TECHNICAL-ECONOMICAL INVESTIGATION OF DREDGING COSTS OF HOPPER SUCTION DREDGERS

Following a description of the dredging process and the total working cycle, some of the parameters based on analysis of 93 existing dredgers are given and made available for calculation by formula. Time cycles and cost factors are calculated in relation to distance between dredging and discharge location and in relation to total working time of the dredger. Order from NSFI as No. 16579.

  • Corporate Authors:

    Schroedter (C) and Company

    Stubbenhuk 10
    Hamburg 11,   Germany 
  • Authors:
    • Gaethje, H
    • Wiemann, V
  • Publication Date: 1978

Media Info

  • Features: References;
  • Pagination: p. 1784
  • Serial:
    • HANSA
    • Volume: 115
    • Issue Number: 21
    • Publisher: Deutsche Bahn AG

Subject/Index Terms

Filing Info

  • Accession Number: 00194357
  • Record Type: Publication
  • Source Agency: Ship Research Institute of Norway
  • Files: TRIS
  • Created Date: May 26 1979 12:00AM