Portable Concrete Traffic Barrier for Maintenance Operations
The objective of this project is to develop and test a portable barrier system for high-speed applications that can be easily transported and erected by Texas Department of Transportation (TxDOT) maintenance forces using readily available equipment such as a front-end loader. Consideration was given to factors such as segment length, segment weight, connection method, barrier constructability, and dynamic barrier deflection. A deflection constraint of 3 ft was imposed by the project panel. Based on the results of the testing and evaluation reported herein, the new precast, cross-bolt, F-shape concrete traffic barrier with 10-ft barrier segments is considered suitable for implementation on high-speed roadways. The cross-bolt connection system adapted for use in the new barrier helps limit dynamic deflection during an impact. When subjected to a crash test with an impact severity 15% greater than currently required in National Cooperative Highway Research Program (NCHRP) Report 350, the barrier deflected only 27 in. This is the lowest deflection of any free-standing, portable concrete barrier approved to NCHRP Report 350 requirements other than TxDOT's X-bolt barrier with 30-ft segments. The low deflection and ease of placement and repair make the barrier well suited for maintenance and work zone operations.
- Record URL:
-
-
Supplemental Notes:
- Project Title: Development of Portable Concrete Traffic Barriers for Maintenance Operations.
-
Corporate Authors:
Texas Transportation Institute
Texas A&M University System, 3135 TAMU
College Station, TX United States 77843-3135Texas Department of Transportation
Research and Technology Implementation Office, P.O. Box 5080
Austin, TX United States 78763-5080Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC United States 20590 -
Authors:
- Bligh, Roger P
- Sheikh, Nauman M
- Menges, Wanda L
- Haug, Rebecca R
- Publication Date: 2005-5
Language
- English
Media Info
- Media Type: Print
- Edition: Technical Report
- Features: Appendices; Figures; Photos; References; Tables;
- Pagination: 70p
Subject/Index Terms
- TRT Terms: Crash tests; Deflection; Temporary barriers; Work zone traffic control
- Identifier Terms: NCHRP Report 350
- Uncontrolled Terms: High speed roads
- Subject Areas: Highways; Maintenance and Preservation; Operations and Traffic Management; Research; I60: Maintenance; I73: Traffic Control;
Filing Info
- Accession Number: 01011195
- Record Type: Publication
- Report/Paper Numbers: FHWA/TX-05/0-4692-1
- Contract Numbers: Project 0-4692
- Files: TRIS, USDOT, STATEDOT
- Created Date: Dec 30 2005 9:18AM