SUMMARY OF NEAR TERM ENGINEERING AND DEVELOPMENT PROGRAM PLANS FOR GROUND BASED SEPARATION ASSURANCE

The report summarizes the several engineering and development activities directly involved with the development of automation capabilities to aid the separation assurance function of the ground based Air Traffic Control (ATC) system. Separation assurance capabilities for the operational NAS En Route Stage A System are being developed in E and D Program 12 - En Route Control. The analogous development work for terminal systems, ARTS 3 and ARTS 2, is being accomplished in Program 14 - Terminal/Tower Control. The initial design of future capabilities, such as Intermittent Positive Control for Phase 2 of the Upgraded Third Generation ATC System (which depends upon the surveillance/communications provided by the Discrete Address Beacon System), is being performed under E and D Program 01 - Systems. (Modified author abstract)

  • Corporate Authors:

    Federal Aviation Administration

    Systems Engineering Management, 800 Independence Avenue, SW
    Washington, DC  United States  20591
  • Publication Date: 1973-3

Media Info

  • Pagination: 26 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00047308
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: FAA-EM-73-7 Sum Rpt
  • Files: NTIS, USDOT
  • Created Date: Sep 27 1973 12:00AM