4-step to AB - a gradual transition strategy

Activity-Based (AB) models represent a new modelling paradigm that might look totally incompatible with the 4-step structure. However, there can be a realistic plan of gradual transition that was adopted by several local authorities in the US. This was based on principles which are described in detail in this paper. Also described are the individual stages of the gradual transition strategy, along with a description of the related benefits, and estimates of time and cost for each one.

Language

  • English

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01121282
  • Record Type: Publication
  • Source Agency: TRL
  • Files: ITRD
  • Created Date: Feb 5 2009 8:30AM