bridges; Construction management; Precast concrete; Structural design
- Subject Areas: Bridges and other structures; Construction; Highways;
Filing Info
- Accession Number: 00215033
- Record Type: Publication
- Source Agency: Road Research Laboratory /UK
- Files: TRIS
- Created Date: May 19 1970 12:00AM