Getting ready for the big freeze

The preparations undertaken by the Highways Agency in the UK to prepare for the winter 2005/2006 are described. These included developing a new Winter Service Plan for each Agency area; inspecting and servicing snowplough gritters, plant and salt loading hoppers; ensuring there are enough trained gritter operatives; conducting maintenance on Winter Service Compounds; and restocking Salt Storage Barns. The Highways Agency's 33 Road Weather Information Stations and liaison with the Met Office have an important role in weather forecasting. A number of simulated Snow Desk scenarios are held in October to test the systems. Precautionary salting (10-20 g/m2 dosage) is undertaken when there is a risk of freezing temperatures. All gritting routes can be completed within 3 hours of an instruction. During snowfall conditions, salt can be spread at up to 40 g/m2, supplemented by snow ploughing. The Highways Agency has 23 Snow Blowers, located at known trouble spots. Highways Agency Traffic Officers patrol roads to help drivers in trouble and reduce delays

Language

  • English

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01027088
  • Record Type: Publication
  • Source Agency: Transport Research Laboratory
  • Files: ITRD
  • Created Date: Jul 5 2006 12:21PM