"GEISMAR" RELAYING METHODS
Comprehensive description of three methods for laying new track, replacing existing track or replacing complete turnouts. The first method involves laying pre-assembled panels after removal of existing track using hydraulic lifting trolleys; the second involves laying new track or repositioning existing track using portal gantries and the third involves laying or replacement of turnouts.
-
Corporate Authors:
International Railway Congress Association
17-21 rue de Louvrain
1000 Brussels, Belgium -
Authors:
- Carre, J F
- Publication Date: 1978-10
Media Info
- Features: Photos;
- Pagination: p. 776-783
-
Serial:
- RAIL INTERNATIONAL
- Volume: 9
- Issue Number: 10
Subject/Index Terms
- TRT Terms: Maintenance of way; Railroad turnouts; Track laying; Track panels
- Old TRIS Terms: Track maintenance equipment
- Subject Areas: Maintenance and Preservation; Railroads;
Filing Info
- Accession Number: 00189044
- Record Type: Publication
- Source Agency: International Union of Railways
- Files: TRIS
- Created Date: Apr 25 1979 12:00AM