BACK-WALL GROUTING USING ACRYLAMIDE SUCCESSFULLY USED IN TORONTO'S SUBWAY
Plagued by leakage problems since the time they were constructed, Toronto's underground network of subway tunnels and structures has undergone a major leak remediation program. The spring of 2004 marks the seventh year of a very successfully implemented solution grouting program. This project has been the largest on-going solution grouting project in North America for the last five years. The Toronto Transit Commission's water problems were brought under control with the use of "back-wall" grouting technique that took into account the multiple phase, multiple stage grouting operations that were anticipated and required to successfully shut off the leakage problems. The water infiltration problems were causing accelerated aging of the rail and rail fastening systems, deterioration and malfunction of electrical systems and their components and decay of the structure itself as well as causing both service delays and concerns for passenger safety. All the work had to be performed during the nightly two-hour maintenance working window without impact to customer service. This paper hopes to provide some helpful insight on the key aspects of this specific sealing system engineered and designed to solve Toronto's subway tunnel and station leakage problems. This successful design continues to be the leak remediation solution of choice for this public transportation authority.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/isbn/0784407444
-
Corporate Authors:
American Society of Civil Engineers
Geo-Institute
Reston, VA United States 20191-4400 -
Authors:
- Narduzzo, L
-
Conference:
- Geotechnical Engineering for Transportation Projects, Geo-Trans 2004
- Location: Los Angeles, California
- Date: 2004-7-27 to 2004-7-31
- Publication Date: 2004
Language
- English
Media Info
- Features: Tables;
- Pagination: 8 p.
-
Serial:
- ASCE Geotechnical Special Publication
- Issue Number: 126
- Publisher: American Society of Civil Engineers
Subject/Index Terms
- TRT Terms: Back; Deterioration; Electrical systems; Grouting; Leakage; Rail fasteners; Structures; Subway stations; Subways; Tunnels; Underground structures; Walls
- Geographic Terms: Toronto (Canada)
- Subject Areas: Bridges and other structures; Design; Highways; I24: Design of Bridges and Retaining Walls;
Filing Info
- Accession Number: 00988606
- Record Type: Publication
- ISBN: 0784407444
- Report/Paper Numbers: Volume II
- Files: TRIS
- Created Date: Apr 5 2005 12:00AM