Financial Risk Analysis of Project Finance in Indonesian Toll Roads
This paper identifies, quantifies, and evaluates major financial risks associated with project-financed toll road projects in Indonesia. Ordering payments by priority level, subject to cash availability, enables risk to be evaluated from the different perspectives of multiple parties involved. The paper makes use of Latin Hypercube simulation for risk analysis because they deal with problems involving large and complex systems. To better illustrate the concept, a case study is presented.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/8675438
-
Authors:
- Wibowo, Andreas
- Kochendoerfer, Bernd
- Publication Date: 2005-9
Language
- English
Media Info
- Media Type: Print
- Features: Figures; References; Tables;
- Pagination: pp 963-972
-
Serial:
- Journal of Construction Engineering and Management
- Volume: 131
- Issue Number: 9
- Publisher: American Society of Civil Engineers
- ISSN: 0733-9364
- EISSN: 1943-7862
- Serial URL: http://ascelibrary.org/journal/jcemd4
Subject/Index Terms
- TRT Terms: Build operate transfer; Case studies; Contracts; Financing; Risk analysis; Road construction industry; Simulation; Toll roads
- Geographic Terms: Indonesia
- Subject Areas: Administration and Management; Construction; Highways; Planning and Forecasting; I21: Planning of Transport Infrastructure;
Filing Info
- Accession Number: 01004211
- Record Type: Publication
- Files: TRIS
- Created Date: Sep 28 2005 10:15AM