SHORE DISPOSAL OF SHIP GENERATED SEWAGE AT ACTIVITIES IN THE EASTERN AREA. VOLUME 2

The report contains maps and drawings showing existing conditions, ship berthing and proposed sewerage facilities for 40 activities under the study. There are two berthing plans shown for most of these activities. They are designated, 'Design Maximum Loading of Individual Berthing Facilities', showing the maximum berthing capability of each pier, wharf and quay; and 'Typical Berth Employment for a Maximum Day', showing the maximum ship berthing experienced or expected at the port, except during a national emergency. These berthing plans were used to design the proposed sewerage systems as described in Volume I. Shore facilities, to receive ship sewage, have been constructed at the Naval Shipyard, Portsmouth, New Hampshire and Naval Training Center, Great Lakes, Illinois. Figures are included to show the method used at these activities.(Author)

  • Supplemental Notes:
    • See also Volume 1, MRIS #041452.
  • Corporate Authors:

    Reynolds, Smith and Hills

    Jacksonville, FL  United States 
  • Authors:
    • Harding, C I
    • Ruckman, D K
  • Publication Date: 1969-6-1

Media Info

  • Pagination: 283 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00041451
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: Final Rpt
  • Contract Numbers: N00025-69-C-0004
  • Files: TRIS
  • Created Date: Mar 2 1974 12:00AM