TTC REPLACES VIADUCT BEAMS BY DRILLING HOLES THROUGH ROADWAY ABOVE
The paper reports how the Toronto Transit Commission successfully replaced four 9 t precast concrete beams on the subway under the Bloor Viaduct by drilling holes through the roadway above and lowering and raising the beams by two mobile cranes.
-
Corporate Authors:
Southam Business Publications Limited
1450 Don Mills Road
Don Mills, ONo, Canada -
Authors:
- Hancock, N
- Publication Date: 1978-4
Media Info
- Pagination: p. 44-45
-
Serial:
- Engineering and Contract Record
- Volume: 91
- Issue Number: 4
- Publisher: Southam Business Publications
Subject/Index Terms
- TRT Terms: Beams; Bridges; Concrete; Concrete bridges; Construction; Maintenance; Rapid transit; Repairing; Roads; Subways; Viaducts
- Identifier Terms: Toronto Transit Commission
- Uncontrolled Terms: Concrete beams
- Old TRIS Terms: Beams and girders; Bridge repairs; Viaduct beams
- Subject Areas: Bridges and other structures; Construction; Highways; Maintenance and Preservation; Public Transportation;
Filing Info
- Accession Number: 00180331
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Oct 12 1981 12:00AM