FIRST U.S.-BUILT EL PASO LNG SHIP DELIVERED BY NEWPORT NEWS
The El Paso Southern is a tanker which has an overall length of 848.5 ft, a beam of 135 ft, a gross tonnage of 58,800, a capacity of 126,020 cubic meters and a service speed of 18.5 knots. Centralized control of the propulsion system is maintained from the engine room. Cargo handling and monitoring occurs in a cargo control room. Overall command and navigational control is centered in the wheel house.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/07325460
-
Corporate Authors:
Simmons-Boardman Publishing Corporation
P.O. Box 530
Bristol, CT United States 06010 - Publication Date: 1978-10
Media Info
- Pagination: p. 29-33
-
Serial:
- Marine Engineering/Log
- Volume: 83
- Issue Number: 11
- Publisher: New York: Simmons-Boardman Publishing Corp.
- ISSN: 0732-5460
Subject/Index Terms
- TRT Terms: Cargo handling; Chemical tankers; Control; Design; Electric power plants; Liquefied gases; Liquefied natural gas; Monitoring; Ships; Tankers; Vehicle design
- Uncontrolled Terms: Ship design
- Old TRIS Terms: Cargo monitoring; Power plant control; Power plant monitoring
- Subject Areas: Design; Freight Transportation; Marine Transportation; Vehicles and Equipment;
Filing Info
- Accession Number: 00194945
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Jul 31 1979 12:00AM