Double Your Striping Productivity
This article describes how contractors can significantly increase their striping productivity by motorizing their walk-behind stripers. The striper can be equipped with a tractor add-on that allows the worker to drive around the parking lot. The riding machine allows the operator to save time between striping lanes by enabling him to back up or make a circle to come onto the next line quickly. It also reduces worker fatigue. Estimates show a productivity gain of 33-40% over conventional walk-behind stripers. Although driver add-ons are the most common type of this equipment, one manufacturer has introduced a one-unit machine that combines a striper with a riding lawn mower.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/38839621
-
Authors:
- Heydorn, Allan
- Publication Date: 2007-5
Language
- English
Media Info
- Media Type: Print
- Features: Photos;
- Pagination: pp 10, 12-14, 16-17
-
Serial:
- Pavement Maintenance & Reconstruction
- Volume: 22
- Issue Number: 4
- Publisher: Cygnus Business Media
- ISSN: 1098-5875
Subject/Index Terms
- TRT Terms: Construction equipment; Fatigue (Physiological condition); Labor productivity; New products; Parking lots; Striping
- Subject Areas: Highways; Maintenance and Preservation; Terminals and Facilities; Vehicles and Equipment; I61: Equipment and Maintenance Methods;
Filing Info
- Accession Number: 01054116
- Record Type: Publication
- Files: TRIS
- Created Date: Jul 24 2007 10:55AM