AHP-Based Equipment Selection Model for Construction Projects
Selection of equipment for construction projects, a key factor in the success of the project, is a complex process. Current models offered by the literature fail to provide adequate solutions for two major issues: the systematic evaluation of soft factors, and the weighting of soft benefits in comparison with costs. This paper presents a selection model based on analytic hierarchy process (AHP), a multiattribute decision analysis method, with a view to providing solutions for these two issues. The model has the capacity to handle a great number of different criteria in a way that truly reflects the complex reality, to incorporate the context and unique conditions of the project, and to allow for manifestation of user experience and subjective perception. The model was implemented in an in-house developed system that was improved and validated through testing by senior professionals. The main academic contribution of the study is in the modification of AHP to correspond with the nature of equipment selection and in its utilization as an effective means for the formalization of knowledge possessed by competent, experienced practitioners. On the practical side, the proposed model offers an efficient, convenient tool that forces the users into orderly, methodical thinking, guides them in making logical, consistent decisions, and provides a facility for all necessary computations.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/8675438
-
Authors:
- Shapira, Aviad
- Goldenberg, Marat
- Publication Date: 2005-12
Language
- English
Media Info
- Media Type: Print
- Features: Figures; References; Tables;
- Pagination: pp 1263-1273
-
Serial:
- Journal of Construction Engineering and Management
- Volume: 131
- Issue Number: 12
- Publisher: American Society of Civil Engineers
- ISSN: 0733-9364
- EISSN: 1943-7862
- Serial URL: http://ascelibrary.org/journal/jcemd4
Subject/Index Terms
- TRT Terms: Benefit cost analysis; Construction equipment; Construction management; Cost control; Decision making
- Uncontrolled Terms: Analytic model; Selection criteria
- Subject Areas: Construction; Highways; Maintenance and Preservation; Vehicles and Equipment; I61: Equipment and Maintenance Methods;
Filing Info
- Accession Number: 01013392
- Record Type: Publication
- Files: TRIS
- Created Date: Dec 22 2005 10:30AM