PROBLEMS IN THE DESIGN OF TUNNELS
PROBLEME BEI DER PROJEKTIERUNG VON TUNNELN
numerous problems arising from: preparation of specifications for the setting up and design of projects; definition of the outline of the cross section, clearance dimensions and harmonisation of the normal tunnel cross section with the normal cross section in open sections; consideration of the geological and constructional aspects in the choice of access spacings; investigation of traffic a single or double tunnel structure; the choice of cross construction time; and specifications studies, which result calculations and the actual final costs. /TRRL/
-
Corporate Authors:
Forschungsgesellschaft Strassenwesen in Oeiav
Eschenbachgasse 9
A-1010 Vienna, Austria - Publication Date: 0
Language
- German
Media Info
- Features: Figures;
- Pagination: p. 9-12
-
Serial:
- Schriftenreihe FGS
- Issue Number: 67
- Publisher: Forschungsgesellschaft Strassenwesen in Oeiav
Subject/Index Terms
- TRT Terms: Aggregate gradation; Construction; Costs; Cross sections; Spacing; Specifications; Structural design; Traffic engineering; Tunnels
- Uncontrolled Terms: Construction costs; Tunnel design
- Old TRIS Terms: Gradation /special type/
- ITRD Terms: 6405: Axis; 6404: Cross section; 237: Economic efficiency; 4053: Geology; 143: Planning; 3374: Tunnel
- Subject Areas: Bridges and other structures; Construction; Finance; Highways;
Filing Info
- Accession Number: 00189512
- Record Type: Publication
- Source Agency: Bundesanstalt für Straßenwesen (BASt)
- Files: ITRD, TRIS
- Created Date: Apr 12 1979 12:00AM