Evaluation of I-80 Long-Life Corridor Costs
This technical memorandum summarizes the analysis performed in evaluating Long-Life Pavement Rehabilitation Strategies (LLPRS) cost. This study is part of the effort to develop an Integrated Pavement Strategy Decision Support System to allow engineers to analyze efficient allocation of financial resources when planning pavement projects. This study analyzed cost performances of a long-life pavement project on Interstate 80 between Nevada County (Truckee) from east of the Fireboard undercrossing to the west end of the Truckee River Bridge. The analysis performed determined that Contract Change Orders and the delays caused by them are the source of the cost overrun and the difference between the estimated and actual costs.
- Record URL:
-
-
Corporate Authors:
University of California, Berkeley
Institute of Transportation Studies, Pavement Research Center
1353 South 46th Street
Richmond, CA United States 94804University of California, Davis
Pavement Research Center, One Shields Avenue
Davis, CA United States 95616 -
Authors:
- Santero, Nicholas J
- Nokes, W A
- Harvey, John
- Publication Date: 2005-6
Language
- English
Media Info
- Media Type: Print
- Features: Appendices; Figures; Tables;
- Pagination: 29p
-
Serial:
- University of California, Davis. Institute of Transportation Studies. Research report
- Publisher: University of California, Davis
Subject/Index Terms
- TRT Terms: Bids; Contracts; Cost allocation; Cost estimating; Costs; Decision support systems; Indirect costs; Pavement maintenance; Rehabilitation
- Identifier Terms: Interstate 80
- Subject Areas: Economics; Highways; I10: Economics and Administration;
Filing Info
- Accession Number: 01152717
- Record Type: Publication
- Source Agency: UC Berkeley Transportation Library
- Report/Paper Numbers: UCPRC-TM-2005-04
- Files: BTRIS, TRIS
- Created Date: Mar 18 2010 10:29AM