HIGH SPEED TRACK ON THE WESTERN REGION OF BRITISH RAILWAYS. PART 1
This paper describes the work which has been and is still being carried out to provide the necessary track standards for 125 mile/h running between London and the outskirts of Bristol. The very large number of items of work, including realignment, ballasting, treatment of the foundation, switch and crossing work, remodelling and elimination of level crossings, required the special provision of resources, and occupations of the line which in one case involved the closure of a route (the Badminton line) for 5 months continuously. Each type of work is dealt with, and selected items such as the major realignment at Twyford and the work on the Badminton line, are described in more detail.
-
Corporate Authors:
Institution of Civil Engineers
One Great George Street, Westminster
London, United Kingdom SW1P 3AA -
Authors:
- COLLINS, R J
- Black, J
- Tyrer, J E
- Conference:
- Publication Date: 1978-5
Media Info
- Features: References;
- Pagination: p. 207-225
-
Serial:
- Volume: 64
Subject/Index Terms
- TRT Terms: Alignment; High speed track; Maintenance of way; Pavement subgrade; Railroad grade crossings; Railroad tracks; Soil stabilization; Track ballast
- Uncontrolled Terms: Ballast
- Old TRIS Terms: Grade crossing elimination; Track alignment; Track structures
- Subject Areas: Geotechnology; Railroads;
Filing Info
- Accession Number: 00179132
- Record Type: Publication
- Source Agency: Institution of Civil Engineers
- Files: TRIS
- Created Date: Jul 29 1978 12:00AM